Bridge conditions in Comerío Municipio, Puerto Rico
16 inventoried bridges · 0 closed · 6 posted · 0 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFair All 16 bridges.
Comerío Municipio is one of the counties with a clean sheet: 16 bridges on the federal inventory and not one rated poor. 13 carry a fair rating, which means wear worth watching but no structural deficiency.
- 0 of the 16 bridges in Comerío Municipio, Puerto Rico, are rated in poor condition (0.0%) in the 2025 National Bridge Inventory, as of .
- Comerío Municipio has no bridges closed to all traffic and 6 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; 2 bridges had at least one major component rating lowered.
- Inspection dates on record run from March 2023 to August 2024; 7 bridges over water are coded scour critical.
- 3 bridges (18.8%) are rated good and 13 (81.2%) fair.
- The median Comerío Municipio bridge was built in 1991.
What this page is: the federal bridge inspection inventory for Comerío Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 18.8% · Fair 81.2% · Poor 0.0% of 16 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr-156 28.8 Km over Hondo River | load posting removed; good to fair; deck 7 to 5 | Good | Fair | 1,200 |
| Pr 740 0.1 Km over La Plata River | deck 6 to 5 | Fair | Fair | 7,000 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 778 1.9 Km over Waterway | load posting removed | Good | Good | 1,000 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 156 32.7 Km over Convento Creek | posted for load | 1981 | 7,900 | May 2024 | Fair |
| Pr 740 0.1 Km over La Plata River | posted for load | 1996 | 7,000 | May 2024 | Fair |
| Pr 775 over Piñas Creek | posted for load | 1940 | 2,200 | May 2024 | Fair |
| Pr 172 over Naranjito Creek | posted for load | 1920 | 1,500 | March 2023 | Fair |
| Pr 7774 Km 0.2 over Piñas Creek | posted for load | 1969 | 1,000 | April 2024 | Fair |
| Pr 7776 over Hondo River | posted for load | 1943 | 300 | June 2024 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 1 on 12 months or less, 15 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Comerío Municipio is dated August 2024; 9 bridges have an inspection dated in 2024.
Scour critical (item 113): 7 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 156 over Arroyata River | open | 1991 | 5,200 | June 2023 | Fair |
| Pr 156 over Higuero Creek | open | 1986 | 3,600 | July 2023 | Fair |
| Pr 156 over La Plata River | open | 1991 | 3,600 | June 2023 | Fair |
| Pr 775 over Piñas Creek | posted for load | 1940 | 2,200 | May 2024 | Fair |
| Pr 172 over Naranjito Creek | posted for load | 1920 | 1,500 | March 2023 | Fair |
| Pr 7774 Km 0.2 over Piñas Creek | posted for load | 1969 | 1,000 | April 2024 | Fair |
| Pr 7776 over Hondo River | posted for load | 1943 | 300 | June 2024 | Fair |
Bridges rated poor
No bridges in this county carry a poor rating in the current inventory.
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 156 32.7 Km over Convento Creek | 1981 | 7,900 | Fair |
| Pr 740 0.1 Km over La Plata River | 1996 | 7,000 | Fair |
| Pr 167 1.7 Km over DO¥A Elena Creek | 1999 | 6,200 | Fair |
| Pr 156 over Arroyata River | 1991 | 5,200 | Fair |
| Pr 156 over Higuero Creek | 1986 | 3,600 | Fair |
| Pr 156 over La Plata River | 1991 | 3,600 | Fair |
| Pr 156 over Naranjos Creek | 1998 | 3,400 | Good |
| Pr 775 over Piñas Creek | 1940 | 2,200 | Fair |
| Pr 172 over Naranjito Creek | 1920 | 1,500 | Fair |
| Pr-156 28.8 Km over Hondo River | 2001 | 1,200 | Fair |
Frequently asked questions
Are any bridges closed in Comerío Municipio, Puerto Rico?
No bridges of the 16 in Comerío Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 6 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Comerío Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Comerío Municipio: no bridges with a component rated 2 (critical) or lower, no bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Comerío Municipio last inspected?
Inspection dates in the 2025 inventory for Comerío Municipio run from March 2023 to August 2024. Intervals: 1 on 12 months or less, 15 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Comerío Municipio → - all 16, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.