Bridge conditions in Ponce Municipio, Puerto Rico
124 inventoried bridges · 5 closed · 27 posted · 18 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 124 bridges.
Of the 124 Ponce Municipio bridges in the federal inventory, 18 carry a poor rating. That 14.5% share is roughly 2x the national average.
- 18 of the 124 bridges in Ponce Municipio, Puerto Rico, are rated in poor condition (14.5%) in the 2025 National Bridge Inventory, as of .
- Ponce Municipio has 5 bridges closed to all traffic and 27 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 5 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and 1 bridge improved out of it; 12 bridges had at least one major component rating lowered, 1 newly load-posted.
- 1 bridge has a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from February 2023 to December 2024; 13 bridges over water are coded scour critical.
- 23 bridges (18.5%) are rated good and 83 (66.9%) fair.
- The median Ponce Municipio bridge was built in 1993.
- The busiest poor-rated bridge is Pr 52 over Dirt Road (built 1995), carrying about 50,800 vehicles a day.
What this page is: the federal bridge inspection inventory for Ponce Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 18.5% · Fair 66.9% · Poor 14.5% of 124 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Ramp PR10 to PR14 over Bucana River | newly posted for load | Good | Good | 8,900 |
| Pr 2 222.0 Km over Runoff Drainage of Pr 2 | good to fair; culvert 8 to 6 | Good | Fair | 27,200 |
| Pr 2 216.8 Km over Unnamed Creek | good to fair; culvert 7 to 6 | Good | Fair | 42,200 |
| Pr 2 223.2 Km over Connector to Pr-591 | good to fair; deck 7 to 6 | Good | Fair | 27,200 |
| Pr 52 106.7 Km over Unknown Creek | good to fair; culvert 7 to 6 | Good | Fair | 18,800 |
| Pr 588 1.0 Km over Chiquito River | load posting removed; deck 6 to 5; superstructure 5 to 4 | Poor | Poor | 200 |
| Pr 2 221.6 Km over CONNECTOR PR 591 & H | substructure 8 to 5 | Fair | Fair | 49,800 |
| Pr 2 216.1 Km over Ramps to Pr 2 | substructure 7 to 5 | Fair | Fair | 42,200 |
| Pr 123 16.8 Km over Waterway | load posting removed; superstructure 6 to 5 | Fair | Fair | 3,500 |
| Pr 511 11.3 Km over Inabon River | deck 6 to 5 | Fair | Fair | 1,900 |
| Pr 10 Km 6.8 over Portuguez River | substructure 7 to 6 | Fair | Fair | 23,200 |
| Pr 12 2.1 Km over Highway Caribe Ave. | deck 8 to 7 | Good | Good | 27,400 |
| Ramp Pr 9 E Pr 123 over _ | deck 8 to 7 | Fair | Fair | 15,500 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 14 Malecon Ave. over Pr 163 | fair to good; substructure up 6 to 7 | Fair | Good | 38,700 |
| Pr 2 224.8 Km over Del Agua Creek | load posting removed | Fair | Fair | 22,950 |
| Pr 132 over CA¥AS River | load posting removed | Fair | Fair | 20,700 |
| Pr 1 120.3 Km over Inabon River | load posting removed | Fair | Fair | 14,000 |
| Pr 163 Eabd Km 1.1 over Portugues River | load posting removed | Poor | Poor | 10,200 |
| Off Pr 511 KM12.65 over Inabon River | load posting removed | Poor | Poor | 1,900 |
| Pr 139 over Depression | load posting removed | Fair | Fair | 1,000 |
| Off Pr 511 KM12.75 over Inabon River | poor to fair; deck up 4 to 5 | Poor | Fair | 900 |
| Off 511 R 29.4 Km over Inabon River | load posting removed | Poor | Poor | 900 |
| Pr 501 0.3 Km over CA¥AS River | fair to good; culvert up 5 to 7 | Fair | Good | 500 |
3 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 9 0.1 Km E over Pr-123 9.75 Km Rio Canas | closed | 2015 | 15,500 | October 2023 | Fair |
