Bridge conditions in Morovis Municipio, Puerto Rico
18 inventoried bridges · 0 closed · 3 posted · 5 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 18 bridges.
Morovis Municipio has 5 bridges rated poor out of 18 inventoried, a 27.8% share that puts it well above the national rate of about 7%.
- 5 of the 18 bridges in Morovis Municipio, Puerto Rico, are rated in poor condition (27.8%) in the 2025 National Bridge Inventory, as of .
- Morovis Municipio has no bridges closed to all traffic and 3 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 4 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and 1 bridge improved out of it; 3 bridges had at least one major component rating lowered.
- 2 bridges have a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from February 2023 to March 2025; 8 bridges over water are coded scour critical.
- 2 bridges (11.1%) are rated good and 11 (61.1%) fair.
- The median Morovis Municipio bridge was built in 1952.
- The busiest poor-rated bridge is Pr 155 49.8 Km over Morovis River (built 1914), carrying about 7,200 vehicles a day.
What this page is: the federal bridge inspection inventory for Morovis Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 11.1% · Fair 61.1% · Poor 27.8% of 18 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 155 49.8 Km over Morovis River | reopened; deck 5 to 4; superstructure up 1 to 4 | Poor | Poor | 7,200 |
| Pr 155 46.3 Km over Morovis River | load posting removed; superstructure 6 to 5 | Fair | Fair | 6,000 |
| Pr 617 0.1 Km over Morovis River | deck 8 to 7; superstructure 8 to 7; substructure 8 to 7 | Good | Good | 4,600 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Int Pr 6623 Km 0.4 over Creek | load posting removed; poor to fair; substructure up 4 to 5 | Poor | Fair | 1,000 |
3 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 567 over Grande Creek | posted for load | 1934 | 1,400 | May 2023 | Fair |
| Pr 634 over Grande De Morovis Creek | posted for load | 1952 | 1,400 | May 2023 | Fair |
| Pr 6617 over Monte Llano Creek | posted for load | 1960 | 1,000 | March 2023 | Fair |
| Pr 155 49.8 Km over Morovis River | open on a temporary structure | 1914 | 7,200 | March 2025 | Poor |
| Off Pr 567 2.2 Km over Unknown Creek | open on temporary shoring | 2010 | 1,600 | March 2025 | Poor |
| Pr 567 over Grande De Manati River | open on a temporary structure | 1978 | 1,400 | May 2023 | Poor |
| Int Pr 6623 Km 0.4 over Creek | open, posting recommended | 1940 | 1,000 | February 2024 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 5 on 12 months or less, 13 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Morovis Municipio is dated March 2025; 3 bridges have an inspection dated in 2025.
Scour critical (item 113): 8 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 4 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 159 5.2 Km over Unibon River | open | 1921 | 8,900 | August 2024 | Fair |
| Pr 155 49.8 Km over Morovis River | open on a temporary structure | 1914 | 7,200 | March 2025 | Poor |
| Pr 567 over Grande De Manati River | open | 1978 | 2,600 | May 2023 | Fair |
| Pr 567 over Grande Creek | posted for load | 1934 | 1,400 | May 2023 | Fair |
| Pr 567 over Grande De Manati River | open on a temporary structure | 1978 | 1,400 | May 2023 | Poor |
| Pr 634 over Grande De Morovis Creek | posted for load | 1952 | 1,400 | May 2023 | Fair |
| Pr 155 55.3 Km over Franquez Creek | open | 1950 | 1,200 | September 2024 | Fair |
| Int Pr 6623 Km 0.4 over Creek | open, posting recommended | 1940 | 1,000 | February 2024 | Fair |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Off Pr 567 2.2 Km over Unknown Creek | open on temporary shoring | 2010 | 1,600 | March 2025 | Poor |
| Pr 567 over Grande De Manati River | open on a temporary structure | 1978 | 1,400 | May 2023 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 155 49.8 Km over Morovis River | 1914 | 7,200 | Poor |
| Pr 155 49.8 Km over Morovis River | 1914 | 7,200 | Poor |
| Off Pr 567 2.2 Km over Unknown Creek | 2010 | 1,600 | Poor |
| Pr 567 over Grande De Manati River | 1978 | 1,400 | Poor |
| Pr 5567 1.6 Km over Bauta River | 1997 | 300 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 137 over Grande Creek | 1996 | 18,100 | Fair |
| Pr 159 5.2 Km over Unibon River | 1921 | 8,900 | Fair |
| Pr 155 49.8 Km over Morovis River | 1914 | 7,200 | Poor |
| Pr 155 49.8 Km over Morovis River | 1914 | 7,200 | Poor |
| Pr 155 46.3 Km over Morovis River | 1940 | 6,000 | Fair |
| Pr 155 over Creek | 1949 | 6,000 | Fair |
| Pr 155 over Depression | 1949 | 5,900 | Fair |
| Pr-155 over Grande De Manati River | 2007 | 5,900 | Good |
| Pr 617 0.1 Km over Morovis River | 2005 | 4,600 | Good |
| Pr 567 over Grande De Manati River | 1978 | 2,600 | Fair |
Frequently asked questions
Are any bridges closed in Morovis Municipio, Puerto Rico?
No bridges of the 18 in Morovis Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 3 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Morovis Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Morovis Municipio: 2 bridges with a component rated 2 (critical) or lower, 5 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Morovis Municipio last inspected?
Inspection dates in the 2025 inventory for Morovis Municipio run from February 2023 to March 2025. Intervals: 5 on 12 months or less, 13 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Morovis Municipio → - all 18, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.