BridgeReportCard
Home › Puerto Rico › Ceiba Municipio

Bridge conditions in Ceiba Municipio, Puerto Rico

28 inventoried bridges · 0 closed · 2 posted · 3 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 28 bridges.

Ceiba Municipio has 3 bridges rated poor out of 28 inventoried, a 10.7% share that puts it well above the national rate of about 7%.

What this page is: the federal bridge inspection inventory for Ceiba Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 10.7% · Fair 78.6% · Poor 10.7% of 28 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

0
dropped into poor
since 2024
0
improved out of poor
since 2024
2
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
PR53 9.5KM 58.9KM over Quebrada Seca Creekgood to fair; culvert 7 to 6GoodFair15,500
Pr 975 0.5 Km over Ceiba Creekdeck 7 to 6FairFair5,600

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 53 over Seca Creekload posting removedGoodGood15,500
Pr 3 over Seca Creekload posting removedFairFair3,000
Pr 975 6.7 Km over Rio Abajo Creekload posting removedPoorPoor1,200
Local Road over Aguas Claras Creekload posting removedFairFair200

no structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 971 10.7 Km over Creekposted for load19603,600March 2025Poor
Pr 976 8.6 Km over Juan Diego Creekposted for load19542,900August 2024Fair
Pr 975 6.7 Km over Rio Abajo Creekopen, posting recommended19581,200April 2024Poor
Local Road over Aguas Claras Creekopen, posting recommended1968200June 2023Fair

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 6 on 12 months or less, 22 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Ceiba Municipio is dated March 2025; 2 bridges have an inspection dated in 2025.

Scour critical (item 113): 3 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 971 over Fajardo Riveropen19613,600June 2023Fair
Pr-3 over Daguao Riveropen19233,600June 2023Fair
Local Road over Aguas Claras Creekopen, posting recommended1968200June 2023Fair

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Pr 971 10.7 Km over Creek19603,600Poor
Pr 979 0.75 Km over El CA¥O Creek19183,300Poor
Pr 975 6.7 Km over Rio Abajo Creek19581,200Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 53 11.5 Km over Pr 974 and Daguao River199627,200Fair
Pr 53 0.4 Km over Pr 978 5.9 Km199422,400Fair
Pr 53 over CEIBA CREEK & PR 975199422,200Fair
Pr 53 3.55 Km over Aguas Claras Creek199419,100Fair
Pr 53 over Dirt Road199419,100Fair
PR53 9.5KM 58.9KM over Quebrada Seca Creek199615,500Fair
Pr 53 over Pr 3199615,500Fair
Pr 53 over Pr 3199615,500Fair
Pr 53 over Seca Creek199615,500Good
Pr 53 over Waterway199615,500Fair

Frequently asked questions

Are any bridges closed in Ceiba Municipio, Puerto Rico?

No bridges of the 28 in Ceiba Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 2 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Ceiba Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Ceiba Municipio: no bridges with a component rated 2 (critical) or lower, 3 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Ceiba Municipio last inspected?

Inspection dates in the 2025 inventory for Ceiba Municipio run from June 2023 to March 2025. Intervals: 6 on 12 months or less, 22 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Ceiba Municipio → - all 28, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.