Bridge conditions in San Juan Municipio, Puerto Rico

201 inventoried bridges · 1 closed · 43 posted · 21 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 201 bridges.

San Juan Municipio has 21 bridges rated poor out of 201 inventoried, a 10.4% share that puts it well above the national rate of about 7%.

What this page is: the federal bridge inspection inventory for San Juan Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 20.9% · Fair 68.7% · Poor 10.4% of 201 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

2
dropped into poor
since 2024
0
improved out of poor
since 2024
20
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Pr 18 3.35 Km over Ave. Amer Miranda 1.4 Kmfair to poor; superstructure 5 to 4FairPoor261,400
Pr 1 over Pr 18 (las Americas Exp)fair to poor; deck 5 to 4FairPoor45,500
Ramp PR18 0.02 Km over Pr 18 NB Pr 22 WB Km 2load posting removed; good to fair; deck 7 to 6; superstructure 8 to 7; substructure 8 to 7GoodFair239,000
Ramp 20 to Pr 177 over Local Road Urban Traingood to fair; substructure 7 to 6GoodFair52,800
Pr 2 over Marginal Pr 2good to fair; deck 7 to 6GoodFair51,500
U.p.r. Local Rd over Pr 17 6.2 Kmgood to fair; deck 7 to 6GoodFair100
Pr 2 Pr 22 4.3 Km over Ramp Pr 28 Pr 2 4.7 Kmdeck 6 to 5; superstructure 8 to 6; substructure 8 to 7FairFair196,100
Ramp PR18 to PR22 over Pr 18deck 6 to 5FairFair183,900
Pr 1 over Martin PE¥A Channelload posting removed; substructure 6 to 5FairFair35,900
Pr 25 8.0 Km over Martin PE¥A Channelsubstructure 6 to 5PoorPoor28,800
Ramp Pr 22 to Pr 1 over Ramp Pr 1 to L A Streetsubstructure 6 to 5FairFair5,500
Pr 176 10.4 Km over Chorros Creekdeck 6 to 5PoorPoor4,000
Pr 22 0.7 Km over Pr 35 2.4 Kmsubstructure 7 to 6FairFair201,100
Pr 18 1.00 Km over Pr 23 2.50 Kmsuperstructure 7 to 6PoorPoor183,900
Pr 22 Nrbd 1.7 Km over Martin PE¥A Channelsubstructure 7 to 6FairFair117,050
Pr 52 Sobd 4.1 Km over Montehiedra Avenuesuperstructure 7 to 6; substructure 7 to 6FairFair60,150
Pr 22 Sthbd 1.9 Km over Martin PE¥A Channelsuperstructure 7 to 6FairFair58,525
Pr 52 Nobd 8.7 Km over Local Roadsuperstructure 7 to 6FairFair52,700
PR17 PR8 8.6 Km over Access to Mall of Sjdeck 8 to 7GoodGood40,000
Pr 181 67.5 Km over Pr 3 3.5 Kmdeck 8 to 7; superstructure 8 to 7GoodGood16,200

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 18 over Los Muertos Creekload posting removedGoodGood187,900
Ramp Pr 22 - Pr 18 over Los Muertos Creekload posting removedFairFair84,000
Pr-52 over Access Roadload posting removedGoodGood52,700
Pr 176 over Piedras Riverload posting removedPoorPoor27,100
De Diego Av .10 Km over Guaralcanal Creekload posting removedFairFair24,800
Ave Centro Medico over Pr-21 1.5 Kmload posting removedGoodGood15,900
Ramp Char to Sju over Calle Kalafload posting removedGoodGood12,300
Pr 873 0.7 Km over Frailes Creekload posting removedPoorPoor9,900
Pr-25 over San Antonio Channelfair to good; substructure up 5 to 7FairGood6,600
21 St 0.1 Km over DOÑA Ana Creekload posting removedFairFair3,000

no structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Cipreses Street over Sabana Llana Creekclosed1975350February 2023Fair
Pr 18 3.35 Km over Ave. Amer Miranda 1.4 Kmposted for load1967261,400December 2024Poor
Pr 18 2.1 Km over Piedras Riverposted for load1967261,000December 2023Fair
Pr 18 1.00 Km over Pr 23 2.50 Kmposted for load1967183,900March 2024Poor
Pr 18 over Kalaf Streetposted for load1972183,900March 2023Fair
Pr 18 2.6 Km over Pr 17 4.0 Kmposted for load1967183,800January 2024Poor
Pr 18 over Domenech Streetposted for load1967183,800August 2023Fair
Pr 18 over Ramp From Pr 21posted for load196580,700June 2023Fair
Pr 22 Sthbd 1.9 Km over Martin PE¥A Channelposted for load198058,525March 2024Fair
Pr 3 over Pr 1posted for load195848,600November 2024Fair
Pr 3 over Street # 1posted for load195848,600November 2024Fair
Pr 1 3.4 Km over Pr 35 0.1 Kmposted for load195845,400July 2024Fair
Pr 1 5.0 Km over Pr 39 0.01 Kmposted for load195445,400August 2024Fair
Pr 17 (PI¥ERO over Josefina Creekposted for load195042,500December 2024Fair
Pr 1 6.0 Km over Concepcion Streetposted for load197133,900July 2023Fair
Pr 25 2.7 Km over Pr 1 3.0 Kmposted for load195828,800July 2024Fair
Ramon B. Lopez St over Juan Mendez Creekposted for load194225,400August 2024Fair
Pr 1 15.4 Km over San Roberto Streetposted for load196722,750February 2024Poor
Pr 1 15.7 Km over San Roberto Streetposted for load196722,750December 2024Poor
Amrco Mrnda 1.6 Km over DOÑA Ana Creekposted for load195020,300July 2024Fair
De Diego Avenue over Do%a Ana Creekposted for load195520,199November 2024Fair
Pr 1 7.4 Km over Sagrado Corazon Streetposted for load197117,950October 2024Fair
Sicilia Street over Juan Mendez Creekposted for load197715,200December 2024Fair
Pr 23 Km 2.3 over Piedras Riverposted for load195114,850August 2024Fair
Pr 23 Westbound over Piedras Riverposted for load195014,850August 2024Fair
Silicia St 0.7 Km over Juan Mendez Creek Km 0.7posted for load195013,800August 2024Fair
Pr 41 over De Los Muertos Creekposted for load192911,500January 2023Fair
PR18 PR17 10.1 Km over Piedras Riverposted for load196711,200October 2024Poor
29 St S.E 0.1 Km over DO¥A Ana Creekposted for load19558,500July 2024Fair
Ramp PR25 to PR17 over Ramp From Pr 17 to Pr 1posted for load19965,700November 2024Fair
Ramp Pr 22 to Pr 1 over Ramp Pr 1 to L A Streetposted for load19795,500August 2024Fair
Robles St 0.3 Km over Urban City Streetposted for load19785,000September 2024Fair
Pr 842 over Arenas Creekposted for load19614,100December 2024Fair
Pr 176 10 Km over Depressionposted for load19404,000August 2024Fair
Pr 176 10.4 Km over Chorros Creekposted for load19404,000August 2024Poor
Pr 176 10.5 Km over Negrita Creekposted for load19404,000August 2024Fair
Pr 176 11.05 Km over Carraizo Creekposted for load19404,000August 2024Fair
Galileo Street over Buena Vista Creekposted for load19503,762January 2023Fair
Belmonte Street over Juan Mendez Creekposted for load19513,200August 2024Fair
Lbtd Street 0.3 Km over Juan Mendez Creekposted for load19403,000February 2024Fair
Vergel Street over Juan Mendez Creekposted for load19772,000December 2024Fair
Jln Bengch 0.1 Km over Santo Domingo Creekposted for load19501,300February 2024Fair
13 Street over DO¥A Ana Creekposted for load19601,100January 2023Fair
Vergel Street over Juan Mendez Creekposted for load19501,000August 2023Fair
Pr 1 over Martin PE¥A Channelopen, posting recommended195335,900June 2023Fair
Pr 176 over Piedras Riveropen, posting recommended195327,100March 2025Poor
De Diego Av .10 Km over Guaralcanal Creekopen, posting recommended199024,800December 2023Fair
21 St 0.1 Km over DOÑA Ana Creekopen, posting recommended19603,000July 2024Fair

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 27 on 12 months or less, 174 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in San Juan Municipio is dated March 2025; 3 bridges have an inspection dated in 2025.

