Bridge conditions in Salinas Municipio, Puerto Rico
40 inventoried bridges · 0 closed · 2 posted · 9 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
FairPoor All 40 bridges.
Salinas Municipio has 9 bridges rated poor out of 40 inventoried, a 22.5% share that puts it well above the national rate of about 7%.
- 9 of the 40 bridges in Salinas Municipio, Puerto Rico, are rated in poor condition (22.5%) in the 2025 National Bridge Inventory, as of .
- Salinas Municipio has no bridges closed to all traffic and 2 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, 1 bridge dropped into poor condition and no bridges improved out of it; 6 bridges had at least one major component rating lowered.
- Inspection dates on record run from July 2023 to March 2025; 6 bridges over water are coded scour critical.
- 0 bridges (0.0%) are rated good and 31 (77.5%) fair.
- The median Salinas Municipio bridge was built in 1972.
- The busiest poor-rated bridge is Pr 52 Southbound over PR 714 & LA PALMA CR (built 1974), carrying about 20,600 vehicles a day.
What this page is: the federal bridge inspection inventory for Salinas Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 0.0% · Fair 77.5% · Poor 22.5% of 40 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 52 Southbound over PR 714 & LA PALMA CR | fair to poor; deck 7 to 4; superstructure up 6 to 7 | Fair | Poor | 20,600 |
| Pr 1 Km 91.5 over Río Nigua | good to fair; deck 7 to 6; superstructure 8 to 7; substructure 8 to 7 | Good | Fair | 20,300 |
| Pr 1 78.85 Km over Lapa River | deck 4 to 3; superstructure 5 to 4 | Poor | Poor | 3,900 |
| Pr 52 57.4 Km over MAJADAS RIVER & PR 7 | superstructure 6 to 5 | Poor | Poor | 17,450 |
| Pr 712 over Jajome Creek | superstructure 6 to 5 | Fair | Fair | 800 |
| Pr 53 94.1 Km over Pr 52 61.0 Km | superstructure 7 to 6; substructure 7 to 6 | Fair | Fair | 18,100 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 52 Northbound over Nigua River | load posting removed | Fair | Fair | 37,800 |
| Pr 1 over Arenales Channel | load posting removed | Fair | Fair | 20,300 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 712 over Jajome Creek | posted for load | 1965 | 800 | October 2023 | Fair |
| Pr 1 75.5 Km over Depression | posted for load | 1926 | 500 | December 2023 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 8 on 12 months or less, 32 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Salinas Municipio is dated March 2025; 1 bridges have an inspection dated in 2025.
Scour critical (item 113): 6 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 2 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 52 Northbound over Nigua River | open | 1971 | 37,800 | August 2024 | Fair |
| Pr 52 Sout 66.6 Km over Nigua River | open | 1971 | 18,900 | September 2023 | Fair |
| Pr 52 Sobd 57.4 Km over MAJADAS RIVER & PR 7 | open | 1972 | 17,450 | March 2024 | Poor |
| Pr 1 78.85 Km over Lapa River | open | 1926 | 3,900 | September 2024 | Poor |
| Pr 712 over Majada River | open | 1984 | 3,442 | August 2023 | Fair |
| Pr 712 over Jajome Creek | posted for load | 1965 | 800 | October 2023 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 52 Southbound over PR 714 & LA PALMA CR | 1974 | 20,600 | Poor |
| Pr 52 Northbound over Honda Creek | 1971 | 18,900 | Poor |
| Pr 52 Sobd 57.4 Km over MAJADAS RIVER & PR 7 | 1972 | 17,450 | Poor |
| Pr 52 57.4 Km over MAJADAS RIVER & PR 7 | 1972 | 17,450 | Poor |
| Pr 52 Sou 66.2 Km over Pr 1 89.1 Km | 1972 | 17,300 | Poor |
| Off Pr 3 Km 153.20 over Unnamed Creek | 1988 | 14,500 | Poor |
| Pr 53 Eastbound over Pr 706 | 1992 | 9,250 | Poor |
| Pr 53 Westbound over Pr 706 | 1992 | 9,250 | Poor |
| Pr 1 78.85 Km over Lapa River | 1926 | 3,900 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 52 Northbound over Local Access Road | 1971 | 37,800 | Fair |
| Pr 52 Northbound over Nigua River | 1971 | 37,800 | Fair |
| Pr 52 Northbound over Pr 1 | 1972 | 37,800 | Fair |
| Pr 52 Northbound over Bridge 1241 | 1972 | 34,900 | Fair |
| Pr 52 Soub 60.3 Km over Local Road | 1972 | 34,900 | Fair |
| Pr 52 Southbound over PR 714 & LA PALMA CR | 1974 | 20,600 | Poor |
| Pr 1 over Arenales Channel | 1940 | 20,300 | Fair |
| Pr 1 Km 91.5 over Río Nigua | 2015 | 20,300 | Fair |
| Pr 52 Northbound over Honda Creek | 1971 | 18,900 | Poor |
| Pr 52 Sout 66.6 Km over Nigua River | 1971 | 18,900 | Fair |
Frequently asked questions
Are any bridges closed in Salinas Municipio, Puerto Rico?
No bridges of the 40 in Salinas Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 2 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Salinas Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Salinas Municipio: no bridges with a component rated 2 (critical) or lower, 9 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.
When were bridges in Salinas Municipio last inspected?
Inspection dates in the 2025 inventory for Salinas Municipio run from July 2023 to March 2025. Intervals: 8 on 12 months or less, 32 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Salinas Municipio → - all 40, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.