Bridge conditions in Las Marías Municipio, Puerto Rico
13 inventoried bridges · 0 closed · 5 posted · 0 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFair All 13 bridges.
Las Marías Municipio is one of the counties with a clean sheet: 13 bridges on the federal inventory and not one rated poor. 12 carry a fair rating, which means wear worth watching but no structural deficiency.
- 0 of the 13 bridges in Las Marías Municipio, Puerto Rico, are rated in poor condition (0.0%) in the 2025 National Bridge Inventory, as of .
- Las Marías Municipio has no bridges closed to all traffic and 5 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 1 more bridge is open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and 1 bridge improved out of it; 1 bridge had at least one major component rating lowered.
- Inspection dates on record run from May 2023 to November 2024; 3 bridges over water are coded scour critical.
- 1 bridges (7.7%) are rated good and 12 (92.3%) fair.
- The median Las Marías Municipio bridge was built in 1965.
What this page is: the federal bridge inspection inventory for Las Marías Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 7.7% · Fair 92.3% · Poor 0.0% of 13 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 119 48.1 Km over Rio Grande De A¥ASC | good to fair; deck 7 to 6; superstructure 7 to 6 | Good | Fair | 2,400 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 119 50.7 Km over Arenas River | load posting removed; poor to fair; substructure up 4 to 5 | Poor | Fair | 5,700 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 108 over Casei River | posted for load | 1958 | 2,600 | May 2023 | Fair |
| Pr 124 over Guaba River | posted for load | 1949 | 1,600 | October 2023 | Fair |
| Pr 124 over Mayaguecilla River | posted for load | 1937 | 1,400 | June 2023 | Fair |
| Off Pr-402 at 3.09 over Guaba River | posted for load | 1965 | 200 | October 2023 | Fair |
| Off 409 at 3.09 over La Monserrate Creek | posted for load | 1960 | 100 | October 2023 | Fair |
| Pr 119 50.7 Km over Arenas River | open, posting recommended | 1905 | 5,700 | September 2024 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 1 on 12 months or less, 12 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Las Marías Municipio is dated November 2024; 2 bridges have an inspection dated in 2024.
Scour critical (item 113): 3 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 119 50.7 Km over Arenas River | open, posting recommended | 1905 | 5,700 | September 2024 | Fair |
| Pr 119 over Casei River | open | 1902 | 5,200 | October 2023 | Fair |
| Pr 409 over Guaba River | open | 1978 | 500 | October 2023 | Fair |
Bridges rated poor
No bridges in this county carry a poor rating in the current inventory.
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 119 50.7 Km over Arenas River | 1905 | 5,700 | Fair |
| Pr 119 over Casei River | 1902 | 5,200 | Fair |
| Pr 108 over Casei River | 1958 | 2,600 | Fair |
| Pr 119 48.1 Km over Rio Grande De A¥ASC | 1994 | 2,400 | Fair |
| Pr 119 59.1 Km over San Jose Creek | 1975 | 2,200 | Fair |
| Pr 124 over Guaba River | 1949 | 1,600 | Fair |
| Pr 124 over Mayaguecilla River | 1937 | 1,400 | Fair |
| Pr 397 over Ca%as River | 1992 | 1,300 | Fair |
| Pr 409 over Bucarabones River | 1978 | 500 | Fair |
| Pr 409 over Guaba River | 1978 | 500 | Fair |
Frequently asked questions
Are any bridges closed in Las Marías Municipio, Puerto Rico?
No bridges of the 13 in Las Marías Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 5 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Las Marías Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Las Marías Municipio: no bridges with a component rated 2 (critical) or lower, no bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Las Marías Municipio last inspected?
Inspection dates in the 2025 inventory for Las Marías Municipio run from May 2023 to November 2024. Intervals: 1 on 12 months or less, 12 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Las Marías Municipio → - all 13, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.