BridgeReportCard
Home › Puerto Rico › Culebra Municipio

Bridge conditions in Culebra Municipio, Puerto Rico

1 inventoried bridges · 0 closed · 1 posted · 0 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

Good All 1 bridges.

Culebra Municipio is one of the counties with a clean sheet: 1 bridges on the federal inventory and not one rated poor. 0 carry a fair rating, which means wear worth watching but no structural deficiency.

What this page is: the federal bridge inspection inventory for Culebra Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 100.0% · Fair 0.0% · Poor 0.0% of 1 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

0
dropped into poor
since 2024
1
improved out of poor
since 2024
0
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

No bridge in Culebra Municipio dropped a condition class, lost a point on a component rating, or was newly closed or posted between the two inventories.

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 250 0.10 Km over Ensenada Channelpoor to good; deck up 7 to 8; superstructure up 3 to 8PoorGood4,500

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 250 0.10 Km over Ensenada Channelposted for load19794,500June 2024Good

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 1 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Culebra Municipio is dated June 2024; 1 bridges have an inspection dated in 2024.

Scour critical (item 113): no bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 1 bridge. These have steel tension members without a redundant load path and get their own scheduled inspections.

Bridges rated poor

No bridges in this county carry a poor rating in the current inventory.

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 250 0.10 Km over Ensenada Channel19794,500Good

Frequently asked questions

Are any bridges closed in Culebra Municipio, Puerto Rico?

No bridges of the 1 in Culebra Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 1 bridge is posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Culebra Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Culebra Municipio: no bridges with a component rated 2 (critical) or lower, no bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Culebra Municipio last inspected?

Inspection dates in the 2025 inventory for Culebra Municipio run from June 2024 to June 2024. Intervals: 1 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Culebra Municipio → - all 1, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.