Bridge conditions in Gurabo Municipio, Puerto Rico
20 inventoried bridges · 0 closed · 7 posted · 0 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFair All 20 bridges.
None of the 20 inventoried bridges in Gurabo Municipio are rated in poor condition in the current federal inventory. 5 are rated good and 15 fair.
- 0 of the 20 bridges in Gurabo Municipio, Puerto Rico, are rated in poor condition (0.0%) in the 2025 National Bridge Inventory, as of .
- Gurabo Municipio has no bridges closed to all traffic and 7 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 1 more bridge is open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; no bridges had at least one major component rating lowered.
- Inspection dates on record run from March 2023 to December 2024; 1 bridge over water is coded scour critical.
- 5 bridges (25.0%) are rated good and 15 (75.0%) fair.
- The median Gurabo Municipio bridge was built in 1969.
What this page is: the federal bridge inspection inventory for Gurabo Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 25.0% · Fair 75.0% · Poor 0.0% of 20 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
No bridge in Gurabo Municipio dropped a condition class, lost a point on a component rating, or was newly closed or posted between the two inventories.
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 30 PR181 0.1 Km over Pr 30 7.0 Km | load posting removed | Fair | Fair | 39,100 |
1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 30 Eastbound over Pr 931 | posted for load | 1968 | 114,500 | March 2023 | Fair |
| Pr 30 NB SB 4.1 Km over Pr 189 | posted for load | 2021 | 75,000 | November 2023 | Good |
| Pr 30 Eastbound over Pr 932 | posted for load | 1968 | 68,900 | July 2023 | Fair |
| Pr 30 Westbound over Pr 932 | posted for load | 1968 | 68,900 | July 2023 | Fair |
| Pr 9944 Sbd .01 Km over Pr 30 7.0 Km | posted for load | 1968 | 5,950 | July 2024 | Fair |
| Pr 181 Sbd 25.3 Km over Pr 30 7.4 Km | posted for load | 1969 | 3,950 | July 2024 | Fair |
| Pr 181 Nbd 42.8 Km over Pr 30 7.4 Km | posted for load | 1969 | 2,800 | July 2024 | Fair |
| Pr 30 PR181 0.1 Km over Pr 30 7.0 Km | open, posting recommended | 1968 | 39,100 | July 2024 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 20 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Gurabo Municipio is dated December 2024; 10 bridges have an inspection dated in 2024.
Scour critical (item 113): 1 bridge. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 943 over Gurabo River | open | 1984 | 4,900 | December 2024 | Fair |
Bridges rated poor
No bridges in this county carry a poor rating in the current inventory.
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 30 5.20 Km over Dirt Road | 1968 | 114,500 | Fair |
| Pr 30 Eastbound over Pr 931 | 1968 | 114,500 | Fair |
| Pr 30 5.50 Km over Creek | 1968 | 114,500 | Fair |
| Pr 30 10 Km over Pr 933 0.1 Km | 1968 | 84,200 | Fair |
| Pr 30 8.55 Km over Pr 9030 0.1 Km | 1968 | 84,200 | Fair |
| Pr 30 NB SB 4.1 Km over Pr 189 | 2021 | 75,000 | Good |
| Pr 30 Eastbound over Pr 932 | 1968 | 68,900 | Fair |
| Pr 30 Westbound over Pr 932 | 1968 | 68,900 | Fair |
| Pr 30 6.55 Km over Unnamed Creek | 1969 | 68,900 | Fair |
| Pr 30 over Creek | 1968 | 68,900 | Good |
Frequently asked questions
Are any bridges closed in Gurabo Municipio, Puerto Rico?
No bridges of the 20 in Gurabo Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 7 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Gurabo Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Gurabo Municipio: no bridges with a component rated 2 (critical) or lower, no bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Gurabo Municipio last inspected?
Inspection dates in the 2025 inventory for Gurabo Municipio run from March 2023 to December 2024. Intervals: 20 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Gurabo Municipio → - all 20, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.