Bridge conditions in Fajardo Municipio, Puerto Rico
20 inventoried bridges · 0 closed · 4 posted · 2 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 20 bridges.
Fajardo Municipio has 2 bridges rated poor out of 20 inventoried, a 10.0% share that puts it well above the national rate of about 7%.
- 2 of the 20 bridges in Fajardo Municipio, Puerto Rico, are rated in poor condition (10.0%) in the 2025 National Bridge Inventory, as of .
- Fajardo Municipio has no bridges closed to all traffic and 4 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 1 more bridge is open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; 4 bridges had at least one major component rating lowered.
- Inspection dates on record run from March 2023 to March 2025; 2 bridges over water are coded scour critical.
- 4 bridges (20.0%) are rated good and 14 (70.0%) fair.
- The median Fajardo Municipio bridge was built in 1988.
- The busiest poor-rated bridge is Pr 194 3.4 Km over Linea Creek (built 1882), carrying about 35,600 vehicles a day.
What this page is: the federal bridge inspection inventory for Fajardo Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 20.0% · Fair 70.0% · Poor 10.0% of 20 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr-3 over Rio Fajardo | good to fair; deck 7 to 6; superstructure 8 to 7 | Good | Fair | 24,700 |
| 11 Street 0.4 Km over Fajardo Creek | good to fair; deck 7 to 6 | Good | Fair | 500 |
| Pr 194 3.4 Km over Linea Creek | load posting removed; substructure 5 to 4 | Poor | Poor | 35,600 |
| Pr 977 4.55 Km over Fajardo River | deck 7 to 6 | Fair | Fair | 500 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 194 over Fajardo River | posted for load | 2005 | 22,200 | August 2023 | Good |
| Pr 984 0.6 Km over Waterway | posted for load | 1982 | 1,600 | March 2023 | Fair |
| Pr 984 1.0 Km over Juan Martin River | posted for load | 1950 | 1,600 | December 2024 | Fair |
| 11 Street 0.4 Km over Fajardo Creek | posted for load | 1984 | 500 | December 2023 | Fair |
| Pr 194 3.4 Km over Linea Creek | open, posting recommended | 1882 | 35,600 | December 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 4 on 12 months or less, 16 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Fajardo Municipio is dated March 2025; 1 bridges have an inspection dated in 2025.
Scour critical (item 113): 2 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 984 1.0 Km over Juan Martin River | posted for load | 1950 | 1,600 | December 2024 | Fair |
| Pr 984 5.15 Km over Naranjo Creek | open | 1966 | 600 | December 2024 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 194 3.4 Km over Linea Creek | 1882 | 35,600 | Poor |
| Pr 3 52.0 Km over Demajagua River | 1918 | 11,100 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 53 Soub 2.8 Km over Future Road | 1994 | 60,150 | Fair |
| Pr 194 3.4 Km over Linea Creek | 1882 | 35,600 | Poor |
| Pr 3 over Igualdad Street | 1958 | 27,200 | Fair |
| Pr 3 47.1 Km over Unnamed Creek | 1988 | 24,700 | Fair |
| Pr-3 over Rio Fajardo | 2019 | 24,700 | Fair |
| Pr 53 0.8 Km over Mata Redonda Creek | 1993 | 22,400 | Fair |
| Pr 53 1.8 Km over Connector to Pr 3 | 1993 | 22,400 | Good |
| Pr 194 over Fajardo River | 2005 | 22,200 | Good |
| Pr 53 over Pr 982 | 1994 | 19,100 | Fair |
| Pr 194 0.9 Km over Fajardo Creek | 1984 | 15,400 | Fair |
Frequently asked questions
Are any bridges closed in Fajardo Municipio, Puerto Rico?
No bridges of the 20 in Fajardo Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 4 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Fajardo Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Fajardo Municipio: no bridges with a component rated 2 (critical) or lower, 2 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Fajardo Municipio last inspected?
Inspection dates in the 2025 inventory for Fajardo Municipio run from March 2023 to March 2025. Intervals: 4 on 12 months or less, 16 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Fajardo Municipio → - all 20, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.