Bridge conditions in Vega Alta Municipio, Puerto Rico
18 inventoried bridges · 0 closed · 1 posted · 3 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 18 bridges.
Vega Alta Municipio has 3 bridges rated poor out of 18 inventoried, a 16.7% share that puts it well above the national rate of about 7%.
- 3 of the 18 bridges in Vega Alta Municipio, Puerto Rico, are rated in poor condition (16.7%) in the 2025 National Bridge Inventory, as of .
- Vega Alta Municipio has no bridges closed to all traffic and 1 bridge posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 1 more bridge is open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; 2 bridges had at least one major component rating lowered, 1 newly load-posted.
- 1 bridge has a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from February 2023 to December 2024; 1 bridge over water is coded scour critical.
- 3 bridges (16.7%) are rated good and 12 (66.7%) fair.
- The median Vega Alta Municipio bridge was built in 1991.
- The busiest poor-rated bridge is Pr 22 Eastbound over PR 2 PR 676 & WATER (built 1993), carrying about 27,100 vehicles a day.
What this page is: the federal bridge inspection inventory for Vega Alta Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 16.7% · Fair 66.7% · Poor 16.7% of 18 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 690 over Honda Creek | newly posted for load | Fair | Fair | 10,300 |
| Pr 22 Pr 2 32.4 Km over Unknown Creek | substructure 7 to 6 | Fair | Fair | 70,100 |
| Pr 22 Westbound over PR 2 PR 676 & WATER | superstructure 7 to 6 | Fair | Fair | 27,100 |
2 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 690 over Honda Creek | posted for load | 1981 | 10,300 | June 2023 | Fair |
| Pr 647 8.3 Km over Cibuco River | open on a temporary structure | 2003 | 2,000 | May 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 3 on 12 months or less, 15 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Vega Alta Municipio is dated December 2024; 12 bridges have an inspection dated in 2024.
Scour critical (item 113): 1 bridge. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 2 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 620 over Cibuco River | open | 1954 | 500 | March 2023 | Fair |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 647 8.3 Km over Cibuco River | open on a temporary structure | 2003 | 2,000 | May 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 22 Eastbound over PR 2 PR 676 & WATER | 1993 | 27,100 | Poor |
| Pr 675 Km 0.3 over Cibuco River | 1952 | 3,700 | Poor |
| Pr 647 8.3 Km over Cibuco River | 2003 | 2,000 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 22 Pr 2 32.4 Km over Unknown Creek | 1991 | 70,100 | Fair |
| Pr 22 Westbound over Local Road | 1991 | 54,200 | Fair |
| Pr 22 Westbound over Pr 690 | 1991 | 54,200 | Good |
| Pr 22 Eastbound over Pr 690 | 1991 | 54,200 | Good |
| Pr 22 Westbound over PR 2 PR 676 & WATER | 1993 | 27,100 | Fair |
| Pr 22 Eastbound over PR 2 PR 676 & WATER | 1993 | 27,100 | Poor |
| Pr 22 Etbd 29.1 Km over Local Road | 1991 | 27,100 | Fair |
| Pr 22 Webd 30.6 Km over Dirt Road | 1991 | 27,100 | Fair |
| Pr 22 Etbd 30.6 Km over Dirt Road | 1991 | 27,100 | Fair |
| Ramp Pr 2 to Pr 22 over Unknown Creek | 1991 | 21,100 | Fair |
Frequently asked questions
Are any bridges closed in Vega Alta Municipio, Puerto Rico?
No bridges of the 18 in Vega Alta Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 1 bridge is posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Vega Alta Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Vega Alta Municipio: 1 bridge with a component rated 2 (critical) or lower, 3 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Vega Alta Municipio last inspected?
Inspection dates in the 2025 inventory for Vega Alta Municipio run from February 2023 to December 2024. Intervals: 3 on 12 months or less, 15 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Vega Alta Municipio → - all 18, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.