Bridge conditions in Juana Díaz Municipio, Puerto Rico
57 inventoried bridges · 11 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
Of the 57 Juana Díaz Municipio bridges in the federal inventory, 11 carry a poor rating. That 19.3% share is roughly 3x the national average.
- 11 of the 57 bridges in Juana Díaz Municipio, Puerto Rico, are rated in poor condition (19.3%) in the 2025 National Bridge Inventory, as of .
- 4 bridges (7.0%) are rated good and 42 (73.7%) fair.
- The median Juana Díaz Municipio bridge was built in 1970.
- The busiest poor-rated bridge is Pr 52 Sobd 94.3 Km over Inabon River (built 1970), carrying about 27,300 vehicles a day.
Good 7.0% · Fair 73.7% · Poor 19.3% of 57 bridges
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 52 Sobd 94.3 Km over Inabon River | 1970 | 27,300 | Poor |
| Pr 52 Nort 92.5 Km over Jacaguas River | 1970 | 22,700 | Poor |
| Pr 52 Sbd Km 92.6 over Jacaguas River | 1970 | 22,700 | Poor |
| Pr 52 Nobd 87.8 Km over Irrigation Channel | 1970 | 17,900 | Poor |
| Pr 14 11.1 Km over GUAYO RIVER & LOCAL | 1980 | 16,200 | Poor |
| Pr 149 66.1 Km over La Joya Creek | 1992 | 14,600 | Poor |
| Pr 1 108.4 Km over Descalabrado River | 1921 | 11,200 | Poor |
| Off Pr 149 Km 62.5 over Stream | 1901 | 4,500 | Poor |
| Pr 512 6.3 Km over Guayo River | 1961 | 4,200 | Poor |
| Off Pr 535 3.4 Km over Canas River | 1985 | 1,000 | Poor |
| Off Pr 512 Km 4.3 over Guayo River | 2006 | 100 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 52 Sout 94.6 Km over Farm Road | 1971 | 128,150 | Fair |
| Pr 52 over Unnamed Creek | 1970 | 56,300 | Fair |
| Pr 52 Southbound over Pr 535 | 1970 | 35,800 | Fair |
| Off Pr-149 62.2 Km over Las Brujas Creek | 2008 | 31,600 | Fair |
| Pr 52 Nor 94.6 Km over Farm Road | 1971 | 28,150 | Fair |
| Pr 52 Southbound over Descalabrado River | 1970 | 27,900 | Fair |
| Pr 52 Ntbd 94.3 Km over Inabon River | 1970 | 27,300 | Fair |
| Pr 52 Sobd 94.3 Km over Inabon River | 1970 | 27,300 | Poor |
| Pr 149 over Irrigation Channel | 2009 | 24,900 | Good |
| Pr 52 Nobd 93.3 Km over Pr 574 Km 1.0 | 1971 | 22,700 | Fair |
Source: FHWA National Bridge Inventory, 2025. Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
All of Puerto Rico: Puerto Rico bridge conditions by county · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.