Bridge conditions in Hatillo Municipio, Puerto Rico

9 inventoried bridges · 0 closed · 0 posted · 1 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 9 bridges.

Hatillo Municipio has 1 bridges rated poor out of 9 inventoried, a 11.1% share that puts it well above the national rate of about 7%.

What this page is: the federal bridge inspection inventory for Hatillo Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 11.1% · Fair 77.8% · Poor 11.1% of 9 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

1
dropped into poor
since 2024
1
improved out of poor
since 2024
2
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Pr 130 over Depressionfair to poor; culvert 6 to 4FairPoor6,000
Pr 493 over Pr 22poor to fair; superstructure 7 to 6; deck up 4 to 5; substructure up 6 to 7PoorFair10,900

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 4491 over Camuy Riverload posting removedFairFair10,100

Closed and load-posted bridges

None of the 9 bridges in Hatillo Municipio is coded closed or posted in the 2025 inventory.

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 1 on 12 months or less, 8 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Hatillo Municipio is dated December 2024; 3 bridges have an inspection dated in 2024.

Scour critical (item 113): 2 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 493 over Seca Creekopen196810,900May 2023Fair
Pr 4491 over Camuy Riveropen194210,100May 2023Fair

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Pr 130 over Depression19906,000Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 2 over Unnamed Creek199035,900Good
Pr 2 88.9 Km over CAMUY RIVER & LOCAL198734,600Fair
Pr 22 over Pr 2198034,200Fair
Pr 493 over Seca Creek196810,900Fair
Pr 493 over Pr 22198010,900Fair
Pr 4491 over Camuy River194210,100Fair
Pr 130 over Depression19906,000Poor
Pr-488 over Camuy River20081,000Fair
Urban Local Road over Pr 221980500Fair

Frequently asked questions

Are any bridges closed in Hatillo Municipio, Puerto Rico?

None of the 9 bridges in Hatillo Municipio is coded closed or posted in the 2025 National Bridge Inventory. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Hatillo Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Hatillo Municipio: no bridges with a component rated 2 (critical) or lower, 1 bridge rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.

When were bridges in Hatillo Municipio last inspected?

Inspection dates in the 2025 inventory for Hatillo Municipio run from January 2023 to December 2024. Intervals: 1 on 12 months or less, 8 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Hatillo Municipio → - all 9, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.