Bridge conditions in Greenville County, South Carolina
636 inventoried bridges · 9 closed · 82 posted · 47 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 636 bridges.
47 of the 636 bridges the federal inventory lists in Greenville County are rated poor; the rest split 351 good and 238 fair.
- 47 of the 636 bridges in Greenville County, South Carolina, are rated in poor condition (7.4%) in the 2025 National Bridge Inventory, as of .
- Greenville County has 9 bridges closed to all traffic and 82 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, 3 bridges dropped into poor condition and 5 bridges improved out of it; 90 bridges had at least one major component rating lowered, 5 were newly closed, 6 newly load-posted.
- Inspection dates on record run from April 2023 to March 2025; 78 bridges over water are coded scour critical.
- 351 bridges (55.2%) are rated good and 238 (37.4%) fair.
- The median Greenville County bridge was built in 1983.
- The busiest poor-rated bridge is I-85 over Trib Laurel Crk (built 1960), carrying about 113,800 vehicles a day.
What this page is: the federal bridge inspection inventory for Greenville County: inspector ratings, closures and load postings as reported by the South Carolina DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 55.2% · Fair 37.4% · Poor 7.4% of 636 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| S-23-978 over Trib-middle Tyger Rv | newly closed; deck 7 to 5; superstructure 7 to 5 | Poor | Poor | 375 |
| S-23-147 over Reedy River | newly closed | Fair | Fair | 5,600 |
| S-23-80 over Reedy River | newly closed | Fair | Fair | 900 |
| C-23-5417 over Richland Creek | newly closed | Fair | Fair | 500 |
| S-23-115 over Middle Tyger River | newly closed | Poor | Poor | 275 |
| US 29 over Reedy River | fair to poor; substructure 5 to 4 | Fair | Poor | 30,500 |
| Sc 14 over Barnes Creek | fair to poor; culvert 5 to 4 | Fair | Poor | 1,750 |
| S-23-125 over Saluda River | load posting removed; fair to poor; substructure 5 to 4 | Fair | Poor | 400 |
| S-23-565 over Trib to Reedy River | newly posted for load; deck 7 to 6; superstructure 7 to 6 | Poor | Poor | 600 |
| S-23-164 over Brushy Creek | newly posted for load; poor to fair; substructure up 4 to 5 | Poor | Fair | 9,600 |
| Sc 20 over Southern RR. | newly posted for load | Good | Good | 5,000 |
| S-23-134 over Middle Tyger River | newly posted for load | Poor | Poor | 1,650 |
| S-23-134 over Trib Middle Tyger River | newly posted for load | Good | Good | 1,650 |
| C-23-3536 over Peters Creek | newly posted for load | Poor | Poor | 150 |
| S-23-51 over Mountain Creek | good to fair; deck 7 to 6; superstructure 7 to 5; substructure 7 to 6 | Good | Fair | 375 |
| L-23-9294 over William Creek | good to fair; substructure 7 to 5 | Good | Fair | 325 |
| L-1019/berry Rd over Cane Creek | good to fair; substructure 7 to 5 | Good | Fair | 150 |
| I-85 over Cpdr_& Private Rd. | good to fair; deck 8 to 6 | Good | Fair | 113,800 |
| US 25 Byp over Swamp Rabbit Trail | good to fair; deck 8 to 7; superstructure 8 to 6; substructure 8 to 7 | Good | Fair | 19,000 |
| S-23-50 over Trib Mountain Ck | good to fair; deck 8 to 7; superstructure 8 to 7; substructure 8 to 6 | Good | Fair | 175 |
| I-185 NB over Ramp Off I-85 SB | good to fair; superstructure 7 to 6; substructure 8 to 7 | Good | Fair | 25,300 |
| Sc 253 over Reedy River | good to fair; culvert 7 to 6 | Good | Fair | 13,300 |
| Sc 418 over Reedy River | good to fair; deck 7 to 6 | Good | Fair | 9,600 |
