124 inventoried bridges · 5 closed · 27 posted · 18 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 124 bridges.

Of the 124 Ponce Municipio bridges in the federal inventory, 18 carry a poor rating. That 14.5% share is roughly 2x the national average.

What this page is: the federal bridge inspection inventory for Ponce Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 18.5% · Fair 66.9% · Poor 14.5% of 124 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

0
dropped into poor
since 2024
1
improved out of poor
since 2024
12
had a rating lowered
deck, superstructure, substructure or culvert
1
newly closed or posted
0 closed, 1 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Ramp PR10 to PR14 over Bucana Rivernewly posted for loadGoodGood8,900
Pr 2 222.0 Km over Runoff Drainage of Pr 2good to fair; culvert 8 to 6GoodFair27,200
Pr 2 216.8 Km over Unnamed Creekgood to fair; culvert 7 to 6GoodFair42,200
Pr 2 223.2 Km over Connector to Pr-591good to fair; deck 7 to 6GoodFair27,200
Pr 52 106.7 Km over Unknown Creekgood to fair; culvert 7 to 6GoodFair18,800
Pr 588 1.0 Km over Chiquito Riverload posting removed; deck 6 to 5; superstructure 5 to 4PoorPoor200
Pr 2 221.6 Km over CONNECTOR PR 591 & Hsubstructure 8 to 5FairFair49,800
Pr 2 216.1 Km over Ramps to Pr 2substructure 7 to 5FairFair42,200
Pr 123 16.8 Km over Waterwayload posting removed; superstructure 6 to 5FairFair3,500
Pr 511 11.3 Km over Inabon Riverdeck 6 to 5FairFair1,900
Pr 10 Km 6.8 over Portuguez Riversubstructure 7 to 6FairFair23,200
Pr 12 2.1 Km over Highway Caribe Ave.deck 8 to 7GoodGood27,400
Ramp Pr 9 E Pr 123 over _deck 8 to 7FairFair15,500

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 14 Malecon Ave. over Pr 163fair to good; substructure up 6 to 7FairGood38,700
Pr 2 224.8 Km over Del Agua Creekload posting removedFairFair22,950
Pr 132 over CA¥AS Riverload posting removedFairFair20,700
Pr 1 120.3 Km over Inabon Riverload posting removedFairFair14,000
Pr 163 Eabd Km 1.1 over Portugues Riverload posting removedPoorPoor10,200
Off Pr 511 KM12.65 over Inabon Riverload posting removedPoorPoor1,900
Pr 139 over Depressionload posting removedFairFair1,000
Off Pr 511 KM12.75 over Inabon Riverpoor to fair; deck up 4 to 5PoorFair900
Off 511 R 29.4 Km over Inabon Riverload posting removedPoorPoor900
Pr 501 0.3 Km over CA¥AS Riverfair to good; culvert up 5 to 7FairGood500

3 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 9 0.1 Km E over Pr-123 9.75 Km Rio Canasclosed201515,500October 2023Fair
Pr 9 Westbo 0.1 Km over Pr 123 Rio CAÑASclosed201815,500October 2023Fair
Ramp Pr 9 E Pr 123 over _closed190115,500October 2023Fair
Ramp Pr 9 W Pr 123 over Dirt Roadclosed201815,500October 2023Good
Serralles Street over Pr 10closed1997100November 2024Good
Off Pr 14 5.5 Km over Inabon Riverposted for load197863,700January 2024Fair
Pr 12 4.5 Km over Pr 1 and Pr 133 126.8 Kmposted for load199633,900June 2024Fair
Pr 2 227.8 Km over Portugues Riverposted for load195127,400April 2024Fair
Pr 2 Wesb 224.7 Km over Del Agua Creekposted for load196522,950January 2024Fair
Pr 163 0.5 Km over Pr 163 Canas Riverposted for load199217,900June 2024Poor
Pr 14 over Ditchposted for load200617,500March 2023Fair
Pr 2 Eabd 225.5 Km over Matilde Riverposted for load196113,400January 2024Fair
Pr 2 Webd 225.5 Km over Matilde Riverposted for load196113,400January 2024Fair
Pr 506 1.2 Km over Unnamed Creekposted for load197511,200February 2024Good
Pr 52 Eastbound over Pr 123posted for load19969,400October 2023Fair
Pr 52 Westbound over Pr 10posted for load19969,400October 2023Fair
Pr 585 Km 2.4 over Portugues Riverposted for load19489,200March 2024Fair
Ramp PR10 to PR14 over Bucana Riverposted for load19978,900June 2023Good
Pr 123 Km 2.95 over Portugues Riverposted for load19338,800November 2024Poor
Pr 132 21.3 Km over Pastillo Riverposted for load19158,500August 2024Poor
Off Pr 132 0.2 Km over Pastillo Riverposted for load19608,400September 2024Fair
Pr 501 over Ca%as Riverposted for load19476,500December 2024Fair
Off Pr 123 over Caâ¥as Riverposted for load19654,000November 2024Fair
Off Pr 139 2.2 Km over Ausubo Creekposted for load19762,800April 2024Fair
Pr 139 1.7 Km over Waterwayposted for load20102,800January 2024Good
Off Pr 511 KM12.75 over Inabon Riverposted for load19801,900August 2024Poor
Pr 511 11.3 Km over Inabon Riverposted for load20001,900September 2023Fair
Pr 502 1.45 Km over Pastillo Riverposted for load19481,700October 2023Fair
Off Pr 504 Km 0.6 over Chiquito Riverposted for load19601,000February 2024Fair
Pr 139 23.4 Km over Depressionposted for load19401,000July 2024Fair
Off Pr 511 KM12.75 over Inabon Riverposted for load1980900August 2024Fair
Pr 503 1.9 Km over Portugues Riverposted for load1925700April 2024Fair
Pr 2 224.8 Km over Del Agua Creekopen, posting recommended196522,950April 2024Fair
Pr 1 120.3 Km over Inabon Riveropen, posting recommended191914,000September 2023Fair
Pr 123 16.8 Km over Waterwayopen, posting recommended19003,500April 2024Fair
Pr 123 0.4 Km over Tidal Waters Channelopen on a temporary structure19131,300April 2024Poor
Pr 139 over Depressionopen, posting recommended19401,000November 2023Fair

