Bridge conditions in Santa Isabel Municipio, Puerto Rico
13 inventoried bridges · 0 closed · 0 posted · 3 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 13 bridges.
Of the 13 Santa Isabel Municipio bridges in the federal inventory, 3 carry a poor rating. That 23.1% share is roughly 3x the national average.
- 3 of the 13 bridges in Santa Isabel Municipio, Puerto Rico, are rated in poor condition (23.1%) in the 2025 National Bridge Inventory, as of .
- Santa Isabel Municipio has no bridges closed to all traffic and no bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 2 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; no bridges had at least one major component rating lowered.
- 1 bridge has a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from May 2023 to November 2024.
- 1 bridges (7.7%) are rated good and 9 (69.2%) fair.
- The median Santa Isabel Municipio bridge was built in 1971.
- The busiest poor-rated bridge is Pr 52 Sou 71.5 Km over Pr 543 3.4 Km Jueyes Ri (built 1971), carrying about 18,900 vehicles a day.
What this page is: the federal bridge inspection inventory for Santa Isabel Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 7.7% · Fair 69.2% · Poor 23.1% of 13 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
No bridge in Santa Isabel Municipio dropped a condition class, lost a point on a component rating, or was newly closed or posted between the two inventories.
1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 52 Southbound over COAMO RIVER & PR 545 | open, posting recommended | 1972 | 20,600 | May 2024 | Fair |
| Pr 536 over Descalabrado River | open on a temporary structure | 1951 | 800 | May 2023 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 3 on 12 months or less, 10 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Santa Isabel Municipio is dated November 2024; 10 bridges have an inspection dated in 2024.
Scour critical (item 113): no bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 2 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 536 over Descalabrado River | open on a temporary structure | 1951 | 800 | May 2023 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 52 Sou 71.5 Km over Pr 543 3.4 Km Jueyes Ri | 1971 | 18,900 | Poor |
| Pr 52 Northbound over Pr 543 and Jueyes River | 1971 | 18,000 | Poor |
| Pr 536 over Descalabrado River | 1951 | 800 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 52 Northbound over Pr 153 | 1971 | 41,200 | Fair |
| Pr 52 Northbound over Dirt Road | 1971 | 20,750 | Fair |
| Pr 52 Southbound over Dirt Road | 1971 | 20,750 | Fair |
| Pr 52 Northbound over COAMO RIVER & PR 545 | 1972 | 20,600 | Fair |
| Pr 52 Southbound over COAMO RIVER & PR 545 | 1972 | 20,600 | Fair |
| Pr 52 Southbound over Pr 153 | 1971 | 19,100 | Fair |
| Pr 52 Sou 71.5 Km over Pr 543 3.4 Km Jueyes Ri | 1971 | 18,900 | Poor |
| Pr 52 Northbound over Pr 543 and Jueyes River | 1971 | 18,000 | Poor |
| Pr 52 Northbound over Pr 536 | 1970 | 13,950 | Fair |
| Pr 52 Southbound over Pr 536 | 1970 | 13,950 | Fair |
Frequently asked questions
Are any bridges closed in Santa Isabel Municipio, Puerto Rico?
None of the 13 bridges in Santa Isabel Municipio is coded closed or posted in the 2025 National Bridge Inventory. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Santa Isabel Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Santa Isabel Municipio: 1 bridge with a component rated 2 (critical) or lower, 3 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Santa Isabel Municipio last inspected?
Inspection dates in the 2025 inventory for Santa Isabel Municipio run from May 2023 to November 2024. Intervals: 3 on 12 months or less, 10 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Santa Isabel Municipio → - all 13, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.