| Sc 124 over CSX RR | good to fair; deck 7 to 6; superstructure 7 to 6; substructure 7 to 6 | Good | Fair | 8,200 |
| Sc 20 over Scl RR | good to fair; superstructure 7 to 6; substructure 7 to 6 | Good | Fair | 5,000 |
| I-185 Nbl over Ranch Road C- 677 | good to fair; deck 7 to 6; superstructure 8 to 7 | Good | Fair | 4,650 |
| I-185 Sbl over Ranch Road C- 677 | good to fair; superstructure 7 to 6 | Good | Fair | 4,650 |
| Sc 14 over Belue Creek | good to fair; culvert 7 to 6 | Good | Fair | 1,750 |
| C-23-1055 over Brushy Creek | good to fair; substructure 7 to 6 | Good | Fair | 650 |
| S-23-82 over Mountain Creek | good to fair; culvert 7 to 6 | Good | Fair | 350 |
| C-23-538 over Gilder Creek | good to fair; substructure 7 to 6 | Good | Fair | 150 |
| C-23-761 over Horse Pen Ck | good to fair; substructure 7 to 6 | Good | Fair | 150 |
| S-23-23 over I-385 | good to fair; deck 7 to 6; superstructure 8 to 7 | Good | Fair | 150 |
| S-23-97 over Middle Saluda River | superstructure 5 to 4 | Poor | Poor | 700 |
| S-23-671 over Baker Creek | superstructure 7 to 5 | Poor | Poor | 1,450 |
| Sc 291 over Csxt | superstructure 6 to 5 | Fair | Fair | 32,800 |
| S-23-385 over Brushy Creek | deck 6 to 5; superstructure 6 to 5 | Fair | Fair | 2,500 |
| C-23-2516 over Beaverdam CR | substructure 6 to 5 | Fair | Fair | 125 |
| US 29 over Enoree River | deck 8 to 6 | Poor | Poor | 47,300 |
| Sc 186 over Saluda River | deck 7 to 6; superstructure 8 to 6 | Fair | Fair | 1,300 |
Showing the 40 largest of 99 changes (closures, drops into poor and the biggest rating drops first). Every bridge's own page shows its 2024 and 2025 ratings side by side.
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| I-85 NB over Sc 20 S-245 & NS RR | fair to good; deck up 6 to 7 | Fair | Good | 43,600 |
| S-23-941 over I-385 | poor to fair; deck up 4 to 8 | Poor | Fair | 8,300 |
| Sc 101 over Wildcat Creek | fair to good; deck up 7 to 8; superstructure up 7 to 8; substructure up 6 to 8 | Fair | Good | 7,300 |
| S-23-313 over Brushy Creek | poor to fair; substructure up 4 to 5 | Poor | Fair | 4,500 |
| S-23-316 over Huff Creek | poor to fair; culvert up 4 to 5 | Poor | Fair | 1,950 |
| C-23-1026 over Trib to Enoree River | fair to good; deck up 6 to 7; superstructure up 6 to 7; substructure up 6 to 7 | Fair | Good | 150 |
| C-23-1949 over Beaverdam Ck | fair to good; deck up 6 to 7; superstructure up 6 to 7 | Fair | Good | 150 |
5 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 4 structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| S-23-147 over Reedy River | closed | 1975 | 5,600 | June 2023 | Fair |
| S-23-507 over Langston Creek | closed | 1964 | 1,000 | May 2024 | Poor |
| S-23-80 over Reedy River | closed | 1928 | 900 | June 2023 | Fair |
| S-23-40 over Saluda Overflow | closed | 1957 | 650 | April 2024 | Poor |
| S-23-40 over South Saluda Riv | closed | 1957 | 650 | April 2024 | Poor |
| C-23-5417 over Richland Creek | closed | 1965 | 500 | July 2024 | Fair |
| L-23-3199 over Reedy River | closed | 1960 | 500 | June 2024 | Fair |
| S-23-978 over Trib-middle Tyger Rv | closed | 1967 | 375 | May 2024 | Poor |
| S-23-115 over Middle Tyger River | closed | 1969 | 275 | April 2024 | Poor |
| US 29 over Enoree River | posted for load | 1939 | 47,300 | September 2024 | Poor |
| US 29 over Mountain Creek | posted for load | 1939 | 47,300 | September 2024 | Poor |
| S-23-107 over I-385 | posted for load | 1980 | 25,100 | May 2024 | Fair |