Scour critical (item 113): 10 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 17 Wbd 4.3 Km over Piedras Riveropen195044,600October 2024Fair
Pr 176 over Piedras Riveropen, posting recommended195327,100March 2025Poor
W Churchil 0.60 Km over Piedras Riveropen196527,100August 2024Fair
Pr 177 9.6 Km over Piedras Riveropen198924,600August 2024Fair
Pr 17 4.0 Km over Piedras Riveropen196721,250January 2024Fair
Ntre Dme St 0.1 Km over Piedras Riveropen196511,200February 2024Poor
Off Pr 176 7.5 Km over Piedras Riveropen19724,000August 2024Fair
Off Pr 845 Km 1.06 over Guaracanal Creekopen19822,480December 2024Fair
Jln Bengch 0.1 Km over Santo Domingo Creekposted for load19501,300February 2024Fair
Cipreses Street over Sabana Llana Creekclosed1975350February 2023Fair

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Pr 18 3.35 Km over Ave. Amer Miranda 1.4 Km1967261,400Poor
Pr 18 1.00 Km over Pr 23 2.50 Km1967183,900Poor
Pr 18 0.65 Km over Chardon Street1972183,900Poor
Pr 18 2.6 Km over Pr 17 4.0 Km1967183,800Poor
Pr 52 Southbound over Pr 177 8.4 Km197976,650Poor
Pr 1 over Pr 18 (las Americas Exp)197745,500Poor
Pr 1 15.1 Km over Pr 52197745,500Poor
Pr 1 15.1 Km over Pr 52 0.15 Km197645,500Poor
Ramp Pr 2 to Pr 1 over Pr 2196638,250Poor
Pr 25 8.0 Km over Martin PE¥A Channel193928,800Poor
Pr 177 7.15 Km over Pr 1 16.35 Km197627,600Poor
Pr 176 over Piedras River195327,100Poor
Pr 1 15.7 Km over San Roberto Street196722,750Poor
Pr 1 15.4 Km over San Roberto Street196722,750Poor
Pr 37 0.9 Km over Pr 26 0.1 Km197920,500Poor
Ramp Pr 1 to Pr 22 over Ramp Marginal St to Pr 1197913,599Poor
PR18 PR17 10.1 Km over Piedras River196711,200Poor
Ntre Dme St 0.1 Km over Piedras River196511,200Poor
Pr 873 0.7 Km over Frailes Creek18559,900Poor
Pr 176 10.4 Km over Chorros Creek19404,000Poor
Pr 176 6.1 Km over Las CURÍAS Creek19364,000Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 18 3.35 Km over Ave. Amer Miranda 1.4 Km1967261,400Poor
Pr 18 2.1 Km over Piedras River1967261,000Fair
Ramp PR18 0.02 Km over Pr 18 NB Pr 22 WB Km 22007239,000Fair
Rmp 18 SB 21 WB over Ramp Pr-21 Centro Medico2018239,000Good
Pr-18 over Pr-212020239,000Good
Pr 22 0.7 Km over Pr 35 2.4 Km1976201,100Fair
Pr 22 Pr 18 .1 Km over Los Muertos Creek1975196,173Fair
Pr 22 Westbound over Piedras River1975196,100Fair
Pr 22 Eastbound over Piedras River1975196,100Fair
Pr 2 Pr 22 4.3 Km over Ramp Pr 28 Pr 2 4.7 Km2000196,100Fair

Frequently asked questions

Are any bridges closed in San Juan Municipio, Puerto Rico?

1 bridge of the 201 in San Juan Municipio is coded closed to all traffic in the 2025 National Bridge Inventory, and 43 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in San Juan Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for San Juan Municipio: no bridges with a component rated 2 (critical) or lower, 21 bridges rated poor overall, and 2 bridges that dropped into poor condition since the 2024 inventory.

When were bridges in San Juan Municipio last inspected?

Inspection dates in the 2025 inventory for San Juan Municipio run from January 2023 to March 2025. Intervals: 27 on 12 months or less, 174 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in San Juan Municipio → - all 201, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.