Bridge conditions in San Juan Municipio, Puerto Rico
201 inventoried bridges · 1 closed · 43 posted · 21 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 201 bridges.
San Juan Municipio has 21 bridges rated poor out of 201 inventoried, a 10.4% share that puts it well above the national rate of about 7%.
- 21 of the 201 bridges in San Juan Municipio, Puerto Rico, are rated in poor condition (10.4%) in the 2025 National Bridge Inventory, as of .
- San Juan Municipio has 1 bridge closed to all traffic and 43 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 4 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 2 bridges dropped into poor condition and no bridges improved out of it; 20 bridges had at least one major component rating lowered.
- Inspection dates on record run from January 2023 to March 2025; 10 bridges over water are coded scour critical.
- 42 bridges (20.9%) are rated good and 138 (68.7%) fair.
- The median San Juan Municipio bridge was built in 1977.
- The busiest poor-rated bridge is Pr 18 3.35 Km over Ave. Amer Miranda 1.4 Km (built 1967), carrying about 261,400 vehicles a day.
What this page is: the federal bridge inspection inventory for San Juan Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 20.9% · Fair 68.7% · Poor 10.4% of 201 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 18 3.35 Km over Ave. Amer Miranda 1.4 Km | fair to poor; superstructure 5 to 4 | Fair | Poor | 261,400 |
| Pr 1 over Pr 18 (las Americas Exp) | fair to poor; deck 5 to 4 | Fair | Poor | 45,500 |
| Ramp PR18 0.02 Km over Pr 18 NB Pr 22 WB Km 2 | load posting removed; good to fair; deck 7 to 6; superstructure 8 to 7; substructure 8 to 7 | Good | Fair | 239,000 |
| Ramp 20 to Pr 177 over Local Road Urban Train | good to fair; substructure 7 to 6 | Good | Fair | 52,800 |
| Pr 2 over Marginal Pr 2 | good to fair; deck 7 to 6 | Good | Fair | 51,500 |
| U.p.r. Local Rd over Pr 17 6.2 Km | good to fair; deck 7 to 6 | Good | Fair | 100 |
| Pr 2 Pr 22 4.3 Km over Ramp Pr 28 Pr 2 4.7 Km | deck 6 to 5; superstructure 8 to 6; substructure 8 to 7 | Fair | Fair | 196,100 |
| Ramp PR18 to PR22 over Pr 18 | deck 6 to 5 | Fair | Fair | 183,900 |
| Pr 1 over Martin PE¥A Channel | load posting removed; substructure 6 to 5 | Fair | Fair | 35,900 |
| Pr 25 8.0 Km over Martin PE¥A Channel | substructure 6 to 5 | Poor | Poor | 28,800 |
| Ramp Pr 22 to Pr 1 over Ramp Pr 1 to L A Street | substructure 6 to 5 | Fair | Fair | 5,500 |
| Pr 176 10.4 Km over Chorros Creek | deck 6 to 5 | Poor | Poor | 4,000 |
| Pr 22 0.7 Km over Pr 35 2.4 Km | substructure 7 to 6 | Fair | Fair | 201,100 |
| Pr 18 1.00 Km over Pr 23 2.50 Km | superstructure 7 to 6 | Poor | Poor | 183,900 |
| Pr 22 Nrbd 1.7 Km over Martin PE¥A Channel | substructure 7 to 6 | Fair | Fair | 117,050 |
| Pr 52 Sobd 4.1 Km over Montehiedra Avenue | superstructure 7 to 6; substructure 7 to 6 | Fair | Fair | 60,150 |
| Pr 22 Sthbd 1.9 Km over Martin PE¥A Channel | superstructure 7 to 6 | Fair | Fair | 58,525 |
| Pr 52 Nobd 8.7 Km over Local Road | superstructure 7 to 6 | Fair | Fair | 52,700 |
| PR17 PR8 8.6 Km over Access to Mall of Sj | deck 8 to 7 | Good | Good | 40,000 |
| Pr 181 67.5 Km over Pr 3 3.5 Km | deck 8 to 7; superstructure 8 to 7 | Good | Good | 16,200 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 18 over Los Muertos Creek | load posting removed | Good | Good | 187,900 |
| Ramp Pr 22 - Pr 18 over Los Muertos Creek | load posting removed | Fair | Fair | 84,000 |
| Pr-52 over Access Road | load posting removed | Good | Good | 52,700 |
| Pr 176 over Piedras River | load posting removed | Poor | Poor | 27,100 |
| De Diego Av .10 Km over Guaralcanal Creek | load posting removed | Fair | Fair | 24,800 |
| Ave Centro Medico over Pr-21 1.5 Km | load posting removed | Good | Good | 15,900 |
