BridgeReportCard
Home › Puerto Rico › Barranquitas Municipio

Bridge conditions in Barranquitas Municipio, Puerto Rico

15 inventoried bridges · 0 closed · 4 posted · 3 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 15 bridges.

About one in 5 bridges in Barranquitas Municipio is rated in poor condition: 3 of 15 on the federal inventory, one of the higher shares in Puerto Rico.

What this page is: the federal bridge inspection inventory for Barranquitas Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 20.0% · Fair 60.0% · Poor 20.0% of 15 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

0
dropped into poor
since 2024
0
improved out of poor
since 2024
0
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

No bridge in Barranquitas Municipio dropped a condition class, lost a point on a component rating, or was newly closed or posted between the two inventories.

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 156 9.5 Km over Botijas Riverload posting removedPoorPoor3,600
Pr 558 0.2 Km over Usabon Riverload posting removedPoorPoor400

1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 156 over Barranquitas Riverposted for load190811,900September 2023Fair
Pr 156 over Barranquitas Riverposted for load19115,000May 2023Fair
Local Road over Pi%ona Riverposted for load1986500October 2023Fair
0FF Pr-156 AT13.50 over Tres Cruces Riverposted for load2011100October 2023Good
Pr 162 14.1 Km over Usabon Riveropen on a temporary structure19081,400November 2024Poor

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 4 on 12 months or less, 11 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Barranquitas Municipio is dated November 2024; 6 bridges have an inspection dated in 2024.

Scour critical (item 113): 7 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 2 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 156 over Barranquitas Riverposted for load190811,900September 2023Fair
Pr 156 over Barranquitas Riverposted for load19115,000May 2023Fair
Pr 771 over Barrancas Creekopen19654,800May 2023Fair
Pr 162 over Usabon Riveropen19084,300November 2024Fair
Pr 156 9.5 Km over Botijas Riveropen19403,600February 2024Poor
Pr 162 14.1 Km over Usabon Riveropen on a temporary structure19081,400November 2024Poor
Pr 558 0.2 Km over Usabon Riveropen1968400August 2024Poor

Bridges with a component rated 2 or lower

2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 162 14.1 Km over Usabon Riveropen on a temporary structure19081,400November 2024Poor

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Pr 156 9.5 Km over Botijas River19403,600Poor
Pr 162 14.1 Km over Usabon River19081,400Poor
Pr 558 0.2 Km over Usabon River1968400Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 156 over Barranquitas River190811,900Fair
Pr 152R 1.4 Km over Padilla Creek198111,900Fair
Pr 152R over Pi%ona River199811,900Good
Pr 771 over Barrancas Creek19655,500Fair
Pr 156 over Barranquitas River19115,000Fair
Pr 771 over Barrancas Creek19654,800Fair
Pr 771 over Barrancas Creek19654,800Fair
Pr 162 over Usabon River19084,300Fair
Pr 156 9.5 Km over Botijas River19403,600Poor
Pr 162 14.1 Km over Usabon River19081,400Poor

Frequently asked questions

Are any bridges closed in Barranquitas Municipio, Puerto Rico?

No bridges of the 15 in Barranquitas Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 4 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Barranquitas Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Barranquitas Municipio: 1 bridge with a component rated 2 (critical) or lower, 3 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Barranquitas Municipio last inspected?

Inspection dates in the 2025 inventory for Barranquitas Municipio run from May 2023 to November 2024. Intervals: 4 on 12 months or less, 11 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Barranquitas Municipio → - all 15, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.