BridgeReportCard
Home › Puerto Rico › Guaynabo Municipio

Bridge conditions in Guaynabo Municipio, Puerto Rico

63 inventoried bridges · 0 closed · 13 posted · 6 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 63 bridges.

The federal inventory lists 63 bridges in Guaynabo Municipio: 17 rated good, 40 fair, and 6 poor.

What this page is: the federal bridge inspection inventory for Guaynabo Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 27.0% · Fair 63.5% · Poor 9.5% of 63 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

1
dropped into poor
since 2024
1
improved out of poor
since 2024
6
had a rating lowered
deck, superstructure, substructure or culvert
2
newly closed or posted
0 closed, 2 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Pr 834 0.02 Km over Guaynabo Riverload posting removed; fair to poor; superstructure 5 to 4FairPoor4,900
Pr 173 over Guaynabo Rivernewly posted for loadFairFair7,500
Pr-834 over Waterwaynewly posted for loadFairFair4,900
Local Road 0.40 Km over Pr 834 22.9 Kmgood to fair; deck 7 to 6GoodFair4,900
Pr 22 over Pr 165superstructure 7 to 5FairFair180,400
Pr 169 0.50 Km over Camarones Creeksubstructure 6 to 5FairFair16,200
Pr 177 over Pr 20 (mrtnz. Nadal Exp)substructure 7 to 6FairFair43,300
Pr 20 PR169 .25 Km over Frailes Creekdeck 8 to 7GoodGood85,400

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 28 6.0 Km over Pr 2 4.6 Kmpoor to fair; deck up 4 to 5PoorFair13,200
Pr 7793 0.05 Km over Don Baro Creekload posting removedPoorPoor500
Off Pr 834 over Don Varo Creekload posting removedGoodGood500

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 20 PR169 .25 Km over Frailes Creekposted for load201285,400July 2024Good
Pr 20 Southbound over PR 169 & FRAILES CREposted for load198776,600September 2024Fair
Pr 2 5.7 Km over Pr 20 (mrtnz. Nadal Exp)posted for load196474,400December 2024Fair
Pr 165 36.7 Km over Pr 24 0.1 Kmposted for load197251,200December 2024Poor
Pr 177 over Pr 20 (mrtnz. Nadal Exp)posted for load197643,300November 2024Fair
Pr 1 over GUAYNABO RIVER & PRposted for load195540,100October 2023Fair
Pr 836 0.1 Km over Guaynabo Riverposted for load195410,000January 2024Fair
Pr 836 1.1 Km over Camarones Creekposted for load196110,000October 2024Fair
Pr 173 over Arenas Creekposted for load19399,000February 2023Fair
Ramp Pr 23 to Pr 2 over Margarita Creekposted for load19647,550February 2023Good
Pr 173 over Guaynabo Riverposted for load19397,500April 2023Fair
Pr-834 over Waterwayposted for load20034,900December 2024Fair
Alpierre St 0.8 Km over Guaynabo Riverposted for load19502,000August 2024Fair
Pr 7793 0.05 Km over Don Baro Creekopen, posting recommended1979500July 2024Poor

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 8 on 12 months or less, 55 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Guaynabo Municipio is dated March 2025; 2 bridges have an inspection dated in 2025.

Scour critical (item 113): 9 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 169 0.50 Km over Camarones Creekopen192116,200March 2024Fair
Pr 836 0.1 Km over Guaynabo Riverposted for load195410,000January 2024Fair
Off Pr 838 0.2 Km over Los Frailes Creekopen19999,500July 2024Fair
Pr 173 over Arenas Creekposted for load19399,000February 2023Fair
Pr 173 over Guaynabo Riverposted for load19397,500April 2023Fair
Pr 833 12.1 Km over Guaynabo Riveropen19853,100July 2024Poor
San Anto St .10 Km over Guaynabo Riveropen19832,950February 2023Fair
Alpierre St 0.8 Km over Guaynabo Riverposted for load19502,000August 2024Fair
Pr 7793 0.05 Km over Don Baro Creekopen, posting recommended1979500July 2024Poor

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Pr 22 over Pr 281971104,500Poor
Pr 165 36.7 Km over Pr 24 0.1 Km197251,200Poor
Pr 834 0.02 Km over Guaynabo River19454,900Poor
Pr 833 12.1 Km over Guaynabo River19853,100Poor
Pr 7793 0.05 Km over Don Baro Creek1979500Poor
2ND Street over Stream2001100Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 22 over Pr 1651971180,400Fair
Pr 22 over Pr 281971104,500Poor
Pr 22 Westbound over Pr 2197696,550Fair
Pr 22 Easb 5.7 Km over Pr 2 5.0 Km197696,550Fair
Pr 20 1.2 Km over Pr 17 Pi%ero Ave 7.7 Km198985,400Fair
Pr 20 PR169 .25 Km over Frailes Creek201285,400Good
Pr 2 4.96 Km over Access Pr 23 to Pr 2196376,600Fair
Pr 2 Eastbound over Pr 23 (roosevelt Av.)196476,600Fair
Pr 2 Westbound over Pr 23 (roosevelt Av.)196476,600Fair
Pr 2 Km 5.2 over Caparra Interchange196476,600Fair

Frequently asked questions

Are any bridges closed in Guaynabo Municipio, Puerto Rico?

No bridges of the 63 in Guaynabo Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 13 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Guaynabo Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Guaynabo Municipio: no bridges with a component rated 2 (critical) or lower, 6 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.

When were bridges in Guaynabo Municipio last inspected?

Inspection dates in the 2025 inventory for Guaynabo Municipio run from January 2023 to March 2025. Intervals: 8 on 12 months or less, 55 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Guaynabo Municipio → - all 63, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.