Bridge conditions in Sabana Grande Municipio, Puerto Rico
27 inventoried bridges · 1 closed · 3 posted · 0 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFair All 27 bridges.
Sabana Grande Municipio is one of the counties with a clean sheet: 27 bridges on the federal inventory and not one rated poor. 22 carry a fair rating, which means wear worth watching but no structural deficiency.
- 0 of the 27 bridges in Sabana Grande Municipio, Puerto Rico, are rated in poor condition (0.0%) in the 2025 National Bridge Inventory, as of .
- Sabana Grande Municipio has 1 bridge closed to all traffic and 3 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 2 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; 1 bridge had at least one major component rating lowered.
- Inspection dates on record run from February 2023 to November 2024; 4 bridges over water are coded scour critical.
- 5 bridges (18.5%) are rated good and 22 (81.5%) fair.
- The median Sabana Grande Municipio bridge was built in 1974.
What this page is: the federal bridge inspection inventory for Sabana Grande Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 18.5% · Fair 81.5% · Poor 0.0% of 27 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 363 1.6 Km over Cruces River | load posting removed; deck 7 to 6 | Fair | Fair | 3,400 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 368 3.45 Km over Machuchal Creek | load posting removed | Fair | Fair | 2,500 |
| Ramp PR2 to PR117 over Irrigation Channel | fair to good; deck up 6 to 7 | Fair | Good | 1,400 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Local Rd St 0.2 Km over Pr 2 182 Km | closed | 1972 | – | May 2024 | Fair |
| Pr 2 181 Km over Cruces River | posted for load | 1974 | 24,600 | May 2024 | Fair |
| Pr 328 5.7 Km over Irrigation Channel | posted for load | 1960 | 1,000 | August 2024 | Fair |
| Pr 364 over Grande River | posted for load | 1962 | 800 | March 2023 | Fair |
| Pr 363 1.6 Km over Cruces River | open, posting recommended | 1952 | 3,400 | August 2024 | Fair |
| Pr 368 3.45 Km over Machuchal Creek | open, posting recommended | 1969 | 2,500 | August 2024 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 4 on 12 months or less, 23 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Sabana Grande Municipio is dated November 2024; 15 bridges have an inspection dated in 2024.
Scour critical (item 113): 4 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 2 183.5 Km over Pr 328 0.03 Km | open | 1974 | 27,500 | October 2024 | Fair |
| Pr 121 1.2 Km over Guanajibo River | open | 1978 | 8,000 | November 2024 | Fair |
| Pr 121 5.9 Km over Magina Creek | open | 1969 | 5,500 | November 2024 | Fair |
| Pr 363 1.6 Km over Cruces River | open, posting recommended | 1952 | 3,400 | August 2024 | Fair |
Bridges rated poor
No bridges in this county carry a poor rating in the current inventory.
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 2 over Pr 102 | 1972 | 42,800 | Fair |
| Pr 2 over Local Road | 1974 | 27,500 | Fair |
| Pr 2 183.5 Km over Pr 328 0.03 Km | 1974 | 27,500 | Fair |
| Pr 2 181 Km over Cruces River | 1974 | 24,600 | Fair |
| Pr 2 over Flores River | 1972 | 24,600 | Fair |
| Pr 2 over PR 117 & WATERWAY | 1974 | 24,400 | Fair |
| Pr 2 over Cattle Pass | 1979 | 24,400 | Fair |
| Pr 2 187.2 Km over Creek | 1979 | 24,400 | Good |
| Connector to PR121 over Pr 2 | 1972 | 21,100 | Fair |
| Local Road over Rayo Minillas River | 1983 | 17,500 | Fair |
Frequently asked questions
Are any bridges closed in Sabana Grande Municipio, Puerto Rico?
1 bridge of the 27 in Sabana Grande Municipio is coded closed to all traffic in the 2025 National Bridge Inventory, and 3 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Sabana Grande Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Sabana Grande Municipio: no bridges with a component rated 2 (critical) or lower, no bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Sabana Grande Municipio last inspected?
Inspection dates in the 2025 inventory for Sabana Grande Municipio run from February 2023 to November 2024. Intervals: 4 on 12 months or less, 23 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Sabana Grande Municipio → - all 27, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.