BridgeReportCard
Home › Puerto Rico › Guayama Municipio

Bridge conditions in Guayama Municipio, Puerto Rico

29 inventoried bridges · 0 closed · 5 posted · 4 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 29 bridges.

About one in 7 bridges in Guayama Municipio is rated in poor condition: 4 of 29 on the federal inventory, one of the higher shares in Puerto Rico.

What this page is: the federal bridge inspection inventory for Guayama Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 17.2% · Fair 69.0% · Poor 13.8% of 29 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

0
dropped into poor
since 2024
0
improved out of poor
since 2024
1
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Pr 54 0.8 Km over Guamani Riverdeck 6 to 5FairFair21,900

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Off Pr 747 0.2 Km over Trinidad Creekload posting removedPoorPoor800

1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 748 over Caimital Creekposted for load19664,400April 2023Fair
Pr 179 1.7 Km over Guamani Riverposted for load19253,800October 2024Fair
Pr 15 1.7 Km over Guamani Riverposted for load18911,800January 2024Poor
Calle 1 0.1 KM over Streamposted for load1901500August 2024Fair
Local Road over Guamani Riverposted for load1970200July 2023Fair
Off Pr 747 0.2 Km over Trinidad Creekopen, posting recommended1977800April 2024Poor

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 4 on 12 months or less, 25 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Guayama Municipio is dated March 2025; 1 bridges have an inspection dated in 2025.

Scour critical (item 113): 7 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 2 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 748 over Caimital Creekposted for load19664,400April 2023Fair
Pr 179 1.7 Km over Guamani Riverposted for load19253,800October 2024Fair
Pr 179 over Guamani Riveropen19252,800July 2023Fair
Pr 15 1.7 Km over Guamani Riverposted for load18911,800January 2024Poor
Pr 742 over Farallon Riveropen19751,400July 2023Fair
Off Pr 747 0.2 Km over Trinidad Creekopen, posting recommended1977800April 2024Poor
Pr 746 over Grande De Carite Riveropen1905400March 2025Poor

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Pr 748 over El Corazon Creek19506,300Poor
Pr 15 1.7 Km over Guamani River18911,800Poor
Off Pr 747 0.2 Km over Trinidad Creek1977800Poor
Pr 746 over Grande De Carite River1905400Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 54 over Unknown Creek199322,300Good
Pr 54 0.8 Km over Guamani River199221,900Fair
Pr 53 over Unknown Creek199421,700Fair
Pr 3 over Quebrada Corazon200317,600Fair
Pr-3 over Guamani River201214,100Good
Pr 53 Westbound over Dirt Road199410,850Fair
Pr 53 Eastbound over Dirt Road199410,850Fair
Pr 53 Eastbound over PR 713 & CIMARRONA C199310,850Fair
Pr 53 Westbound over PR 713 & CIMARRONA C199310,850Fair
Pr 53 Westbound over Seco River19949,850Fair

Frequently asked questions

Are any bridges closed in Guayama Municipio, Puerto Rico?

No bridges of the 29 in Guayama Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 5 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Guayama Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Guayama Municipio: no bridges with a component rated 2 (critical) or lower, 4 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Guayama Municipio last inspected?

Inspection dates in the 2025 inventory for Guayama Municipio run from March 2023 to March 2025. Intervals: 4 on 12 months or less, 25 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Guayama Municipio → - all 29, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.