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 22 on 12 months or less, 102 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Ponce Municipio is dated December 2024; 78 bridges have an inspection dated in 2024.

Scour critical (item 113): 13 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 3 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Off Pr 2 225.9 Km over Unknown Creekopen199726,800November 2024Fair
Pr 163 Eabd Km 1.1 over Portugues Riveropen196910,200February 2024Poor
Pr 163 Wbd Km 0.9 over Portugues Riveropen196910,200February 2024Poor
Pr 585 Km 2.4 over Portugues Riverposted for load19489,200March 2024Fair
Pr 132 21.3 Km over Pastillo Riverposted for load19158,500August 2024Poor
Pr 501 over Ca%as Riverposted for load19476,500December 2024Fair
Pr 505 over Yuca Riveropen19562,000February 2023Fair
Off Pr 511 KM12.75 over Inabon Riverposted for load19801,900August 2024Poor
Pr 502 1.45 Km over Pastillo Riverposted for load19481,700October 2023Fair
Pr 139 11.7 Km over Maraguez Riveropen19921,000January 2024Fair
Off 511 R 29.4 Km over Inabon Riveropen2021900May 2024Poor
Off Pr 511 KM12.75 over Inabon Riverposted for load1980900August 2024Fair
Pr 588 1.0 Km over Chiquito Riveropen1981200August 2024Poor

Bridges with a component rated 2 or lower

2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 123 0.4 Km over Tidal Waters Channelopen on a temporary structure19131,300April 2024Poor

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Pr 52 over Dirt Road199550,800Poor
Pr 52 102.3 Km over Dirt Road199550,800Poor
Pr 52 Nobd 98.9 Km over Dirt Road197132,200Poor
Pr 52 Nobd 95.5 Km over Pr 506 Km 1.5197028,150Poor
Pr 52 Northbound over Pr 1199025,400Poor
Pr 52 106.1 Km over Portugues River199618,800Poor
Pr 52 104.9 Km over Pr 12199518,800Poor
Pr 163 0.5 Km over Pr 163 Canas River199217,900Poor
Pr 163 Wbd Km 0.9 over Portugues River196910,200Poor
Pr 163 Eabd Km 1.1 over Portugues River196910,200Poor
Pr 123 Km 2.95 over Portugues River19338,800Poor
Pr 132 21.3 Km over Pastillo River19158,500Poor
Off Pr 511 KM12.65 over Inabon River19951,900Poor
Off Pr 511 KM12.75 over Inabon River19801,900Poor
Pr 123 0.4 Km over Tidal Waters Channel19131,300Poor
Off Pr 588 at 0.30 over Chiquito River20091,000Poor
Off 511 R 29.4 Km over Inabon River2021900Poor
Pr 588 1.0 Km over Chiquito River1981200Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Off Pr 14 5.5 Km over Inabon River197863,700Fair
Pr 52 over Bucana River199551,907Fair
Pr 52 over Dirt Road199550,800Poor
Pr 52 102.3 Km over Dirt Road199550,800Poor
Pr 52 Southbound over Local Road199550,800Fair
Pr 2 221.6 Km over CONNECTOR PR 591 & H201049,800Fair
Pr 2 216.8 Km over Unnamed Creek200842,200Fair
Pr 2 216.1 Km over Ramps to Pr 2200842,200Fair
Pr 14 Malecon Ave. over Portugues River198839,800Fair
Pr 14 Malecon Ave. over Pr 163198838,700Good

Frequently asked questions

Are any bridges closed in Ponce Municipio, Puerto Rico?

5 bridges of the 124 in Ponce Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 27 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Ponce Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Ponce Municipio: 1 bridge with a component rated 2 (critical) or lower, 18 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Ponce Municipio last inspected?

Inspection dates in the 2025 inventory for Ponce Municipio run from February 2023 to December 2024. Intervals: 22 on 12 months or less, 102 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Ponce Municipio → - all 124, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.