BridgeReportCard
Home › Puerto Rico › Guayanilla Municipio

Bridge conditions in Guayanilla Municipio, Puerto Rico

36 inventoried bridges · 0 closed · 13 posted · 8 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 36 bridges.

About one in 4 bridges in Guayanilla Municipio is rated in poor condition: 8 of 36 on the federal inventory, one of the higher shares in Puerto Rico.

What this page is: the federal bridge inspection inventory for Guayanilla Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 5.6% · Fair 72.2% · Poor 22.2% of 36 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

1
dropped into poor
since 2024
0
improved out of poor
since 2024
5
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Off Pr 375 Km 2.1 over Grande Creekload posting removed; fair to poor; culvert 6 to 4FairPoor1,000
Pr 2 over Pr 377good to fair; deck 7 to 6GoodFair36,900
Off Pr 378 Km 3.8 over Guayanilla Riversubstructure 4 to 2; superstructure up 2 to 5PoorPoor400
Pr 378 5.1 Km over Guayanilla Riversubstructure 6 to 5FairFair400
Pr 3336 1.4 Km over Rio Guayanillaload posting removed; superstructure 9 to 8; substructure 9 to 8GoodGood500

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 2 Esbd Km 204.4 over Guayanilla River L Roadload posting removedPoorPoor18,450
Pr 132 over Pr 2load posting removedFairFair8,400
Pr 375 over Grande Creekload posting removedFairFair1,000
Pr 378 7.4 Km over Guayanilla Riverload posting removedPoorPoor400

1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 2 over Waterwayposted for load197036,900June 2023Fair
Pr 2 Westbound over Guayanilla River L Roadposted for load197018,450June 2023Fair
Pr 2 Eastbound over Waterwayposted for load196816,650December 2024Fair
Pr 2 Wbd Km 209.1 over Waterwayposted for load196816,650April 2024Fair
Pr 127 10.7 Km over Pr 2 207.7 Kmposted for load196812,500July 2024Fair
Pr 127 over Guayanilla Riverposted for load19227,500May 2023Fair
Pr 336 Km 0.70 over La Manuela Creekposted for load19553,100April 2024Poor
Pr 377 0.1 Km over Consejo Creekposted for load1968500October 2024Fair
Pr 378 3.8 Km over Grande Creekposted for load1959400August 2024Fair
Pr 383 over Magas Creekposted for load1967400June 2023Fair
Off Pr 127 over Consejo Creekposted for load1986300August 2023Fair
Off Pr 378 Km 4.8 over Guayanilla Riverposted for load1979150March 2025Poor
Off Pr 375 at 0.85 over Grande Creekposted for load1960100July 2023Fair
Pr 132 over Pr 2open, posting recommended19708,400June 2023Fair
Off Pr 375 Km 2.1 over Grande Creekopen, posting recommended19651,000August 2024Poor
Pr 375 over Grande Creekopen, posting recommended19651,000July 2023Fair
Pr 3335 2.4 Km over Yauco Riveropen on a temporary structure1950100November 2024Poor

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 11 on 12 months or less, 25 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Guayanilla Municipio is dated March 2025; 2 bridges have an inspection dated in 2025.

Scour critical (item 113): 17 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 2 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 2 Esbd Km 204.4 over Guayanilla River L Roadopen197018,450April 2024Poor
Pr 2 Westbound over Guayanilla River L Roadposted for load197018,450June 2023Fair
Pr 2 Eastbound over Waterwayposted for load196816,650December 2024Fair
Pr 336 Km 0.70 over La Manuela Creekposted for load19553,100April 2024Poor
Pr 3336 over Waterwayopen19842,200June 2023Fair
Off Pr 375 Km 2.1 over Grande Creekopen, posting recommended19651,000August 2024Poor
Off Pr 377 0.10 Km over Consejo Creekopen1984500March 2024Poor
Pr 377 0.1 Km over Consejo Creekposted for load1968500October 2024Fair
Off Pr 378 Km 3.8 over Guayanilla Riveropen1977400November 2024Poor
Pr 378 3.8 Km over Grande Creekposted for load1959400August 2024Fair
Pr 378 5.1 Km over Guayanilla Riveropen1954400August 2024Fair
Pr 378 7.4 Km over Guayanilla Riveropen1958400October 2024Poor
Pr 378 over Guayanilla Riveropen1987400July 2023Fair
Off Pr 378 at 3.30 over Guayanilla Riveropen1987200July 2023Fair
Off Pr 381@ K1.15 over Honda Creekopen2003100September 2023Fair
Pr 3335 2.4 Km over Yauco Riveropen on a temporary structure1950100November 2024Poor
Pr 3335 2.4 Km over Yauco Riveropen1950100March 2025Good

Bridges with a component rated 2 or lower

2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Off Pr 378 Km 3.8 over Guayanilla Riveropen1977400November 2024Poor
Pr 378 7.4 Km over Guayanilla Riveropen1958400October 2024Poor
Pr 3335 2.4 Km over Yauco Riveropen on a temporary structure1950100November 2024Poor

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Pr 2 Esbd Km 204.4 over Guayanilla River L Road197018,450Poor
Pr 336 Km 0.70 over La Manuela Creek19553,100Poor
Off Pr 375 Km 2.1 over Grande Creek19651,000Poor
Off Pr 377 0.10 Km over Consejo Creek1984500Poor
Pr 378 7.4 Km over Guayanilla River1958400Poor
Off Pr 378 Km 3.8 over Guayanilla River1977400Poor
Off Pr 378 Km 4.8 over Guayanilla River1979150Poor
Pr 3335 2.4 Km over Yauco River1950100Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 2 over Waterway197036,900Fair
Pr 2 over Pr 377200336,900Fair
Pr 2 Esbd Km 204.4 over Guayanilla River L Road197018,450Poor
Pr 2 Westbound over Guayanilla River L Road197018,450Fair
Pr 2 Eastbound over Waterway196816,650Fair
Pr 2 Wbd Km 209.1 over Waterway196816,650Fair
Pr 127 10.7 Km over Pr 2 207.7 Km196812,500Fair
Pr 127 over Tidal Inlet197012,500Fair
Pr 127 9.7 Km over Pr 2 206.8 Km196812,200Fair
Pr 132 over Pr 219708,400Fair

Frequently asked questions

Are any bridges closed in Guayanilla Municipio, Puerto Rico?

No bridges of the 36 in Guayanilla Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 13 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Guayanilla Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Guayanilla Municipio: 3 bridges with a component rated 2 (critical) or lower, 8 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.

When were bridges in Guayanilla Municipio last inspected?

Inspection dates in the 2025 inventory for Guayanilla Municipio run from May 2023 to March 2025. Intervals: 11 on 12 months or less, 25 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Guayanilla Municipio → - all 36, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.