| Ramp Char to Sju over Calle Kalaf | load posting removed | Good | Good | 12,300 |
| Pr 873 0.7 Km over Frailes Creek | load posting removed | Poor | Poor | 9,900 |
| Pr-25 over San Antonio Channel | fair to good; substructure up 5 to 7 | Fair | Good | 6,600 |
| 21 St 0.1 Km over DOÑA Ana Creek | load posting removed | Fair | Fair | 3,000 |
no structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Cipreses Street over Sabana Llana Creek | closed | 1975 | 350 | February 2023 | Fair |
| Pr 18 3.35 Km over Ave. Amer Miranda 1.4 Km | posted for load | 1967 | 261,400 | December 2024 | Poor |
| Pr 18 2.1 Km over Piedras River | posted for load | 1967 | 261,000 | December 2023 | Fair |
| Pr 18 1.00 Km over Pr 23 2.50 Km | posted for load | 1967 | 183,900 | March 2024 | Poor |
| Pr 18 over Kalaf Street | posted for load | 1972 | 183,900 | March 2023 | Fair |
| Pr 18 2.6 Km over Pr 17 4.0 Km | posted for load | 1967 | 183,800 | January 2024 | Poor |
| Pr 18 over Domenech Street | posted for load | 1967 | 183,800 | August 2023 | Fair |
| Pr 18 over Ramp From Pr 21 | posted for load | 1965 | 80,700 | June 2023 | Fair |
| Pr 22 Sthbd 1.9 Km over Martin PE¥A Channel | posted for load | 1980 | 58,525 | March 2024 | Fair |
| Pr 3 over Pr 1 | posted for load | 1958 | 48,600 | November 2024 | Fair |
| Pr 3 over Street # 1 | posted for load | 1958 | 48,600 | November 2024 | Fair |
| Pr 1 3.4 Km over Pr 35 0.1 Km | posted for load | 1958 | 45,400 | July 2024 | Fair |
| Pr 1 5.0 Km over Pr 39 0.01 Km | posted for load | 1954 | 45,400 | August 2024 | Fair |
| Pr 17 (PI¥ERO over Josefina Creek | posted for load | 1950 | 42,500 | December 2024 | Fair |
| Pr 1 6.0 Km over Concepcion Street | posted for load | 1971 | 33,900 | July 2023 | Fair |
| Pr 25 2.7 Km over Pr 1 3.0 Km | posted for load | 1958 | 28,800 | July 2024 | Fair |
| Ramon B. Lopez St over Juan Mendez Creek | posted for load | 1942 | 25,400 | August 2024 | Fair |
| Pr 1 15.4 Km over San Roberto Street | posted for load | 1967 | 22,750 | February 2024 | Poor |
| Pr 1 15.7 Km over San Roberto Street | posted for load | 1967 | 22,750 | December 2024 | Poor |
| Amrco Mrnda 1.6 Km over DOÑA Ana Creek | posted for load | 1950 | 20,300 | July 2024 | Fair |
| De Diego Avenue over Do%a Ana Creek | posted for load | 1955 | 20,199 | November 2024 | Fair |
| Pr 1 7.4 Km over Sagrado Corazon Street | posted for load | 1971 | 17,950 | October 2024 | Fair |
| Sicilia Street over Juan Mendez Creek | posted for load | 1977 | 15,200 | December 2024 | Fair |
| Pr 23 Km 2.3 over Piedras River | posted for load | 1951 | 14,850 | August 2024 | Fair |
| Pr 23 Westbound over Piedras River | posted for load | 1950 | 14,850 | August 2024 | Fair |
| Silicia St 0.7 Km over Juan Mendez Creek Km 0.7 | posted for load | 1950 | 13,800 | August 2024 | Fair |
| Pr 41 over De Los Muertos Creek | posted for load | 1929 | 11,500 | January 2023 | Fair |
| PR18 PR17 10.1 Km over Piedras River | posted for load | 1967 | 11,200 | October 2024 | Poor |
| 29 St S.E 0.1 Km over DO¥A Ana Creek | posted for load | 1955 | 8,500 | July 2024 | Fair |
| Ramp PR25 to PR17 over Ramp From Pr 17 to Pr 1 | posted for load | 1996 | 5,700 | November 2024 | Fair |
| Ramp Pr 22 to Pr 1 over Ramp Pr 1 to L A Street | posted for load | 1979 | 5,500 | August 2024 | Fair |
| Robles St 0.3 Km over Urban City Street | posted for load | 1978 | 5,000 | September 2024 | Fair |
| Pr 842 over Arenas Creek | posted for load | 1961 | 4,100 | December 2024 | Fair |
| Pr 176 10 Km over Depression | posted for load | 1940 | 4,000 | August 2024 | Fair |
| Pr 176 10.4 Km over Chorros Creek | posted for load | 1940 | 4,000 | August 2024 | Poor |
| Pr 176 10.5 Km over Negrita Creek | posted for load | 1940 | 4,000 | August 2024 | Fair |
| Pr 176 11.05 Km over Carraizo Creek | posted for load | 1940 | 4,000 | August 2024 | Fair |
