Bridge conditions in Guaynabo Municipio, Puerto Rico
63 inventoried bridges · 0 closed · 13 posted · 6 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 63 bridges.
The federal inventory lists 63 bridges in Guaynabo Municipio: 17 rated good, 40 fair, and 6 poor.
- 6 of the 63 bridges in Guaynabo Municipio, Puerto Rico, are rated in poor condition (9.5%) in the 2025 National Bridge Inventory, as of .
- Guaynabo Municipio has no bridges closed to all traffic and 13 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 1 more bridge is open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 1 bridge dropped into poor condition and 1 bridge improved out of it; 6 bridges had at least one major component rating lowered, 2 newly load-posted.
- Inspection dates on record run from January 2023 to March 2025; 9 bridges over water are coded scour critical.
- 17 bridges (27.0%) are rated good and 40 (63.5%) fair.
- The median Guaynabo Municipio bridge was built in 1986.
- The busiest poor-rated bridge is Pr 22 over Pr 28 (built 1971), carrying about 104,500 vehicles a day.
What this page is: the federal bridge inspection inventory for Guaynabo Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 27.0% · Fair 63.5% · Poor 9.5% of 63 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 834 0.02 Km over Guaynabo River | load posting removed; fair to poor; superstructure 5 to 4 | Fair | Poor | 4,900 |
| Pr 173 over Guaynabo River | newly posted for load | Fair | Fair | 7,500 |
| Pr-834 over Waterway | newly posted for load | Fair | Fair | 4,900 |
| Local Road 0.40 Km over Pr 834 22.9 Km | good to fair; deck 7 to 6 | Good | Fair | 4,900 |
| Pr 22 over Pr 165 | superstructure 7 to 5 | Fair | Fair | 180,400 |
| Pr 169 0.50 Km over Camarones Creek | substructure 6 to 5 | Fair | Fair | 16,200 |
| Pr 177 over Pr 20 (mrtnz. Nadal Exp) | substructure 7 to 6 | Fair | Fair | 43,300 |
| Pr 20 PR169 .25 Km over Frailes Creek | deck 8 to 7 | Good | Good | 85,400 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 28 6.0 Km over Pr 2 4.6 Km | poor to fair; deck up 4 to 5 | Poor | Fair | 13,200 |
| Pr 7793 0.05 Km over Don Baro Creek | load posting removed | Poor | Poor | 500 |
| Off Pr 834 over Don Varo Creek | load posting removed | Good | Good | 500 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 20 PR169 .25 Km over Frailes Creek | posted for load | 2012 | 85,400 | July 2024 | Good |
| Pr 20 Southbound over PR 169 & FRAILES CRE | posted for load | 1987 | 76,600 | September 2024 | Fair |
| Pr 2 5.7 Km over Pr 20 (mrtnz. Nadal Exp) | posted for load | 1964 | 74,400 | December 2024 | Fair |
| Pr 165 36.7 Km over Pr 24 0.1 Km | posted for load | 1972 | 51,200 | December 2024 | Poor |
| Pr 177 over Pr 20 (mrtnz. Nadal Exp) | posted for load | 1976 | 43,300 | November 2024 | Fair |
| Pr 1 over GUAYNABO RIVER & PR | posted for load | 1955 | 40,100 | October 2023 | Fair |
| Pr 836 0.1 Km over Guaynabo River | posted for load | 1954 | 10,000 | January 2024 | Fair |
| Pr 836 1.1 Km over Camarones Creek | posted for load | 1961 | 10,000 | October 2024 | Fair |
| Pr 173 over Arenas Creek | posted for load | 1939 | 9,000 | February 2023 | Fair |
| Ramp Pr 23 to Pr 2 over Margarita Creek | posted for load | 1964 | 7,550 | February 2023 | Good |
| Pr 173 over Guaynabo River | posted for load | 1939 | 7,500 | April 2023 | Fair |
| Pr-834 over Waterway | posted for load | 2003 | 4,900 | December 2024 | Fair |
| Alpierre St 0.8 Km over Guaynabo River | posted for load | 1950 | 2,000 | August 2024 | Fair |
| Pr 7793 0.05 Km over Don Baro Creek | open, posting recommended | 1979 | 500 | July 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 8 on 12 months or less, 55 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Guaynabo Municipio is dated March 2025; 2 bridges have an inspection dated in 2025.
Scour critical (item 113): 9 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 169 0.50 Km over Camarones Creek | open | 1921 | 16,200 | March 2024 | Fair |
| Pr 836 0.1 Km over Guaynabo River | posted for load | 1954 | 10,000 | January 2024 | Fair |
| Off Pr 838 0.2 Km over Los Frailes Creek | open | 1999 | 9,500 | July 2024 | Fair |
| Pr 173 over Arenas Creek | posted for load | 1939 | 9,000 | February 2023 | Fair |
| Pr 173 over Guaynabo River | posted for load | 1939 | 7,500 | April 2023 | Fair |
| Pr 833 12.1 Km over Guaynabo River | open | 1985 | 3,100 | July 2024 | Poor |
| San Anto St .10 Km over Guaynabo River | open | 1983 | 2,950 | February 2023 | Fair |
| Alpierre St 0.8 Km over Guaynabo River | posted for load | 1950 | 2,000 | August 2024 | Fair |
| Pr 7793 0.05 Km over Don Baro Creek | open, posting recommended | 1979 | 500 | July 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 22 over Pr 28 | 1971 | 104,500 | Poor |
| Pr 165 36.7 Km over Pr 24 0.1 Km | 1972 | 51,200 | Poor |
| Pr 834 0.02 Km over Guaynabo River | 1945 | 4,900 | Poor |
| Pr 833 12.1 Km over Guaynabo River | 1985 | 3,100 | Poor |
| Pr 7793 0.05 Km over Don Baro Creek | 1979 | 500 | Poor |
| 2ND Street over Stream | 2001 | 100 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 22 over Pr 165 | 1971 | 180,400 | Fair |
| Pr 22 over Pr 28 | 1971 | 104,500 | Poor |
| Pr 22 Westbound over Pr 2 | 1976 | 96,550 | Fair |
| Pr 22 Easb 5.7 Km over Pr 2 5.0 Km | 1976 | 96,550 | Fair |
| Pr 20 1.2 Km over Pr 17 Pi%ero Ave 7.7 Km | 1989 | 85,400 | Fair |
| Pr 20 PR169 .25 Km over Frailes Creek | 2012 | 85,400 | Good |
| Pr 2 4.96 Km over Access Pr 23 to Pr 2 | 1963 | 76,600 | Fair |
| Pr 2 Eastbound over Pr 23 (roosevelt Av.) | 1964 | 76,600 | Fair |
| Pr 2 Westbound over Pr 23 (roosevelt Av.) | 1964 | 76,600 | Fair |
| Pr 2 Km 5.2 over Caparra Interchange | 1964 | 76,600 | Fair |
Frequently asked questions
Are any bridges closed in Guaynabo Municipio, Puerto Rico?
No bridges of the 63 in Guaynabo Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 13 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Guaynabo Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Guaynabo Municipio: no bridges with a component rated 2 (critical) or lower, 6 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.
When were bridges in Guaynabo Municipio last inspected?
Inspection dates in the 2025 inventory for Guaynabo Municipio run from January 2023 to March 2025. Intervals: 8 on 12 months or less, 55 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Guaynabo Municipio → - all 63, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.