BridgeReportCard
Home › Puerto Rico › Vega Baja Municipio

Bridge conditions in Vega Baja Municipio, Puerto Rico

23 inventoried bridges · 1 closed · 2 posted · 3 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 23 bridges.

About one in 8 bridges in Vega Baja Municipio is rated in poor condition: 3 of 23 on the federal inventory, one of the higher shares in Puerto Rico.

What this page is: the federal bridge inspection inventory for Vega Baja Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 13.0% · Fair 73.9% · Poor 13.0% of 23 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

0
dropped into poor
since 2024
1
improved out of poor
since 2024
4
had a rating lowered
deck, superstructure, substructure or culvert
1
newly closed or posted
1 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Pr 676 7.3 Km over Cibuco Rivernewly closedPoorPoor800
Pr 22 35.8 Km over Pr 160 2.2 Kmsubstructure 7 to 6FairFair70,100
Pr 22 42.5 Km over Local Roadsuperstructure 7 to 6FairFair54,700
Pr 22 Wbd 33.75 Km over Pr 674superstructure 7 to 6FairFair44,750
Pr 646 0.1 Km over Hicotea Creekdeck 8 to 7GoodGood300

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 676 over Depressionload posting removedFairFair7,200
Pr 646 4.7 Km over Indio Riverreopened; poor to fair; substructure up 1 to 6PoorFair800

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 676 7.3 Km over Cibuco Riverclosed1886800September 2024Poor
Pr 155 57.2 Km over Hicotea Creekposted for load19401,200July 2024Fair
Pr 645 over Indio Riverposted for load19511,000February 2023Fair
Pr 676 over Depressionopen, posting recommended18867,200October 2023Fair

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 4 on 12 months or less, 19 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Vega Baja Municipio is dated March 2025; 2 bridges have an inspection dated in 2025.

Scour critical (item 113): 3 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 1 bridge. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 155 57.2 Km over Hicotea Creekposted for load19401,200July 2024Fair
Pr 645 over Hicotea Creekopen19871,000March 2025Fair
Pr 676 7.3 Km over Cibuco Riverclosed1886800September 2024Poor

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Pr 22 over Local Road199589,500Poor
Pr 2 over Cibuco River194721,700Poor
Pr 676 7.3 Km over Cibuco River1886800Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 22 38.0 Km over Vista Verde Avenue199589,500Fair
Pr 22 39.9 Km over Pr 155 65.7 Km199589,500Fair
Pr 22 over Local Road199589,500Poor
Pr 22 over Pr 137199589,500Fair
Pr 22 35.8 Km over Pr 160 2.2 Km199570,100Fair
Pr 22 Eastbound over PR 674 & INDIO RIVER199570,100Fair
Pr 22 over Waterway199454,700Fair
Pr 22 42.5 Km over Local Road199454,700Fair
Pr 22 42.9 Km over Pr 2 43.5 Km199454,700Fair
Pr 22 Wbd 33.75 Km over Pr 674199544,750Fair

Frequently asked questions

Are any bridges closed in Vega Baja Municipio, Puerto Rico?

1 bridge of the 23 in Vega Baja Municipio is coded closed to all traffic in the 2025 National Bridge Inventory, and 2 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Vega Baja Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Vega Baja Municipio: no bridges with a component rated 2 (critical) or lower, 3 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Vega Baja Municipio last inspected?

Inspection dates in the 2025 inventory for Vega Baja Municipio run from February 2023 to March 2025. Intervals: 4 on 12 months or less, 19 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Vega Baja Municipio → - all 23, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.