| S-23-149 over Brushy Creek | posted for load | 1969 | 14,500 | July 2023 | Fair |
| US 276 over North Saluda River | posted for load | 1940 | 12,800 | April 2024 | Poor |
| Sc 124 over Saluda River | posted for load | 1940 | 11,600 | July 2024 | Poor |
| S-23-164 over Brushy Creek | posted for load | 1994 | 9,600 | June 2024 | Fair |
| Sc 418 over Huff Creek | posted for load | 1962 | 9,600 | September 2024 | Fair |
| S-23-448 over Reedy River | posted for load | 1968 | 9,500 | July 2023 | Fair |
| S-23-447 over Brushy Creek | posted for load | 1981 | 9,100 | April 2024 | Poor |
| S-23-94 over Suber Branch | posted for load | 1963 | 9,000 | June 2023 | Fair |
| S-23-920 over Trib to Mountain Ck | posted for load | 1976 | 8,700 | June 2023 | Fair |
| S-23-920 over Trib to Mountain Crk | posted for load | 1976 | 8,700 | May 2023 | Good |
| S-23-170 over Trib to Reedy River | posted for load | 1958 | 6,700 | May 2023 | Fair |
| S-23-170 over Trib to Reedy River | posted for load | 1958 | 6,700 | May 2023 | Fair |
| S-23-325 over Gilder Creek | posted for load | 1964 | 6,600 | June 2023 | Fair |
| S-23-540 over Trib to Enoree River | posted for load | 1965 | 5,800 | June 2023 | Fair |
| S-23-440 over Gilder Creek | posted for load | 1970 | 5,500 | June 2023 | Good |
| C-23-10 over Reedy River | posted for load | 1910 | 5,200 | July 2024 | Good |
| S-23-333 over Gilder Creek | posted for load | 1962 | 5,000 | June 2023 | Fair |
| Sc 20 over Southern RR. | posted for load | 1950 | 5,000 | August 2024 | Good |
| S-23-313 over Brushy Creek | posted for load | 1962 | 4,500 | June 2024 | Fair |
| S-23-295 over Frohawk Creek | posted for load | 1962 | 4,300 | May 2023 | Fair |
| S-23-958 over Rocky Creek | posted for load | 1968 | 3,400 | August 2024 | Fair |
| C-23-436 over Laurel Creek | posted for load | 1983 | 3,300 | July 2024 | Good |
| S-23-580 over Rocky Creek | posted for load | 1971 | 3,200 | June 2023 | Fair |
| S-23-992 over South Tyger River | posted for load | 1978 | 3,200 | April 2024 | Fair |
| Sc 288 over South Saluda River | posted for load | 1958 | 2,700 | September 2024 | Poor |
| S-23-385 over Brushy Creek | posted for load | 1965 | 2,500 | June 2024 | Fair |
| S-23-310 over Langston Tributary | posted for load | 1965 | 2,300 | April 2024 | Poor |
| S-23-167 over Little Mt CR | posted for load | 1963 | 1,950 | June 2023 | Fair |
| S-23-316 over Grove Creek | posted for load | 1963 | 1,950 | July 2024 | Poor |
| S-23-156 over Enoree River | posted for load | 1972 | 1,850 | May 2024 | Fair |
| S-23-654 over Trib to Rocky Ck | posted for load | 1970 | 1,850 | July 2023 | Fair |
| S-23-384 over Brushy Creek | posted for load | 1965 | 1,700 | June 2023 | Fair |
| S-23-134 over Middle Tyger River | posted for load | 1975 | 1,650 | May 2024 | Poor |
| S-23-134 over Trib Middle Tyger River | posted for load | 1975 | 1,650 | March 2025 | Good |
| S-23-671 over Huff Creek | posted for load | 1967 | 1,500 | July 2023 | Fair |
| C-23-845 over Reedy River | posted for load | 1950 | 1,450 | July 2024 | Fair |
| S-23-562 over Buckhorn Creek | posted for load | 1966 | 1,450 | April 2024 | Fair |
| S-23-562 over Enoree River | posted for load | 1965 | 1,450 | April 2024 | Poor |
| S-23-671 over Baker Creek | posted for load | 1967 | 1,450 | July 2024 | Poor |
| S-23-1967 over Trib to Beaver Dam Ck | posted for load | 1967 | 1,400 | May 2023 | Good |
| S-23-52 over Grove Creek | posted for load | 1970 | 1,400 | July 2023 | Fair |
