Bridge conditions in Luquillo Municipio, Puerto Rico
20 inventoried bridges · 1 closed · 5 posted · 4 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
FairPoor All 20 bridges.
About one in 5 bridges in Luquillo Municipio is rated in poor condition: 4 of 20 on the federal inventory, one of the higher shares in Puerto Rico.
- 4 of the 20 bridges in Luquillo Municipio, Puerto Rico, are rated in poor condition (20.0%) in the 2025 National Bridge Inventory, as of .
- Luquillo Municipio has 1 bridge closed to all traffic and 5 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, 1 bridge dropped into poor condition and no bridges improved out of it; 2 bridges had at least one major component rating lowered, 1 was newly closed.
- Inspection dates on record run from March 2023 to November 2024; 8 bridges over water are coded scour critical.
- 0 bridges (0.0%) are rated good and 16 (80.0%) fair.
- The median Luquillo Municipio bridge was built in 1966.
- The busiest poor-rated bridge is Pr 983 1.8 Km over Pitahaya River (built 1945), carrying about 4,400 vehicles a day.
What this page is: the federal bridge inspection inventory for Luquillo Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 0.0% · Fair 80.0% · Poor 20.0% of 20 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 988 Km 2.7 over Mameyes River | newly closed | Poor | Poor | 2,800 |
| Pr 983 1.8 Km over Pitahaya River | fair to poor; superstructure 5 to 4 | Fair | Poor | 4,400 |
| Pr 3 38.1 Km over Pr 992 0.1 Km | substructure 6 to 5 | Fair | Fair | 28,800 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 3 31.9 Km over Mameyes Creek | load posting removed | Fair | Fair | 36,100 |
| Pr 940 over Pitahaya River | load posting removed | Fair | Fair | 4,000 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 988 Km 2.7 over Mameyes River | closed | 1966 | 2,800 | April 2024 | Poor |
| Pr 3 38.1 Km over Pr 992 0.1 Km | posted for load | 1957 | 28,800 | November 2024 | Fair |
| Pr 3 42.35 Km over Juan Martin River | posted for load | 1988 | 28,700 | August 2024 | Fair |
| Pr 983 1.8 Km over Pitahaya River | posted for load | 1945 | 4,400 | April 2024 | Poor |
| Pr 940 2.2 Km over La Burra Creek | posted for load | 1916 | 4,000 | January 2024 | Fair |
| Pr 988 over Chiquito River | posted for load | 1940 | 200 | April 2024 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 9 on 12 months or less, 11 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Luquillo Municipio is dated November 2024; 17 bridges have an inspection dated in 2024.
Scour critical (item 113): 8 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 3 32.3 Km over Mameyes River | open | 1982 | 34,700 | November 2024 | Fair |
| Pr 983 1.15 Km over Pitahaya River | open | 1950 | 4,400 | August 2024 | Fair |
| Pr 983 1.8 Km over Pitahaya River | posted for load | 1945 | 4,400 | April 2024 | Poor |
| Pr 940 2.0 Km over Juan Martin River | open | 1916 | 4,000 | April 2024 | Fair |
| Pr 940 over Pitahaya River | open | 1916 | 4,000 | March 2023 | Fair |
| Pr 988 12.2 Km over Pitahaya Creek | open | 1939 | 200 | March 2024 | Poor |
| Pr 988 over Chiquito River | posted for load | 1940 | 200 | April 2024 | Fair |
| Pr 988 over Sabana River | open | 1958 | 200 | March 2023 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 983 1.8 Km over Pitahaya River | 1945 | 4,400 | Poor |
| Pr 193 Km 1.3 over Mata De Platano Creek | 1981 | 3,200 | Poor |
| Pr 988 Km 2.7 over Mameyes River | 1966 | 2,800 | Poor |
| Pr 988 12.2 Km over Pitahaya Creek | 1939 | 200 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 3 31.9 Km over Mameyes Creek | 1978 | 36,100 | Fair |
| Pr 3 32.3 Km over Mameyes River | 1982 | 34,700 | Fair |
| Pr 3 37.1 Km over Mata De Platano Creek | 1984 | 33,800 | Fair |
| Pr 3 38.1 Km over Pr 992 0.1 Km | 1957 | 28,800 | Fair |
| Pr 3 38.5 Km over Sabana River | 1985 | 28,800 | Fair |
| Pr 3 over Pitahaya River | 1985 | 28,800 | Fair |
| Pr 3 40.7 Km over Pr 940 | 1985 | 28,800 | Fair |
| Pr 3 42.35 Km over Juan Martin River | 1988 | 28,700 | Fair |
| Pr 3 36.0 Km over Access to Luquillo Beach | 1980 | 26,400 | Fair |
| Pr 991 0.09 Km over Sabana River | 1950 | 4,900 | Fair |
Frequently asked questions
Are any bridges closed in Luquillo Municipio, Puerto Rico?
1 bridge of the 20 in Luquillo Municipio is coded closed to all traffic in the 2025 National Bridge Inventory, and 5 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Luquillo Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Luquillo Municipio: no bridges with a component rated 2 (critical) or lower, 4 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.
When were bridges in Luquillo Municipio last inspected?
Inspection dates in the 2025 inventory for Luquillo Municipio run from March 2023 to November 2024. Intervals: 9 on 12 months or less, 11 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Luquillo Municipio → - all 20, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.