| Galileo Street over Buena Vista Creek | posted for load | 1950 | 3,762 | January 2023 | Fair |
| Belmonte Street over Juan Mendez Creek | posted for load | 1951 | 3,200 | August 2024 | Fair |
| Lbtd Street 0.3 Km over Juan Mendez Creek | posted for load | 1940 | 3,000 | February 2024 | Fair |
| Vergel Street over Juan Mendez Creek | posted for load | 1977 | 2,000 | December 2024 | Fair |
| Jln Bengch 0.1 Km over Santo Domingo Creek | posted for load | 1950 | 1,300 | February 2024 | Fair |
| 13 Street over DO¥A Ana Creek | posted for load | 1960 | 1,100 | January 2023 | Fair |
| Vergel Street over Juan Mendez Creek | posted for load | 1950 | 1,000 | August 2023 | Fair |
| Pr 1 over Martin PE¥A Channel | open, posting recommended | 1953 | 35,900 | June 2023 | Fair |
| Pr 176 over Piedras River | open, posting recommended | 1953 | 27,100 | March 2025 | Poor |
| De Diego Av .10 Km over Guaralcanal Creek | open, posting recommended | 1990 | 24,800 | December 2023 | Fair |
| 21 St 0.1 Km over DOÑA Ana Creek | open, posting recommended | 1960 | 3,000 | July 2024 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 27 on 12 months or less, 174 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in San Juan Municipio is dated March 2025; 3 bridges have an inspection dated in 2025.
Scour critical (item 113): 10 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 17 Wbd 4.3 Km over Piedras River | open | 1950 | 44,600 | October 2024 | Fair |
| Pr 176 over Piedras River | open, posting recommended | 1953 | 27,100 | March 2025 | Poor |
| W Churchil 0.60 Km over Piedras River | open | 1965 | 27,100 | August 2024 | Fair |
| Pr 177 9.6 Km over Piedras River | open | 1989 | 24,600 | August 2024 | Fair |
| Pr 17 4.0 Km over Piedras River | open | 1967 | 21,250 | January 2024 | Fair |
| Ntre Dme St 0.1 Km over Piedras River | open | 1965 | 11,200 | February 2024 | Poor |
| Off Pr 176 7.5 Km over Piedras River | open | 1972 | 4,000 | August 2024 | Fair |
| Off Pr 845 Km 1.06 over Guaracanal Creek | open | 1982 | 2,480 | December 2024 | Fair |
| Jln Bengch 0.1 Km over Santo Domingo Creek | posted for load | 1950 | 1,300 | February 2024 | Fair |
| Cipreses Street over Sabana Llana Creek | closed | 1975 | 350 | February 2023 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 18 3.35 Km over Ave. Amer Miranda 1.4 Km | 1967 | 261,400 | Poor |
| Pr 18 2.1 Km over Piedras River | 1967 | 261,000 | Fair |
| Ramp PR18 0.02 Km over Pr 18 NB Pr 22 WB Km 2 | 2007 | 239,000 | Fair |
| Rmp 18 SB 21 WB over Ramp Pr-21 Centro Medico | 2018 | 239,000 | Good |
| Pr-18 over Pr-21 | 2020 | 239,000 | Good |
| Pr 22 0.7 Km over Pr 35 2.4 Km | 1976 | 201,100 | Fair |
| Pr 22 Pr 18 .1 Km over Los Muertos Creek | 1975 | 196,173 | Fair |
| Pr 22 Westbound over Piedras River | 1975 | 196,100 | Fair |
| Pr 22 Eastbound over Piedras River | 1975 | 196,100 | Fair |
| Pr 2 Pr 22 4.3 Km over Ramp Pr 28 Pr 2 4.7 Km | 2000 | 196,100 | Fair |
Frequently asked questions
Are any bridges closed in San Juan Municipio, Puerto Rico?
1 bridge of the 201 in San Juan Municipio is coded closed to all traffic in the 2025 National Bridge Inventory, and 43 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in San Juan Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for San Juan Municipio: no bridges with a component rated 2 (critical) or lower, 21 bridges rated poor overall, and 2 bridges that dropped into poor condition since the 2024 inventory.
When were bridges in San Juan Municipio last inspected?
Inspection dates in the 2025 inventory for San Juan Municipio run from January 2023 to March 2025. Intervals: 27 on 12 months or less, 174 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in San Juan Municipio → - all 201, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.