Bridge conditions in Florida Municipio, Puerto Rico
1 inventoried bridges · 0 closed · 1 posted · 1 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
Poor All 1 bridges.
Of the 1 Florida Municipio bridges in the federal inventory, 1 carry a poor rating. That 100.0% share is roughly 15x the national average.
- 1 of the 1 bridges in Florida Municipio, Puerto Rico, are rated in poor condition (100.0%) in the 2025 National Bridge Inventory, as of .
- Florida Municipio has no bridges closed to all traffic and 1 bridge posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; 1 bridge had at least one major component rating lowered.
- Inspection dates on record run from December 2024 to December 2024.
- 0 bridges (0.0%) are rated good and 0 (0.0%) fair.
- The median Florida Municipio bridge was built in 1924.
- The busiest poor-rated bridge is Pr 140 5.3 Km over Depression (built 1924), carrying about 1,200 vehicles a day.
What this page is: the federal bridge inspection inventory for Florida Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 0.0% · Fair 0.0% · Poor 100.0% of 1 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 140 5.3 Km over Depression | substructure 6 to 5 | Poor | Poor | 1,200 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 140 5.3 Km over Depression | posted for load | 1924 | 1,200 | December 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 1 on 12 months or less. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Florida Municipio is dated December 2024; 1 bridges have an inspection dated in 2024.
Scour critical (item 113): no bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 140 5.3 Km over Depression | 1924 | 1,200 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 140 5.3 Km over Depression | 1924 | 1,200 | Poor |
Frequently asked questions
Are any bridges closed in Florida Municipio, Puerto Rico?
No bridges of the 1 in Florida Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 1 bridge is posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Florida Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Florida Municipio: no bridges with a component rated 2 (critical) or lower, 1 bridge rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Florida Municipio last inspected?
Inspection dates in the 2025 inventory for Florida Municipio run from December 2024 to December 2024. Intervals: 1 on 12 months or less. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Florida Municipio → - all 1, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.