Bridge conditions in San Lorenzo Municipio, Puerto Rico
51 inventoried bridges · 1 closed · 12 posted · 10 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 51 bridges (1 without coordinates in the inventory is not shown).
About one in 5 bridges in San Lorenzo Municipio is rated in poor condition: 10 of 51 on the federal inventory, one of the higher shares in Puerto Rico.
- 10 of the 51 bridges in San Lorenzo Municipio, Puerto Rico, are rated in poor condition (19.6%) in the 2025 National Bridge Inventory, as of .
- San Lorenzo Municipio has 1 bridge closed to all traffic and 12 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 5 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 2 bridges dropped into poor condition and no bridges improved out of it; 7 bridges had at least one major component rating lowered.
- Inspection dates on record run from March 2023 to March 2025; 23 bridges over water are coded scour critical.
- 7 bridges (13.7%) are rated good and 34 (66.7%) fair.
- The median San Lorenzo Municipio bridge was built in 1965.
- The busiest poor-rated bridge is Pr 181 16.8 Km over Grande De Loiza River (built 1940), carrying about 8,300 vehicles a day.
What this page is: the federal bridge inspection inventory for San Lorenzo Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 13.7% · Fair 66.7% · Poor 19.6% of 51 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Off Pr 745 4.5 Km over Emajagua River | fair to poor; substructure 6 to 4 | Fair | Poor | 1,400 |
| Pr 9920 over Grande De Loiza River | load posting removed; fair to poor; superstructure 5 to 4 | Fair | Poor | 800 |
| Pr 932 0.3 Km over Pr 203 2.5 Km | good to fair; deck 7 to 6 | Good | Fair | 1,400 |
| Pr 9912 0.1 Km over Grande De Loiza River | substructure 5 to 4 | Poor | Poor | 5,000 |
| Pr 183 8.1 Km over Hato Creek | superstructure 6 to 5 | Fair | Fair | 10,000 |
| Off Pr 788 4.2 Km over Unknown Creek | deck 7 to 6 | Fair | Fair | 3,300 |
| Off Pr 181 6.4 Km over Prieta Creek | superstructure 7 to 6 | Fair | Fair | 600 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Off Pr 183 12.7 Km over Unnamed Creek | load posting removed | Fair | Fair | 10,300 |
| Pr 181 over Grande De Loiza River | load posting removed | Fair | Fair | 8,700 |
| Pr 902 0.02 Km over Grande De Loiza River | load posting removed | Fair | Fair | 3,800 |
| Off Pr 788 3.7 Km over Unknown Creek | load posting removed | Poor | Poor | 3,300 |
| Pr 181 over Waterway | load posting removed | Fair | Fair | 2,600 |
| Pr 181 over Hato Quemado Creek | load posting removed | Fair | Fair | 1,700 |
| Off Pr 745 3.7 Km over Emajagua River | load posting removed | Fair | Fair | 1,400 |
| PR-9920 Km.4.30 over Waterway Unname Creek | load posting removed | Good | Good | 800 |
| Pr 9929 0.1 Km over Creek | load posting removed | Poor | Poor | 600 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Off Pr 203 over Grande De Loiza River | closed | 2003 | – | September 2024 | Good |
| Pr 181 over Blanca Creek | posted for load | 1926 | 7,900 | August 2023 | Fair |
| Pr 181 over Emajagua Creek | posted for load | 1939 | 6,300 | August 2023 | Fair |
| Pr 9912 0.1 Km over Grande De Loiza River | posted for load | 1950 | 5,000 | February 2024 | Poor |
| Pr 9912 3.05 Km over Cayaguas River | posted for load | 1969 | 4,800 | July 2024 | Fair |
| Pr 181 over Creek | posted for load | 1940 | 1,800 | November 2023 | Fair |
| Pr 181 over Honda Creek | posted for load | 1939 | 1,800 | August 2023 | Fair |
| Off Pr 183 over Unnamed Creek | posted for load | 1999 | 1,030 | September 2024 | Fair |
| Pr 9920 1.6 Km over Arenas Creek | posted for load | 1971 | 800 | June 2024 | Fair |
| Pr 181 9.1 Km over Creek | posted for load | 1940 | 700 | January 2024 | Fair |
| Pr 913 over Honda Creek | posted for load | 1986 | 600 | August 2023 | Fair |
| Pr 916 Km 0.9 over Arenas Creek | posted for load | 1961 | 600 | February 2024 | Fair |
| Off Pr 902 4.4 Km over Capeles Creek | posted for load | 1991 | 150 | June 2024 | Poor |
| Pr 181 over Grande De Loiza River | open, posting recommended | 1955 | 8,700 | October 2023 | Fair |
| Off Pr 788 3.7 Km over Unknown Creek | open, posting recommended | 1999 | 3,300 | July 2024 | Poor |
| Pr 181 over Hato Quemado Creek | open, posting recommended | 1925 | 1,700 | August 2023 | Fair |
| Pr 9920 over Grande De Loiza River | open, posting recommended | 1960 | 800 | October 2024 | Poor |
| Pr 9929 0.1 Km over Creek | open, posting recommended | 1930 | 600 | February 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 16 on 12 months or less, 35 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in San Lorenzo Municipio is dated March 2025; 1 bridges have an inspection dated in 2025.
