Bridge conditions in Guayanilla Municipio, Puerto Rico
36 inventoried bridges · 0 closed · 13 posted · 8 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 36 bridges.
About one in 4 bridges in Guayanilla Municipio is rated in poor condition: 8 of 36 on the federal inventory, one of the higher shares in Puerto Rico.
- 8 of the 36 bridges in Guayanilla Municipio, Puerto Rico, are rated in poor condition (22.2%) in the 2025 National Bridge Inventory, as of .
- Guayanilla Municipio has no bridges closed to all traffic and 13 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 4 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 1 bridge dropped into poor condition and no bridges improved out of it; 5 bridges had at least one major component rating lowered.
- 3 bridges have a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from May 2023 to March 2025; 17 bridges over water are coded scour critical.
- 2 bridges (5.6%) are rated good and 26 (72.2%) fair.
- The median Guayanilla Municipio bridge was built in 1970.
- The busiest poor-rated bridge is Pr 2 Esbd Km 204.4 over Guayanilla River L Road (built 1970), carrying about 18,450 vehicles a day.
What this page is: the federal bridge inspection inventory for Guayanilla Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 5.6% · Fair 72.2% · Poor 22.2% of 36 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Off Pr 375 Km 2.1 over Grande Creek | load posting removed; fair to poor; culvert 6 to 4 | Fair | Poor | 1,000 |
| Pr 2 over Pr 377 | good to fair; deck 7 to 6 | Good | Fair | 36,900 |
| Off Pr 378 Km 3.8 over Guayanilla River | substructure 4 to 2; superstructure up 2 to 5 | Poor | Poor | 400 |
| Pr 378 5.1 Km over Guayanilla River | substructure 6 to 5 | Fair | Fair | 400 |
| Pr 3336 1.4 Km over Rio Guayanilla | load posting removed; superstructure 9 to 8; substructure 9 to 8 | Good | Good | 500 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 2 Esbd Km 204.4 over Guayanilla River L Road | load posting removed | Poor | Poor | 18,450 |
| Pr 132 over Pr 2 | load posting removed | Fair | Fair | 8,400 |
| Pr 375 over Grande Creek | load posting removed | Fair | Fair | 1,000 |
| Pr 378 7.4 Km over Guayanilla River | load posting removed | Poor | Poor | 400 |
1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 2 over Waterway | posted for load | 1970 | 36,900 | June 2023 | Fair |
| Pr 2 Westbound over Guayanilla River L Road | posted for load | 1970 | 18,450 | June 2023 | Fair |
| Pr 2 Eastbound over Waterway | posted for load | 1968 | 16,650 | December 2024 | Fair |
| Pr 2 Wbd Km 209.1 over Waterway | posted for load | 1968 | 16,650 | April 2024 | Fair |
| Pr 127 10.7 Km over Pr 2 207.7 Km | posted for load | 1968 | 12,500 | July 2024 | Fair |
| Pr 127 over Guayanilla River | posted for load | 1922 | 7,500 | May 2023 | Fair |
| Pr 336 Km 0.70 over La Manuela Creek | posted for load | 1955 | 3,100 | April 2024 | Poor |
| Pr 377 0.1 Km over Consejo Creek | posted for load | 1968 | 500 | October 2024 | Fair |
| Pr 378 3.8 Km over Grande Creek | posted for load | 1959 | 400 | August 2024 | Fair |
| Pr 383 over Magas Creek | posted for load | 1967 | 400 | June 2023 | Fair |
| Off Pr 127 over Consejo Creek | posted for load | 1986 | 300 | August 2023 | Fair |
| Off Pr 378 Km 4.8 over Guayanilla River | posted for load | 1979 | 150 | March 2025 | Poor |
| Off Pr 375 at 0.85 over Grande Creek | posted for load | 1960 | 100 | July 2023 | Fair |
| Pr 132 over Pr 2 | open, posting recommended | 1970 | 8,400 | June 2023 | Fair |
| Off Pr 375 Km 2.1 over Grande Creek | open, posting recommended | 1965 | 1,000 | August 2024 | Poor |
| Pr 375 over Grande Creek | open, posting recommended | 1965 | 1,000 | July 2023 | Fair |
| Pr 3335 2.4 Km over Yauco River | open on a temporary structure | 1950 | 100 | November 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 11 on 12 months or less, 25 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Guayanilla Municipio is dated March 2025; 2 bridges have an inspection dated in 2025.
