Bridge conditions in Orocovis Municipio, Puerto Rico
19 inventoried bridges · 1 closed · 7 posted · 4 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 19 bridges.
Of the 19 Orocovis Municipio bridges in the federal inventory, 4 carry a poor rating. That 21.1% share is roughly 3x the national average.
- 4 of the 19 bridges in Orocovis Municipio, Puerto Rico, are rated in poor condition (21.1%) in the 2025 National Bridge Inventory, as of .
- Orocovis Municipio has 1 bridge closed to all traffic and 7 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; 2 bridges had at least one major component rating lowered.
- 1 bridge has a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from May 2023 to March 2025; 9 bridges over water are coded scour critical.
- 4 bridges (21.1%) are rated good and 11 (57.9%) fair.
- The median Orocovis Municipio bridge was built in 1964.
- The busiest poor-rated bridge is Pr 568 2.7 Km over Botijas River (built 1924), carrying about 1,900 vehicles a day.
What this page is: the federal bridge inspection inventory for Orocovis Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 21.1% · Fair 57.9% · Poor 21.1% of 19 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 143 36.3 Km over Matrullas River | good to fair; culvert 7 to 5 | Good | Fair | 700 |
| Pr 5555 over Orocovis River | deck 8 to 7; substructure 8 to 7 | Good | Good | 1,200 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 155 over Orocovis River | load posting removed | Fair | Fair | 2,600 |
| Pr 155 over Bauta River | load posting removed | Fair | Fair | 1,600 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Km 0.04 over Rio Toro Negro | closed | 1901 | 100 | August 2024 | Poor |
| Pr 157 22.7 Km over Sana Muertos River | posted for load | 1936 | 2,200 | October 2024 | Fair |
| Pr 157 14.7 Km over Bauta River | posted for load | 1955 | 2,000 | November 2024 | Fair |
| Pr 568 2.7 Km over Botijas River | posted for load | 1924 | 1,900 | February 2024 | Poor |
| Pr 155 over El Chorro Creek | posted for load | 1940 | 1,600 | May 2023 | Fair |
| Pr 597 over Orocovis River | posted for load | 1965 | 1,000 | May 2023 | Fair |
| Pr 599 over Orocovis River | posted for load | 1971 | 300 | May 2023 | Fair |
| Pr 157 7.3 Km over Matrullas River | posted for load | 1959 | 200 | December 2023 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 7 on 12 months or less, 12 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Orocovis Municipio is dated March 2025; 2 bridges have an inspection dated in 2025.
Scour critical (item 113): 9 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 1 bridge. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 155 over Orocovis River | open | 1927 | 2,600 | July 2023 | Fair |
| Pr 157 14.7 Km over Bauta River | posted for load | 1955 | 2,000 | November 2024 | Fair |
| Pr 568 2.7 Km over Botijas River | posted for load | 1924 | 1,900 | February 2024 | Poor |
| Pr 155 over Bauta River | open | 1940 | 1,600 | May 2023 | Fair |
| Pr 155 over El Chorro Creek | posted for load | 1940 | 1,600 | May 2023 | Fair |
| Pr 597 over Orocovis River | posted for load | 1965 | 1,000 | May 2023 | Fair |
| Pr 157 7.3 Km over Matrullas River | posted for load | 1959 | 200 | December 2023 | Fair |
| Km 0.04 over Rio Toro Negro | closed | 1901 | 100 | August 2024 | Poor |
| Off Pr 157 at 3.80 over De Cacaos Creek | open | 1964 | 100 | March 2025 | Poor |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Km 0.04 over Rio Toro Negro | closed | 1901 | 100 | August 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 568 2.7 Km over Botijas River | 1924 | 1,900 | Poor |
| Off Pr 157 2.35 Km over Riachuelos River | 1990 | 200 | Poor |
| Off Pr 157 at 3.80 over De Cacaos Creek | 1964 | 100 | Poor |
| Km 0.04 over Rio Toro Negro | 1901 | 100 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Off Pr 155 31.6 Km over Hoya Honda Creek | 1996 | 10,200 | Fair |
| Pr 598 over Saltos Creek Umpierre St | 1989 | 9,000 | Good |
| Pr 569 over Waterway | 2001 | 3,600 | Good |
| Pr 5155 0.1 Km over Orocovis River | 2001 | 3,100 | Good |
| City Street over Orocovis River | 1979 | 3,000 | Fair |
| Pr 155 over Orocovis River | 1927 | 2,600 | Fair |
| Pr 157 22.7 Km over Sana Muertos River | 1936 | 2,200 | Fair |
| Pr 157 14.7 Km over Bauta River | 1955 | 2,000 | Fair |
| Pr 568 2.7 Km over Botijas River | 1924 | 1,900 | Poor |
| Pr 155 over Bauta River | 1940 | 1,600 | Fair |
Frequently asked questions
Are any bridges closed in Orocovis Municipio, Puerto Rico?
1 bridge of the 19 in Orocovis Municipio is coded closed to all traffic in the 2025 National Bridge Inventory, and 7 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Orocovis Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Orocovis Municipio: 1 bridge with a component rated 2 (critical) or lower, 4 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Orocovis Municipio last inspected?
Inspection dates in the 2025 inventory for Orocovis Municipio run from May 2023 to March 2025. Intervals: 7 on 12 months or less, 12 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Orocovis Municipio → - all 19, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.