Bridge conditions in Cidra Municipio, Puerto Rico
21 inventoried bridges · 0 closed · 10 posted · 4 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 21 bridges.
About one in 5 bridges in Cidra Municipio is rated in poor condition: 4 of 21 on the federal inventory, one of the higher shares in Puerto Rico.
- 4 of the 21 bridges in Cidra Municipio, Puerto Rico, are rated in poor condition (19.0%) in the 2025 National Bridge Inventory, as of .
- Cidra Municipio has no bridges closed to all traffic and 10 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 2 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; 3 bridges had at least one major component rating lowered, 1 newly load-posted.
- Inspection dates on record run from April 2023 to March 2025; 6 bridges over water are coded scour critical.
- 2 bridges (9.5%) are rated good and 15 (71.4%) fair.
- The median Cidra Municipio bridge was built in 1969.
- The busiest poor-rated bridge is Pr 172 13.7 Km over Sabana River (built 1944), carrying about 20,500 vehicles a day.
What this page is: the federal bridge inspection inventory for Cidra Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 9.5% · Fair 71.4% · Poor 19.0% of 21 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Cam Del Arroyata over Rio Arroyata | newly posted for load | Good | Good | 6,800 |
| Pr 171 6.0 Km over La Plata River | good to fair; deck 7 to 6 | Good | Fair | 8,300 |
| Pr 172 9.0 Km over La Joyuela Creek | deck 4 to 3; superstructure 4 to 3 | Poor | Poor | 3,200 |
| Pr 172 15.1 Km over Bayamon River | substructure 5 to 4 | Poor | Poor | 14,400 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Local Road over Rio Arroyata | load posting removed | Fair | Fair | 6,800 |
| Pr 172 8.8 Km over El Chorro Creek | load posting removed | Poor | Poor | 3,200 |
| Access to Urb. over Cidra Lake | load posting removed | Fair | Fair | 150 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 172 13.7 Km over Sabana River | posted for load | 1944 | 20,500 | June 2024 | Poor |
| Pr 172 15.1 Km over Bayamon River | posted for load | 1944 | 14,400 | September 2024 | Poor |
| Off Pr 172 13.3 Km over Cidra Lake | posted for load | 2011 | 11,900 | June 2024 | Fair |
| Off Pr 172 13.3 Km over Cidra Reservoir Dam | posted for load | 2011 | 11,900 | January 2024 | Fair |
| Pr 173 17.1 Km over Bayamon River | posted for load | 1949 | 9,600 | April 2024 | Fair |
| Cam Del Arroyata over Rio Arroyata | posted for load | 2014 | 6,800 | September 2023 | Good |
| Pr 171 over Creek | posted for load | 1950 | 6,400 | November 2023 | Fair |
| Pr 171 1.1 Km over El Cabro Creek | posted for load | 1950 | 4,900 | March 2025 | Fair |
| Pr 787 over Bayamon River | posted for load | 1918 | 4,500 | April 2023 | Fair |
| Pr 172 9.0 Km over La Joyuela Creek | posted for load | 1925 | 3,200 | November 2024 | Poor |
| Local Road over Rio Arroyata | open, posting recommended | 1984 | 6,800 | September 2023 | Fair |
| Pr 172 8.8 Km over El Chorro Creek | open, posting recommended | 1925 | 3,200 | June 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 6 on 12 months or less, 15 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Cidra Municipio is dated March 2025; 1 bridges have an inspection dated in 2025.
Scour critical (item 113): 6 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 1 bridge. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 172 13.7 Km over Sabana River | posted for load | 1944 | 20,500 | June 2024 | Poor |
| Pr 171 0.7 Km over Arroyata Creek | open | 1950 | 9,700 | June 2024 | Fair |
| Pr 173 17.1 Km over Bayamon River | posted for load | 1949 | 9,600 | April 2024 | Fair |
| Pr 171 over Creek | posted for load | 1950 | 6,400 | November 2023 | Fair |
| Pr 171 1.1 Km over El Cabro Creek | posted for load | 1950 | 4,900 | March 2025 | Fair |
| Pr 172 8.8 Km over El Chorro Creek | open, posting recommended | 1925 | 3,200 | June 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 172 13.7 Km over Sabana River | 1944 | 20,500 | Poor |
| Pr 172 15.1 Km over Bayamon River | 1944 | 14,400 | Poor |
| Pr 172 8.8 Km over El Chorro Creek | 1925 | 3,200 | Poor |
| Pr 172 9.0 Km over La Joyuela Creek | 1925 | 3,200 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 172 13.7 Km over Sabana River | 1944 | 20,500 | Poor |
| Pr 172 over Sabana River | 2011 | 20,500 | Good |
| Pr 172 15.1 Km over Bayamon River | 1944 | 14,400 | Poor |
| Off Pr 1 51.5 Km over Beatriz Creek | 2012 | 13,900 | Fair |
| Off Pr 172 13.3 Km over Cidra Reservoir Dam | 2011 | 11,900 | Fair |
| Off Pr 172 13.3 Km over Cidra Lake | 2011 | 11,900 | Fair |
| Pr 171 0.7 Km over Arroyata Creek | 1950 | 9,700 | Fair |
| Pr 173 17.1 Km over Bayamon River | 1949 | 9,600 | Fair |
| Pr 171 6.0 Km over La Plata River | 2000 | 8,300 | Fair |
| Pr 184 33.3 Km over Beatriz Creek | 1969 | 7,600 | Fair |
Frequently asked questions
Are any bridges closed in Cidra Municipio, Puerto Rico?
No bridges of the 21 in Cidra Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 10 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Cidra Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Cidra Municipio: no bridges with a component rated 2 (critical) or lower, 4 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Cidra Municipio last inspected?
Inspection dates in the 2025 inventory for Cidra Municipio run from April 2023 to March 2025. Intervals: 6 on 12 months or less, 15 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Cidra Municipio → - all 21, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.