BridgeReportCard
Home › Puerto Rico › Quebradillas Municipio

Bridge conditions in Quebradillas Municipio, Puerto Rico

3 inventoried bridges · 0 closed · 0 posted · 1 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

FairPoor All 3 bridges.

Of the 3 Quebradillas Municipio bridges in the federal inventory, 1 carry a poor rating. That 33.3% share is roughly 5x the national average.

What this page is: the federal bridge inspection inventory for Quebradillas Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 0.0% · Fair 66.7% · Poor 33.3% of 3 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

0
dropped into poor
since 2024
0
improved out of poor
since 2024
0
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

No bridge in Quebradillas Municipio dropped a condition class, lost a point on a component rating, or was newly closed or posted between the two inventories.

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 476 0.6 Km over Guajataca Riverload posting removedPoorPoor500

Closed and load-posted bridges

None of the 3 bridges in Quebradillas Municipio is coded closed or posted in the 2025 inventory.

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 1 on 12 months or less, 2 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Quebradillas Municipio is dated May 2024; 2 bridges have an inspection dated in 2024.

Scour critical (item 113): no bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Pr 476 0.6 Km over Guajataca River1971500Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 2 104.1 Km over Guajataca River Local Rd198031,100Fair
Pr 485 3.7 Km over Bellaca Creek19763,100Fair
Pr 476 0.6 Km over Guajataca River1971500Poor

Frequently asked questions

Are any bridges closed in Quebradillas Municipio, Puerto Rico?

None of the 3 bridges in Quebradillas Municipio is coded closed or posted in the 2025 National Bridge Inventory. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Quebradillas Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Quebradillas Municipio: no bridges with a component rated 2 (critical) or lower, 1 bridge rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Quebradillas Municipio last inspected?

Inspection dates in the 2025 inventory for Quebradillas Municipio run from December 2023 to May 2024. Intervals: 1 on 12 months or less, 2 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Quebradillas Municipio → - all 3, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.