| Pr 9 Westbo 0.1 Km over Pr 123 Rio CAÑAS | closed | 2018 | 15,500 | October 2023 | Fair |
| Ramp Pr 9 E Pr 123 over _ | closed | 1901 | 15,500 | October 2023 | Fair |
| Ramp Pr 9 W Pr 123 over Dirt Road | closed | 2018 | 15,500 | October 2023 | Good |
| Serralles Street over Pr 10 | closed | 1997 | 100 | November 2024 | Good |
| Off Pr 14 5.5 Km over Inabon River | posted for load | 1978 | 63,700 | January 2024 | Fair |
| Pr 12 4.5 Km over Pr 1 and Pr 133 126.8 Km | posted for load | 1996 | 33,900 | June 2024 | Fair |
| Pr 2 227.8 Km over Portugues River | posted for load | 1951 | 27,400 | April 2024 | Fair |
| Pr 2 Wesb 224.7 Km over Del Agua Creek | posted for load | 1965 | 22,950 | January 2024 | Fair |
| Pr 163 0.5 Km over Pr 163 Canas River | posted for load | 1992 | 17,900 | June 2024 | Poor |
| Pr 14 over Ditch | posted for load | 2006 | 17,500 | March 2023 | Fair |
| Pr 2 Eabd 225.5 Km over Matilde River | posted for load | 1961 | 13,400 | January 2024 | Fair |
| Pr 2 Webd 225.5 Km over Matilde River | posted for load | 1961 | 13,400 | January 2024 | Fair |
| Pr 506 1.2 Km over Unnamed Creek | posted for load | 1975 | 11,200 | February 2024 | Good |
| Pr 52 Eastbound over Pr 123 | posted for load | 1996 | 9,400 | October 2023 | Fair |
| Pr 52 Westbound over Pr 10 | posted for load | 1996 | 9,400 | October 2023 | Fair |
| Pr 585 Km 2.4 over Portugues River | posted for load | 1948 | 9,200 | March 2024 | Fair |
| Ramp PR10 to PR14 over Bucana River | posted for load | 1997 | 8,900 | June 2023 | Good |
| Pr 123 Km 2.95 over Portugues River | posted for load | 1933 | 8,800 | November 2024 | Poor |
| Pr 132 21.3 Km over Pastillo River | posted for load | 1915 | 8,500 | August 2024 | Poor |
| Off Pr 132 0.2 Km over Pastillo River | posted for load | 1960 | 8,400 | September 2024 | Fair |
| Pr 501 over Ca%as River | posted for load | 1947 | 6,500 | December 2024 | Fair |
| Off Pr 123 over Caâ¥as River | posted for load | 1965 | 4,000 | November 2024 | Fair |
| Off Pr 139 2.2 Km over Ausubo Creek | posted for load | 1976 | 2,800 | April 2024 | Fair |
| Pr 139 1.7 Km over Waterway | posted for load | 2010 | 2,800 | January 2024 | Good |
| Off Pr 511 KM12.75 over Inabon River | posted for load | 1980 | 1,900 | August 2024 | Poor |
| Pr 511 11.3 Km over Inabon River | posted for load | 2000 | 1,900 | September 2023 | Fair |
| Pr 502 1.45 Km over Pastillo River | posted for load | 1948 | 1,700 | October 2023 | Fair |
| Off Pr 504 Km 0.6 over Chiquito River | posted for load | 1960 | 1,000 | February 2024 | Fair |
| Pr 139 23.4 Km over Depression | posted for load | 1940 | 1,000 | July 2024 | Fair |
| Off Pr 511 KM12.75 over Inabon River | posted for load | 1980 | 900 | August 2024 | Fair |
| Pr 503 1.9 Km over Portugues River | posted for load | 1925 | 700 | April 2024 | Fair |
| Pr 2 224.8 Km over Del Agua Creek | open, posting recommended | 1965 | 22,950 | April 2024 | Fair |
| Pr 1 120.3 Km over Inabon River | open, posting recommended | 1919 | 14,000 | September 2023 | Fair |
| Pr 123 16.8 Km over Waterway | open, posting recommended | 1900 | 3,500 | April 2024 | Fair |
| Pr 123 0.4 Km over Tidal Waters Channel | open on a temporary structure | 1913 | 1,300 | April 2024 | Poor |
| Pr 139 over Depression | open, posting recommended | 1940 | 1,000 | November 2023 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 22 on 12 months or less, 102 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Ponce Municipio is dated December 2024; 78 bridges have an inspection dated in 2024.
