Bridge conditions in Trujillo Alto Municipio, Puerto Rico
12 inventoried bridges · 0 closed · 1 posted · 2 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 12 bridges.
Of the 12 Trujillo Alto Municipio bridges in the federal inventory, 2 carry a poor rating. That 16.7% share is roughly 2x the national average.
- 2 of the 12 bridges in Trujillo Alto Municipio, Puerto Rico, are rated in poor condition (16.7%) in the 2025 National Bridge Inventory, as of .
- Trujillo Alto Municipio has no bridges closed to all traffic and 1 bridge posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 1 more bridge is open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and 2 bridges improved out of it; 1 bridge had at least one major component rating lowered.
- Inspection dates on record run from March 2023 to October 2024; 4 bridges over water are coded scour critical.
- 2 bridges (16.7%) are rated good and 8 (66.7%) fair.
- The median Trujillo Alto Municipio bridge was built in 1990.
- The busiest poor-rated bridge is Pr 181 62.0 Km over Grande De Loiza River (built 1985), carrying about 42,600 vehicles a day.
What this page is: the federal bridge inspection inventory for Trujillo Alto Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 16.7% · Fair 66.7% · Poor 16.7% of 12 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 852 0.05 Km over Dos Bocas Creek | deck 6 to 5 | Fair | Fair | 10,400 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Off Pr 852 Km 14.2 over Unnamed Creek | load posting removed | Fair | Fair | 2,800 |
| Conn. PR181 to 175 over Rio Grande De Loiza | poor to fair; deck up 5 to 7; superstructure up 5 to 7; substructure up 4 to 5 | Poor | Fair | 2,700 |
| Pr 851 4.1 Km over Infierno Creek | load posting removed | Fair | Fair | 2,100 |
| Off Pr 825 4.2 Km over Unknown Creek | poor to fair; superstructure up 4 to 5 | Poor | Fair | 2,000 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Off Pr 825 4.2 Km over Unknown Creek | posted for load | 2003 | 2,000 | March 2024 | Fair |
| Pr 851 4.1 Km over Infierno Creek | open, posting recommended | 1965 | 2,100 | October 2024 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 4 on 12 months or less, 8 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Trujillo Alto Municipio is dated October 2024; 5 bridges have an inspection dated in 2024.
Scour critical (item 113): 4 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 181 over Infierno Creek | open | 1925 | 13,400 | August 2023 | Fair |
| Pr 852 0.05 Km over Dos Bocas Creek | open | 1980 | 10,400 | November 2023 | Fair |
| Pr 175 12 Km over Creek | open | 1950 | 6,800 | February 2024 | Poor |
| Off Pr 852 over Unknown Creek | open | 2003 | 100 | May 2023 | Good |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 181 62.0 Km over Grande De Loiza River | 1985 | 42,600 | Poor |
| Pr 175 12 Km over Creek | 1950 | 6,800 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 181 62.0 Km over Grande De Loiza River | 1985 | 42,600 | Poor |
| Pr 8860 over Creek | 1993 | 25,900 | Good |
| Pr 181 over Infierno Creek | 1925 | 13,400 | Fair |
| Pr 852 0.05 Km over Dos Bocas Creek | 1980 | 10,400 | Fair |
| Pr 175 12 Km over Creek | 1950 | 6,800 | Poor |
| Pr 175 over Carraizo Creek | 1953 | 6,600 | Fair |
| Off Pr 852 Km 14.2 over Unnamed Creek | 2003 | 2,800 | Fair |
| Conn. PR181 to 175 over Rio Grande De Loiza | 2007 | 2,700 | Fair |
| Pr 851 4.1 Km over Infierno Creek | 1965 | 2,100 | Fair |
| Off Pr 825 4.2 Km over Unknown Creek | 2003 | 2,000 | Fair |
Frequently asked questions
Are any bridges closed in Trujillo Alto Municipio, Puerto Rico?
No bridges of the 12 in Trujillo Alto Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 1 bridge is posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Trujillo Alto Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Trujillo Alto Municipio: no bridges with a component rated 2 (critical) or lower, 2 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Trujillo Alto Municipio last inspected?
Inspection dates in the 2025 inventory for Trujillo Alto Municipio run from March 2023 to October 2024. Intervals: 4 on 12 months or less, 8 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Trujillo Alto Municipio → - all 12, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.