Scour critical (item 113): 17 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 2 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 2 Esbd Km 204.4 over Guayanilla River L Road | open | 1970 | 18,450 | April 2024 | Poor |
| Pr 2 Westbound over Guayanilla River L Road | posted for load | 1970 | 18,450 | June 2023 | Fair |
| Pr 2 Eastbound over Waterway | posted for load | 1968 | 16,650 | December 2024 | Fair |
| Pr 336 Km 0.70 over La Manuela Creek | posted for load | 1955 | 3,100 | April 2024 | Poor |
| Pr 3336 over Waterway | open | 1984 | 2,200 | June 2023 | Fair |
| Off Pr 375 Km 2.1 over Grande Creek | open, posting recommended | 1965 | 1,000 | August 2024 | Poor |
| Off Pr 377 0.10 Km over Consejo Creek | open | 1984 | 500 | March 2024 | Poor |
| Pr 377 0.1 Km over Consejo Creek | posted for load | 1968 | 500 | October 2024 | Fair |
| Off Pr 378 Km 3.8 over Guayanilla River | open | 1977 | 400 | November 2024 | Poor |
| Pr 378 3.8 Km over Grande Creek | posted for load | 1959 | 400 | August 2024 | Fair |
| Pr 378 5.1 Km over Guayanilla River | open | 1954 | 400 | August 2024 | Fair |
| Pr 378 7.4 Km over Guayanilla River | open | 1958 | 400 | October 2024 | Poor |
| Pr 378 over Guayanilla River | open | 1987 | 400 | July 2023 | Fair |
| Off Pr 378 at 3.30 over Guayanilla River | open | 1987 | 200 | July 2023 | Fair |
| Off Pr 381@ K1.15 over Honda Creek | open | 2003 | 100 | September 2023 | Fair |
| Pr 3335 2.4 Km over Yauco River | open on a temporary structure | 1950 | 100 | November 2024 | Poor |
| Pr 3335 2.4 Km over Yauco River | open | 1950 | 100 | March 2025 | Good |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Off Pr 378 Km 3.8 over Guayanilla River | open | 1977 | 400 | November 2024 | Poor |
| Pr 378 7.4 Km over Guayanilla River | open | 1958 | 400 | October 2024 | Poor |
| Pr 3335 2.4 Km over Yauco River | open on a temporary structure | 1950 | 100 | November 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 2 Esbd Km 204.4 over Guayanilla River L Road | 1970 | 18,450 | Poor |
| Pr 336 Km 0.70 over La Manuela Creek | 1955 | 3,100 | Poor |
| Off Pr 375 Km 2.1 over Grande Creek | 1965 | 1,000 | Poor |
| Off Pr 377 0.10 Km over Consejo Creek | 1984 | 500 | Poor |
| Pr 378 7.4 Km over Guayanilla River | 1958 | 400 | Poor |
| Off Pr 378 Km 3.8 over Guayanilla River | 1977 | 400 | Poor |
| Off Pr 378 Km 4.8 over Guayanilla River | 1979 | 150 | Poor |
| Pr 3335 2.4 Km over Yauco River | 1950 | 100 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 2 over Waterway | 1970 | 36,900 | Fair |
| Pr 2 over Pr 377 | 2003 | 36,900 | Fair |
| Pr 2 Esbd Km 204.4 over Guayanilla River L Road | 1970 | 18,450 | Poor |
| Pr 2 Westbound over Guayanilla River L Road | 1970 | 18,450 | Fair |
| Pr 2 Eastbound over Waterway | 1968 | 16,650 | Fair |
| Pr 2 Wbd Km 209.1 over Waterway | 1968 | 16,650 | Fair |
| Pr 127 10.7 Km over Pr 2 207.7 Km | 1968 | 12,500 | Fair |
| Pr 127 over Tidal Inlet | 1970 | 12,500 | Fair |
| Pr 127 9.7 Km over Pr 2 206.8 Km | 1968 | 12,200 | Fair |
| Pr 132 over Pr 2 | 1970 | 8,400 | Fair |
Frequently asked questions
Are any bridges closed in Guayanilla Municipio, Puerto Rico?
No bridges of the 36 in Guayanilla Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 13 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Guayanilla Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Guayanilla Municipio: 3 bridges with a component rated 2 (critical) or lower, 8 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.
When were bridges in Guayanilla Municipio last inspected?
Inspection dates in the 2025 inventory for Guayanilla Municipio run from May 2023 to March 2025. Intervals: 11 on 12 months or less, 25 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Guayanilla Municipio → - all 36, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.