| S-23-102 over Armstrong Creek | posted for load | 1960 | 1,300 | April 2024 | Poor |
| C-23-81 over Reedy River | posted for load | 1928 | 1,250 | July 2024 | Fair |
| S-23-569 over South Tyger River | posted for load | 1967 | 1,250 | May 2023 | Fair |
| S-23-541 over Grove Creek | posted for load | 1967 | 1,150 | July 2024 | Fair |
| S-23-681 over Trib to Langston Creek | posted for load | 1968 | 1,150 | May 2023 | Good |
| S-23-737 over Trib to Huff Creek | posted for load | 1970 | 1,100 | July 2023 | Fair |
| S-23-143 over Horse Pen Creek | posted for load | 1970 | 1,050 | July 2023 | Fair |
| S-23-341 over Trib to Jamison Mill Ck | posted for load | 1966 | 1,050 | May 2023 | Fair |
| S-23-869 over Trib Enoree River | posted for load | 1967 | 850 | May 2023 | Fair |
| S-23-464 over Beaverdam Creek | posted for load | 1966 | 750 | May 2024 | Fair |
| S-23-633 over Trib Reedy River | posted for load | 1969 | 750 | June 2023 | Fair |
| S-23-97 over Middle Saluda River | posted for load | 1961 | 700 | April 2024 | Poor |
| S-23-450 over Trib to Baker Crk | posted for load | 1963 | 600 | July 2023 | Fair |
| S-23-565 over Trib to Reedy River | posted for load | 1966 | 600 | July 2024 | Poor |
| S-23-342 over Enoree River | posted for load | 1966 | 500 | May 2024 | Fair |
| L-23-478 over Sc 291 | posted for load | 1958 | 475 | April 2024 | Poor |
| C-23-365 over Trib to Brushy Ck | posted for load | 1972 | 400 | July 2024 | Fair |
| L-23-851 over Southern RR | posted for load | 1918 | 250 | July 2024 | Poor |
| S-23-41 over Middle Saluda | posted for load | 1964 | 250 | April 2024 | Poor |
| S-23-560 over Trib to Middle Tyger Riv | posted for load | 1965 | 250 | April 2024 | Poor |
| S-23-90 over South Saluda River | posted for load | 1961 | 250 | April 2023 | Fair |
| S-23-565 over Little Creek | posted for load | 1966 | 200 | May 2024 | Poor |
| C-23-1026 over Trib to Enoree River | posted for load | 1930 | 150 | July 2024 | Good |
| C-23-3536 over Peters Creek | posted for load | 1983 | 150 | July 2024 | Poor |
| C-23-5401 over Richland Creek | posted for load | 1960 | 150 | July 2024 | Fair |
| C-23-6052 over Reedy River | posted for load | 1960 | 150 | June 2024 | Fair |
| C-23-677 over Trib to Reedy CR | posted for load | 1967 | 150 | July 2024 | Fair |
| L-23-3308 over Brushy Creek | posted for load | 1978 | 150 | July 2024 | Fair |
| S-23-101 over South Saluda River | posted for load | 1964 | 150 | April 2024 | Fair |
| S-23-114 over Middle Tyger River | posted for load | 1972 | 150 | April 2024 | Poor |
| S-23-93 over Beaverdam Creek | posted for load | 1938 | 150 | May 2023 | Fair |
| C-23-1934 over Barnes Creek | posted for load | 1971 | 125 | June 2024 | Fair |
| C-23-331 over Beaverdam CR | posted for load | 1994 | 125 | June 2024 | Good |
| C-23-332 over Beaverdam CR | posted for load | 1981 | 125 | June 2024 | Fair |
| C-23-883 over Green Creek | posted for load | 1985 | 125 | June 2024 | Good |
| S-23-318 over Dam at Lake Lanier | posted for load | 1925 | 75 | May 2023 | Poor |
| S-23-42 over N Saluda River Spillway | posted for load | 1956 | 50 | April 2024 | Poor |
| S-23-98 over Beaverdam Creek | posted for load | 1970 | 25 | May 2023 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the South Carolina department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 63 on 12 months or less, 544 on 24 months, 29 on other. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Greenville County is dated March 2025; 3 bridges have an inspection dated in 2025.
