Bridge conditions in Cayey Municipio, Puerto Rico
82 inventoried bridges · 9 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
Cayey Municipio has 9 bridges rated poor out of 82 inventoried, a 11.0% share that puts it well above the national rate of about 7%.
- 9 of the 82 bridges in Cayey Municipio, Puerto Rico, are rated in poor condition (11.0%) in the 2025 National Bridge Inventory, as of .
- 5 bridges (6.1%) are rated good and 68 (82.9%) fair.
- The median Cayey Municipio bridge was built in 1972.
- The busiest poor-rated bridge is Pr 52 SB 48.7 Km over Depression (built 1974), carrying about 16,450 vehicles a day.
Good 6.1% · Fair 82.9% · Poor 11.0% of 82 bridges
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 52 SB 48.7 Km over Depression | 1974 | 16,450 | Poor |
| Pr 14 over Maton River | 1886 | 10,700 | Poor |
| Central Av 0.1 Km over Unnamed Creek | 1994 | 8,500 | Poor |
| Pr 1 over Maton River | 1927 | 8,300 | Poor |
| Rural Local Road over Chiquito De Maton River | 1976 | 600 | Poor |
| Pr 730 3.9 Km over Maton Arriba Creek | 1991 | 600 | Poor |
| Local Road over Maton River | 1990 | 600 | Poor |
| Pr 7731 0.85 Km over La Plata River | 1935 | 500 | Poor |
| Pr 708 5.1 Km over Creek | 1965 | 300 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 52 Northbound over Pr 184 | 1972 | 91,700 | Fair |
| Pr 52 Southbound over Pr 184 | 1972 | 91,700 | Fair |
| Pr 52 Northbound over Pr 7786 | 1972 | 91,700 | Fair |
| Pr 52 Soub 31.5 Km over Pr 7786 0.4 Km | 1972 | 91,700 | Fair |
| Pr 52 Southbound over Pr 738 | 1971 | 65,700 | Fair |
| Pr 52 Northbound over Pr 738 | 1971 | 65,700 | Fair |
| Pr 52 over La Ley Street | 1973 | 65,700 | Fair |
| Pr 52 Southbound over La Ley Street | 1973 | 65,700 | Fair |
| Pr 52 Northbound over Access Road to Pr 1 | 1973 | 65,700 | Fair |
| Pr 52 Southbound over Pr 15 | 1973 | 32,900 | Fair |
Source: FHWA National Bridge Inventory, 2025. Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
All of Puerto Rico: Puerto Rico bridge conditions by county · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.