Scour critical (item 113): 13 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 3 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Off Pr 2 225.9 Km over Unknown Creek | open | 1997 | 26,800 | November 2024 | Fair |
| Pr 163 Eabd Km 1.1 over Portugues River | open | 1969 | 10,200 | February 2024 | Poor |
| Pr 163 Wbd Km 0.9 over Portugues River | open | 1969 | 10,200 | February 2024 | Poor |
| Pr 585 Km 2.4 over Portugues River | posted for load | 1948 | 9,200 | March 2024 | Fair |
| Pr 132 21.3 Km over Pastillo River | posted for load | 1915 | 8,500 | August 2024 | Poor |
| Pr 501 over Ca%as River | posted for load | 1947 | 6,500 | December 2024 | Fair |
| Pr 505 over Yuca River | open | 1956 | 2,000 | February 2023 | Fair |
| Off Pr 511 KM12.75 over Inabon River | posted for load | 1980 | 1,900 | August 2024 | Poor |
| Pr 502 1.45 Km over Pastillo River | posted for load | 1948 | 1,700 | October 2023 | Fair |
| Pr 139 11.7 Km over Maraguez River | open | 1992 | 1,000 | January 2024 | Fair |
| Off 511 R 29.4 Km over Inabon River | open | 2021 | 900 | May 2024 | Poor |
| Off Pr 511 KM12.75 over Inabon River | posted for load | 1980 | 900 | August 2024 | Fair |
| Pr 588 1.0 Km over Chiquito River | open | 1981 | 200 | August 2024 | Poor |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 123 0.4 Km over Tidal Waters Channel | open on a temporary structure | 1913 | 1,300 | April 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 52 over Dirt Road | 1995 | 50,800 | Poor |
| Pr 52 102.3 Km over Dirt Road | 1995 | 50,800 | Poor |
| Pr 52 Nobd 98.9 Km over Dirt Road | 1971 | 32,200 | Poor |
| Pr 52 Nobd 95.5 Km over Pr 506 Km 1.5 | 1970 | 28,150 | Poor |
| Pr 52 Northbound over Pr 1 | 1990 | 25,400 | Poor |
| Pr 52 106.1 Km over Portugues River | 1996 | 18,800 | Poor |
| Pr 52 104.9 Km over Pr 12 | 1995 | 18,800 | Poor |
| Pr 163 0.5 Km over Pr 163 Canas River | 1992 | 17,900 | Poor |
| Pr 163 Wbd Km 0.9 over Portugues River | 1969 | 10,200 | Poor |
| Pr 163 Eabd Km 1.1 over Portugues River | 1969 | 10,200 | Poor |
| Pr 123 Km 2.95 over Portugues River | 1933 | 8,800 | Poor |
| Pr 132 21.3 Km over Pastillo River | 1915 | 8,500 | Poor |
| Off Pr 511 KM12.65 over Inabon River | 1995 | 1,900 | Poor |
| Off Pr 511 KM12.75 over Inabon River | 1980 | 1,900 | Poor |
| Pr 123 0.4 Km over Tidal Waters Channel | 1913 | 1,300 | Poor |
| Off Pr 588 at 0.30 over Chiquito River | 2009 | 1,000 | Poor |
| Off 511 R 29.4 Km over Inabon River | 2021 | 900 | Poor |
| Pr 588 1.0 Km over Chiquito River | 1981 | 200 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Off Pr 14 5.5 Km over Inabon River | 1978 | 63,700 | Fair |
| Pr 52 over Bucana River | 1995 | 51,907 | Fair |
| Pr 52 over Dirt Road | 1995 | 50,800 | Poor |
| Pr 52 102.3 Km over Dirt Road | 1995 | 50,800 | Poor |
| Pr 52 Southbound over Local Road | 1995 | 50,800 | Fair |
| Pr 2 221.6 Km over CONNECTOR PR 591 & H | 2010 | 49,800 | Fair |
| Pr 2 216.8 Km over Unnamed Creek | 2008 | 42,200 | Fair |
| Pr 2 216.1 Km over Ramps to Pr 2 | 2008 | 42,200 | Fair |
| Pr 14 Malecon Ave. over Portugues River | 1988 | 39,800 | Fair |
| Pr 14 Malecon Ave. over Pr 163 | 1988 | 38,700 | Good |
Frequently asked questions
Are any bridges closed in Ponce Municipio, Puerto Rico?
5 bridges of the 124 in Ponce Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 27 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Ponce Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Ponce Municipio: 1 bridge with a component rated 2 (critical) or lower, 18 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Ponce Municipio last inspected?
Inspection dates in the 2025 inventory for Ponce Municipio run from February 2023 to December 2024. Intervals: 22 on 12 months or less, 102 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Ponce Municipio → - all 124, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.