Scour critical (item 113): 78 bridges; 1 over water not yet evaluated for scour; 56 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 1 bridge. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| S-23-107 over Laurel Creek | open | 1954 | 27,000 | June 2023 | Fair |
| S-23-149 over Brushy Creek | posted for load | 1969 | 14,500 | July 2023 | Fair |
| S-23-145 over Graze Creek | open | 1989 | 10,300 | July 2023 | Fair |
| S-23-920 over Mountain Creek | open | 1976 | 8,700 | June 2023 | Fair |
| S-23-920 over Trib to Mountain Ck | open | 1976 | 8,700 | June 2023 | Good |
| S-23-920 over Trib to Mountain Ck | posted for load | 1976 | 8,700 | June 2023 | Fair |
| S-23-920 over Trib to Mountain Crk | posted for load | 1976 | 8,700 | May 2023 | Good |
| S-23-170 over Trib to Reedy River | posted for load | 1958 | 6,700 | May 2023 | Fair |
| S-23-170 over Trib to Reedy River | posted for load | 1958 | 6,700 | May 2023 | Fair |
| S-23-325 over Gilder Creek | posted for load | 1964 | 6,600 | June 2023 | Fair |
| S-23-540 over Trib to Enoree River | posted for load | 1965 | 5,800 | June 2023 | Fair |
| S-23-147 over Reedy River | closed | 1975 | 5,600 | June 2023 | Fair |
| S-23-440 over Gilder Creek | posted for load | 1970 | 5,500 | June 2023 | Good |
| S-23-313 over Brushy Creek | posted for load | 1962 | 4,500 | June 2024 | Fair |
| S-23-295 over Frohawk Creek | posted for load | 1962 | 4,300 | May 2023 | Fair |
| Sc 11 over South Saluda River | open | 1970 | 3,700 | August 2024 | Fair |
| S-23-83 over Grove Creek | open | 1976 | 3,500 | July 2023 | Fair |
| S-23-958 over Rocky Creek | posted for load | 1968 | 3,400 | August 2024 | Fair |
| S-23-580 over Rocky Creek | posted for load | 1971 | 3,200 | June 2023 | Fair |
| S-23-106 over Grove Creek | open | 1971 | 3,100 | July 2023 | Fair |
| S-23-88 over Reedy River | open | 1988 | 3,100 | May 2023 | Good |
| S-23-385 over Brushy Creek | posted for load | 1965 | 2,500 | June 2024 | Fair |
| S-23-506 over Reedy River | open | 1974 | 2,500 | May 2023 | Fair |
| S-23-30 over Brushy Creek | open | 1984 | 2,200 | June 2023 | Fair |
| S-23-85 over Saluda River | open | 1979 | 2,200 | June 2023 | Fair |
| S-23-316 over Grove Creek | posted for load | 1963 | 1,950 | July 2024 | Poor |
| S-23-384 over Brushy Creek | posted for load | 1965 | 1,700 | June 2023 | Fair |
| S-23-1967 over Beaver Dam Creek | open | 1968 | 1,650 | May 2023 | Good |
| S-23-344 over Mountain Creek | open | 1966 | 1,550 | June 2023 | Fair |
| S-23-671 over Huff Creek | posted for load | 1967 | 1,500 | July 2023 | Fair |
| S-23-562 over Enoree River | posted for load | 1965 | 1,450 | April 2024 | Poor |
| S-23-671 over Baker Creek | posted for load | 1967 | 1,450 | July 2024 | Poor |
| S-23-1967 over Trib to Beaver Dam Ck | posted for load | 1967 | 1,400 | May 2023 | Good |
| S-23-52 over Grove Creek | posted for load | 1970 | 1,400 | July 2023 | Fair |
