Bridge conditions in Rincón Municipio, Puerto Rico

8 inventoried bridges · 0 closed · 2 posted · 1 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 8 bridges.

Of the 8 Rincón Municipio bridges in the federal inventory, 1 carry a poor rating. That 12.5% share is roughly 2x the national average.

What this page is: the federal bridge inspection inventory for Rincón Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 50.0% · Fair 37.5% · Poor 12.5% of 8 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

0
dropped into poor
since 2024
1
improved out of poor
since 2024
0
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

No bridge in Rincón Municipio dropped a condition class, lost a point on a component rating, or was newly closed or posted between the two inventories.

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 115 over Quebrada Grandeload posting removedGoodGood25,000
Pr 115 over Quebrada Grandeload posting removedGoodGood25,000
Pr 429 0.9 Km over Grande Creekpoor to fair; substructure up 4 to 7PoorFair1,000

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Prmavera St 0.2 Km over Grande Creekposted for load19678,800July 2024Poor
Pr 411 over Grande De Calvache Creekposted for load1941800May 2023Fair

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 3 on 12 months or less, 5 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Rincón Municipio is dated July 2024; 5 bridges have an inspection dated in 2024.

Scour critical (item 113): no bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Prmavera St 0.2 Km over Grande Creek19678,800Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 115 12.4 Km over Channel199225,000Fair
Off Pr 115 12.3 Km over Unknown Channel199225,000Good
Off Pr 115 Km 11.6 over Channel199225,000Good
Pr 115 over Quebrada Grande199925,000Good
Pr 115 over Quebrada Grande199925,000Good
Prmavera St 0.2 Km over Grande Creek19678,800Poor
Pr 429 0.9 Km over Grande Creek20031,000Fair
Pr 411 over Grande De Calvache Creek1941800Fair

Frequently asked questions

Are any bridges closed in Rincón Municipio, Puerto Rico?

No bridges of the 8 in Rincón Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 2 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Rincón Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Rincón Municipio: no bridges with a component rated 2 (critical) or lower, 1 bridge rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Rincón Municipio last inspected?

Inspection dates in the 2025 inventory for Rincón Municipio run from May 2023 to July 2024. Intervals: 3 on 12 months or less, 5 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Rincón Municipio → - all 8, busiest first, each with its own condition record.