Bridge conditions in Las Piedras Municipio, Puerto Rico
24 inventoried bridges · 0 closed · 7 posted · 2 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 24 bridges.
The federal inventory lists 24 bridges in Las Piedras Municipio: 1 rated good, 21 fair, and 2 poor.
- 2 of the 24 bridges in Las Piedras Municipio, Puerto Rico, are rated in poor condition (8.3%) in the 2025 National Bridge Inventory, as of .
- Las Piedras Municipio has no bridges closed to all traffic and 7 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 2 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; 3 bridges had at least one major component rating lowered.
- Inspection dates on record run from February 2023 to September 2024; 6 bridges over water are coded scour critical.
- 1 bridges (4.2%) are rated good and 21 (87.5%) fair.
- The median Las Piedras Municipio bridge was built in 1967.
- The busiest poor-rated bridge is Pr 30 Etbd 22.1 Km over Humacao River (built 1964), carrying about 30,350 vehicles a day.
What this page is: the federal bridge inspection inventory for Las Piedras Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 4.2% · Fair 87.5% · Poor 8.3% of 24 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 936 5.7 Km over Boqueron Creek | good to fair; culvert 7 to 5 | Good | Fair | 5,100 |
| Off Pr 948 2.1 Km over Gurabo River | deck 6 to 5 | Fair | Fair | 1,700 |
| Pr 31 16.2 Km over Los Rabanos Creek | substructure 8 to 7; superstructure up 7 to 8 | Fair | Fair | 7,800 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 921 1.1 Km over Humacao River | load posting removed | Fair | Fair | 6,200 |
| Pr 948 5.4 Km over Gurabo River | load posting removed | Fair | Fair | 1,700 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 183 17.6 Km over Valenciano River | posted for load | 1947 | 12,700 | January 2024 | Fair |
| Pr-204 0.7 Km over Ceiba Norte Creek | posted for load | 2011 | 10,800 | January 2024 | Good |
| Pr 921 1.6 Km over Pr 30 22.5 Km | posted for load | 1964 | 9,800 | November 2023 | Fair |
| Pr 31 over Gurabo River | posted for load | 1980 | 7,800 | March 2023 | Fair |
| Pr 9936 0.2 Km over Arenas Creek | posted for load | 1960 | 3,400 | May 2024 | Fair |
| Pr 9921 over Humacao River | posted for load | 1969 | 1,400 | February 2023 | Fair |
| Off Pr 9921 over Humacao River | posted for load | 1996 | 50 | August 2023 | Fair |
| Pr 921 1.1 Km over Humacao River | open, posting recommended | 1953 | 6,200 | January 2024 | Fair |
| Pr 948 5.4 Km over Gurabo River | open, posting recommended | 1966 | 1,700 | September 2024 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 3 on 12 months or less, 21 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Las Piedras Municipio is dated September 2024; 13 bridges have an inspection dated in 2024.
Scour critical (item 113): 6 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 30 Etbd 22.1 Km over Humacao River | open | 1964 | 30,350 | May 2024 | Poor |
| Pr 30 Webd 22.1 Km over Humacao River | open | 1965 | 30,350 | July 2024 | Poor |
| Pr 183 17.6 Km over Valenciano River | posted for load | 1947 | 12,700 | January 2024 | Fair |
| Pr 31 over Gurabo River | posted for load | 1980 | 7,800 | March 2023 | Fair |
| Pr 936 over Arenas Creek | open | 1933 | 4,200 | March 2023 | Fair |
| Pr 9921 over Humacao River | posted for load | 1969 | 1,400 | February 2023 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 30 Etbd 22.1 Km over Humacao River | 1964 | 30,350 | Poor |
| Pr 30 Webd 22.1 Km over Humacao River | 1965 | 30,350 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 30 Webd 21.9 Km over Pr 183 18.5 Km | 1965 | 37,500 | Fair |
| Pr 30 Eabd 21.9 Km over Pr 183 21.2 Km | 1965 | 37,500 | Fair |
| Pr 30 Etbd 22.1 Km over Humacao River | 1964 | 30,350 | Poor |
| Pr 30 Webd 22.1 Km over Humacao River | 1965 | 30,350 | Poor |
| Pr 183 17.6 Km over Valenciano River | 1947 | 12,700 | Fair |
| Pr 204 0.99 Km over Pr 30 19.8 Km | 1998 | 10,800 | Fair |
| Pr-204 0.7 Km over Ceiba Norte Creek | 2011 | 10,800 | Good |
| Pr 921 1.6 Km over Pr 30 22.5 Km | 1964 | 9,800 | Fair |
| Pr 31 over Gurabo River | 1980 | 7,800 | Fair |
| Pr 31 16.2 Km over Los Rabanos Creek | 2004 | 7,800 | Fair |
Frequently asked questions
Are any bridges closed in Las Piedras Municipio, Puerto Rico?
No bridges of the 24 in Las Piedras Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 7 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Las Piedras Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Las Piedras Municipio: no bridges with a component rated 2 (critical) or lower, 2 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Las Piedras Municipio last inspected?
Inspection dates in the 2025 inventory for Las Piedras Municipio run from February 2023 to September 2024. Intervals: 3 on 12 months or less, 21 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Las Piedras Municipio → - all 24, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.