Bridge conditions in Barceloneta Municipio, Puerto Rico
11 inventoried bridges · 0 closed · 2 posted · 2 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
FairPoor All 11 bridges.
Barceloneta Municipio has 2 bridges rated poor out of 11 inventoried, a 18.2% share that puts it well above the national rate of about 7%.
- 2 of the 11 bridges in Barceloneta Municipio, Puerto Rico, are rated in poor condition (18.2%) in the 2025 National Bridge Inventory, as of .
- Barceloneta Municipio has no bridges closed to all traffic and 2 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; no bridges had at least one major component rating lowered, 1 newly load-posted.
- Inspection dates on record run from March 2023 to December 2024.
- 0 bridges (0.0%) are rated good and 9 (81.8%) fair.
- The median Barceloneta Municipio bridge was built in 1992.
- The busiest poor-rated bridge is Pr 22 over Pajuil Street (built 1992), carrying about 51,500 vehicles a day.
What this page is: the federal bridge inspection inventory for Barceloneta Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 0.0% · Fair 81.8% · Poor 18.2% of 11 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 684 over Bocas Channel | newly posted for load | Fair | Fair | 1,600 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr-140 over Unnamed Creek | load posting removed | Fair | Fair | 2,600 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 681 16.7 Km over CA¥O Tiburones | posted for load | 1950 | 3,300 | February 2024 | Poor |
| Pr 684 over Bocas Channel | posted for load | 1957 | 1,600 | April 2023 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 1 on 12 months or less, 10 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Barceloneta Municipio is dated December 2024; 5 bridges have an inspection dated in 2024.
Scour critical (item 113): no bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 22 over Pajuil Street | 1992 | 51,500 | Poor |
| Pr 681 16.7 Km over CA¥O Tiburones | 1950 | 3,300 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 22 over Pajuil Street | 1992 | 51,500 | Poor |
| Pr 22 Westbound over MANATI RIVER PR 204 & | 1994 | 47,900 | Fair |
| Pr 22 59.3 Km over Street 3 1.0 Km | 1992 | 43,800 | Fair |
| Pr 22 59.1 Km over Rural Local Road | 1992 | 43,800 | Fair |
| Pr 22 over Pr 140 | 1992 | 43,800 | Fair |
| Pr 22 Eastbound over MANATI RIVER PR 204 & | 1994 | 23,950 | Fair |
| Pr 667 over Depression | 1954 | 7,800 | Fair |
| Pr-140 over Drainage Channel | 1969 | 7,500 | Fair |
| Pr 681 16.7 Km over CA¥O Tiburones | 1950 | 3,300 | Poor |
| Pr-140 over Unnamed Creek | 2015 | 2,600 | Fair |
Frequently asked questions
Are any bridges closed in Barceloneta Municipio, Puerto Rico?
No bridges of the 11 in Barceloneta Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 2 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Barceloneta Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Barceloneta Municipio: no bridges with a component rated 2 (critical) or lower, 2 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Barceloneta Municipio last inspected?
Inspection dates in the 2025 inventory for Barceloneta Municipio run from March 2023 to December 2024. Intervals: 1 on 12 months or less, 10 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Barceloneta Municipio → - all 11, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.