Bridge conditions in Comerío Municipio, Puerto Rico

16 inventoried bridges · 0 closed · 6 posted · 0 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFair All 16 bridges.

Comerío Municipio is one of the counties with a clean sheet: 16 bridges on the federal inventory and not one rated poor. 13 carry a fair rating, which means wear worth watching but no structural deficiency.

What this page is: the federal bridge inspection inventory for Comerío Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 18.8% · Fair 81.2% · Poor 0.0% of 16 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

0
dropped into poor
since 2024
0
improved out of poor
since 2024
2
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Pr-156 28.8 Km over Hondo Riverload posting removed; good to fair; deck 7 to 5GoodFair1,200
Pr 740 0.1 Km over La Plata Riverdeck 6 to 5FairFair7,000

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 778 1.9 Km over Waterwayload posting removedGoodGood1,000

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 156 32.7 Km over Convento Creekposted for load19817,900May 2024Fair
Pr 740 0.1 Km over La Plata Riverposted for load19967,000May 2024Fair
Pr 775 over Piñas Creekposted for load19402,200May 2024Fair
Pr 172 over Naranjito Creekposted for load19201,500March 2023Fair
Pr 7774 Km 0.2 over Piñas Creekposted for load19691,000April 2024Fair
Pr 7776 over Hondo Riverposted for load1943300June 2024Fair

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 1 on 12 months or less, 15 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Comerío Municipio is dated August 2024; 9 bridges have an inspection dated in 2024.

Scour critical (item 113): 7 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 156 over Arroyata Riveropen19915,200June 2023Fair
Pr 156 over Higuero Creekopen19863,600July 2023Fair
Pr 156 over La Plata Riveropen19913,600June 2023Fair
Pr 775 over Piñas Creekposted for load19402,200May 2024Fair
Pr 172 over Naranjito Creekposted for load19201,500March 2023Fair
Pr 7774 Km 0.2 over Piñas Creekposted for load19691,000April 2024Fair
Pr 7776 over Hondo Riverposted for load1943300June 2024Fair

Bridges rated poor

No bridges in this county carry a poor rating in the current inventory.

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 156 32.7 Km over Convento Creek19817,900Fair
Pr 740 0.1 Km over La Plata River19967,000Fair
Pr 167 1.7 Km over DO¥A Elena Creek19996,200Fair
Pr 156 over Arroyata River19915,200Fair
Pr 156 over Higuero Creek19863,600Fair
Pr 156 over La Plata River19913,600Fair
Pr 156 over Naranjos Creek19983,400Good
Pr 775 over Piñas Creek19402,200Fair
Pr 172 over Naranjito Creek19201,500Fair
Pr-156 28.8 Km over Hondo River20011,200Fair

Frequently asked questions

Are any bridges closed in Comerío Municipio, Puerto Rico?

No bridges of the 16 in Comerío Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 6 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Comerío Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Comerío Municipio: no bridges with a component rated 2 (critical) or lower, no bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Comerío Municipio last inspected?

Inspection dates in the 2025 inventory for Comerío Municipio run from March 2023 to August 2024. Intervals: 1 on 12 months or less, 15 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Comerío Municipio → - all 16, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.