Scour critical (item 113): 23 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 2 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 9931 0.6 Km over Creek | open | 1945 | 11,900 | January 2024 | Fair |
| Off Pr 183 12.7 Km over Unnamed Creek | open | 1999 | 10,300 | July 2024 | Fair |
| Pr 181 over Grande De Loiza River | open, posting recommended | 1955 | 8,700 | October 2023 | Fair |
| Pr 181 16.8 Km over Grande De Loiza River | open | 1940 | 8,300 | September 2024 | Poor |
| Pr 181 18.7 Km over Berraco Creek | open | 1940 | 6,300 | October 2024 | Poor |
| Pr 181 over Lajas Creek | open | 1939 | 6,300 | August 2023 | Fair |
| Pr 9912 0.1 Km over Grande De Loiza River | posted for load | 1950 | 5,000 | February 2024 | Poor |
| Pr 9912 3.05 Km over Cayaguas River | posted for load | 1969 | 4,800 | July 2024 | Fair |
| Off Pr 788 3.7 Km over Unknown Creek | open, posting recommended | 1999 | 3,300 | July 2024 | Poor |
| Off Pr 788 4.2 Km over Unknown Creek | open | 1999 | 3,300 | June 2024 | Fair |
| Pr 181 over Waterway | open | 1930 | 2,600 | August 2023 | Fair |
| Pr 181 over Honda Creek | posted for load | 1939 | 1,800 | August 2023 | Fair |
| Off Pr 745 2.3 Km over Emajagua River | open | 1950 | 1,400 | August 2024 | Fair |
| Off Pr 745 3.2 Km over Emajagua River | open | 1950 | 1,400 | June 2024 | Fair |
| Off Pr 745 3.7 Km over Emajagua River | open | 1973 | 1,400 | March 2024 | Fair |
| Off Pr 745 4.5 Km over Emajagua River | open | 1964 | 1,400 | March 2024 | Poor |
| Off Pr 183 over Unnamed Creek | posted for load | 1999 | 1,030 | September 2024 | Fair |
| Pr 9920 over Grande De Loiza River | open, posting recommended | 1960 | 800 | October 2024 | Poor |
| Pr 181 9.1 Km over Creek | posted for load | 1940 | 700 | January 2024 | Fair |
| Off Pr 913 over Waterway | open | 2007 | 600 | November 2024 | Fair |
| Pr 9929 0.1 Km over Creek | open, posting recommended | 1930 | 600 | February 2024 | Poor |
| Pr 9916 0.02 Km over Unknown Creek | open | 1992 | 300 | July 2024 | Fair |
| Off Pr 902 4.4 Km over Capeles Creek | posted for load | 1991 | 150 | June 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 181 16.8 Km over Grande De Loiza River | 1940 | 8,300 | Poor |
| Off Pr 765 2.7 Km over Blanca Creek | 1996 | 7,700 | Poor |
| Pr 181 17.9 Km over Unknown Creek | 1940 | 6,300 | Poor |
| Pr 181 18.7 Km over Berraco Creek | 1940 | 6,300 | Poor |
| Pr 9912 0.1 Km over Grande De Loiza River | 1950 | 5,000 | Poor |
| Off Pr 788 3.7 Km over Unknown Creek | 1999 | 3,300 | Poor |
| Off Pr 745 4.5 Km over Emajagua River | 1964 | 1,400 | Poor |
| Pr 9920 over Grande De Loiza River | 1960 | 800 | Poor |
| Pr 9929 0.1 Km over Creek | 1930 | 600 | Poor |
| Off Pr 902 4.4 Km over Capeles Creek | 1991 | 150 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 203 5.8 Km over GDE. DE LOIZA RV.&PR | 1998 | 17,900 | Fair |
| Pr 183 over Los Puercos Creek | 2000 | 17,080 | Good |
| Pr 9931 0.6 Km over Creek | 1945 | 11,900 | Fair |
| Off Pr 183 12.7 Km over Unnamed Creek | 1999 | 10,300 | Fair |
| Pr 183 8.1 Km over Hato Creek | 1925 | 10,000 | Fair |
| Pr 916 3.5 Km over Quebrada Grande Creek | 2003 | 9,200 | Good |
| Pr 181 over Grande De Loiza River | 1955 | 8,700 | Fair |
| Pr 183 11.3 Km over Grande De Loiza River | 1965 | 8,400 | Fair |
| Pr 181 16.8 Km over Grande De Loiza River | 1940 | 8,300 | Poor |
| Pr 181 over Blanca Creek | 1926 | 7,900 | Fair |
Frequently asked questions
Are any bridges closed in San Lorenzo Municipio, Puerto Rico?
1 bridge of the 51 in San Lorenzo Municipio is coded closed to all traffic in the 2025 National Bridge Inventory, and 12 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in San Lorenzo Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for San Lorenzo Municipio: no bridges with a component rated 2 (critical) or lower, 10 bridges rated poor overall, and 2 bridges that dropped into poor condition since the 2024 inventory.
When were bridges in San Lorenzo Municipio last inspected?
Inspection dates in the 2025 inventory for San Lorenzo Municipio run from March 2023 to March 2025. Intervals: 16 on 12 months or less, 35 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in San Lorenzo Municipio → - all 51, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.