| S-23-102 over Armstrong Creek | posted for load | 1960 | 1,300 | April 2024 | Poor |
| Sc 186 over Beaver Dam Creek | open | 1975 | 1,300 | September 2024 | Good |
| S-23-569 over South Tyger River | posted for load | 1967 | 1,250 | May 2023 | Fair |
| S-23-541 over Grove Creek | posted for load | 1967 | 1,150 | July 2024 | Fair |
| S-23-681 over Trib to Langston Creek | posted for load | 1968 | 1,150 | May 2023 | Good |
| S-23-737 over Trib to Huff Creek | posted for load | 1970 | 1,100 | July 2023 | Fair |
| S-23-143 over Horse Pen Creek | posted for load | 1970 | 1,050 | July 2023 | Fair |
| S-23-341 over Trib to Jamison Mill Ck | posted for load | 1966 | 1,050 | May 2023 | Fair |
| S-23-507 over Langston Creek | closed | 1964 | 1,000 | May 2024 | Poor |
| S-23-451 over Trib to Payne Branch | open | 1994 | 900 | July 2023 | Good |
| S-23-869 over Trib Enoree River | posted for load | 1967 | 850 | May 2023 | Fair |
| S-23-157 over Beaverdam Creek | open | 1979 | 800 | May 2023 | Fair |
| S-23-464 over Beaverdam Creek | posted for load | 1966 | 750 | May 2024 | Fair |
| S-23-633 over Trib Reedy River | posted for load | 1969 | 750 | June 2023 | Fair |
| S-23-44 over Trib to Middle Tyger | open | 1983 | 700 | May 2023 | Fair |
| S-23-97 over Middle Saluda River | posted for load | 1961 | 700 | April 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| I-85 over Muddy Ford Rd (s-580) | 1960 | 140,900 | Fair |
| I-85 over Rocky Creek | 2022 | 140,900 | Good |
| I-85 over Brushy Creek | 1962 | 120,200 | Fair |
| I-85 over Enoree River | 2000 | 120,200 | Fair |
| I-85 over U S 276 | 1960 | 118,000 | Fair |
| I-85 over Laurel Creek | 1960 | 113,800 | Fair |
| I-85 over Cpdr_& Private Rd. | 1960 | 113,800 | Fair |
| I-85 over Trib Laurel Crk | 1960 | 113,800 | Poor |
| I-385 over Gilders Creek | 1981 | 87,600 | Fair |
| I-385 over Trib to Richland Creek | 1962 | 71,600 | Fair |
Frequently asked questions
Are any bridges closed in Greenville County, South Carolina?
9 bridges of the 636 in Greenville County are coded closed to all traffic in the 2025 National Bridge Inventory, and 82 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the South Carolina department of transportation.
Have any bridges failed in Greenville County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Greenville County: no bridges with a component rated 2 (critical) or lower, 47 bridges rated poor overall, and 3 bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Greenville County last inspected?
Inspection dates in the 2025 inventory for Greenville County run from April 2023 to March 2025. Intervals: 63 on 12 months or less, 544 on 24 months, 29 on other. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Greenville County → - all 636, busiest first, each with its own condition record.
All of South Carolina: South Carolina bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.