Bridge conditions in Kittitas County, Washington
313 inventoried bridges · 0 closed · 24 posted · 35 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 313 bridges (1 without coordinates in the inventory is not shown).
Of the 313 Kittitas County bridges in the federal inventory, 35 carry a poor rating. That 11.2% share is roughly 2x the national average.
- 35 of the 313 bridges in Kittitas County, Washington, are rated in poor condition (11.2%) in the 2025 National Bridge Inventory, as of .
- Kittitas County has no bridges closed to all traffic and 24 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 1 more bridge is open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 5 bridges dropped into poor condition and 1 bridge improved out of it; 24 bridges had at least one major component rating lowered.
- Inspection dates on record run from July 2021 to December 2024; 14 bridges over water are coded scour critical.
- 133 bridges (42.5%) are rated good and 145 (46.3%) fair.
- The median Kittitas County bridge was built in 1968.
- The busiest poor-rated bridge is I-90 over Coal Creek (built 1956), carrying about 18,069 vehicles a day.
What this page is: the federal bridge inspection inventory for Kittitas County: inspector ratings, closures and load postings as reported by the Washington DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 42.5% · Fair 46.3% · Poor 11.2% of 313 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| I-90 over Dry Creek | fair to poor; deck 6 to 3 | Fair | Poor | 15,974 |
| I-90 over Dry Creek | fair to poor; deck 5 to 3 | Fair | Poor | 15,974 |
| I-82 over SR 821 Whipple Wasteway | fair to poor; superstructure 6 to 4 | Fair | Poor | 9,791 |
| I-90 over Highline Canal | fair to poor; deck 5 to 4 | Fair | Poor | 14,717 |
| University Way over B.n. Railroad | fair to poor; superstructure 5 to 4 | Fair | Poor | 8,962 |
| E-n Ramp over I-90 | good to fair; deck 7 to 6 | Good | Fair | 3,181 |
| I-90 over Taneum CR | deck 4 to 3 | Poor | Poor | 14,959 |
| I-82 over Burbank Creek | superstructure 5 to 4 | Poor | Poor | 10,035 |
| I-90 over Coal CR | culvert 6 to 5 | Fair | Fair | 18,048 |
| I-90 over W Nelson Siding Rd | substructure 6 to 5 | Fair | Fair | 16,598 |
| I-82 over Burbank Creek | deck 6 to 5 | Fair | Fair | 10,035 |
| Canyon Road over Wilson Creek | superstructure 6 to 5; deck up 6 to 7 | Fair | Fair | 4,692 |
| Old Hwy 10 over Flood Channel | substructure 6 to 5; deck up 6 to 8 | Fair | Fair | 2,661 |
| Elk Heights over I-90 | substructure 6 to 5 | Fair | Fair | 321 |
| Denmark Road over Parke Creek | superstructure 6 to 5 | Fair | Fair | 311 |
| Mohar Road over Hiline Canal | superstructure 6 to 5 | Fair | Fair | 241 |
| L Green Canyon Rd over Hiline Canal | substructure 6 to 5 | Fair | Fair | 138 |
| Umptanum Road over Wilson Creek | deck 7 to 6 | Fair | Fair | 5,039 |
| Road over Standup Creek | superstructure 7 to 6 | Fair | Fair | 75 |
| Road over Cabin Creek | superstructure 7 to 6 | Fair | Fair | 75 |
| Road over Fortune Creek | superstructure 7 to 6 | Fair | Fair | 50 |
| Road over Stafford Creek | superstructure 7 to 6 | Fair | Fair | 30 |
| I-90 WB over Noble Creek | deck 8 to 7 | Good | Good | 18,069 |
| I-90 Westbound over Kachess River | deck 8 to 7 | Good | Good | 17,108 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| I-90 over Wilson Creek | poor to fair; superstructure up 4 to 5 | Poor | Fair | 15,658 |
| Anderson Rd over Mercer Creek | fair to good; culvert up 6 to 7 | Fair | Good | 2,648 |
| Third Avenue over Town Ditch | fair to good; substructure up 5 to 7 | Fair | Good | 631 |
| Thorp Prairie Road over Hiline Canal | fair to good; superstructure up 7 to 8; substructure up 5 to 7 | Fair | Good | 275 |
| Bar 14 Road over Hiline Canal | fair to good; substructure up 5 to 7 | Fair | Good | 154 |
| South Ferguson Rd over Parke Creek | fair to good; substructure up 6 to 7 | Fair | Good | 95 |
| Hayward Road over Hiline Canal | fair to good; deck up 6 to 7; superstructure up 6 to 7; substructure up 6 to 7 | Fair | Good | 76 |
| No Data Entered over Cabin Creek | fair to good; culvert up 6 to 7 | Fair | Good | 5 |
7 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 2 structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| University Way over Currier Creek | posted for load | 1966 | 7,845 | March 2023 | Fair |
| SR 903 over Roslyn CR | posted for load | 1938 | 5,966 | August 2023 | Fair |
| South Thorp Hwy over Yakima River | posted for load | 1967 | 4,937 | November 2023 | Fair |
| Canyon Road over Wilson Creek | posted for load | 1930 | 4,692 | September 2024 | Fair |
| Old Highway 10 over Currier Creek | posted for load | 1930 | 2,216 | September 2023 | Fair |
| SR 821 over Wilson CR | posted for load | 1947 | 1,181 | August 2024 | Fair |
| Westside Rd over Hiline Canal | posted for load | 1930 | 1,028 | October 2024 | Fair |
| No. 81 Road over Cooke Creek | posted for load | 1940 | 1,018 | November 2024 | Good |
| South Thorp Hwy over Westside Ditch | posted, other restriction | 1926 | 959 | November 2024 | Fair |
| SR 906 over Hyak Creek | posted for load | 1928 | 823 | September 2024 | Fair |
| Railroad Street over Yakima River | posted for load | 1937 | 537 | September 2023 | Fair |
| Badger Pkt Road over Parke Creek | posted for load | 1955 | 507 | November 2023 | Fair |
| Weaver Road over Westside Ditch | posted for load | 1993 | 386 | October 2023 | Good |
| Tjossem Road over Town Ditch | posted, other restriction | 1944 | 336 | November 2023 | Fair |
| Red Bridge Rd over Teanaway River | posted for load | 1966 | 331 | September 2023 | Fair |
| Thomas Road over Naneum Creek | posted for load | 1955 | 308 | November 2024 | Fair |
| Fairview Road over Hiline Canal | posted for load | 1931 | 249 | October 2023 | Fair |
| Robbins Rd over Hiline Canal | posted for load | 1955 | 218 | October 2023 | Fair |
| Schnebly Road over Hiline Canal | posted for load | 1955 | 103 | October 2024 | Fair |
| Ross Road over Turbine Canal | posted for load | 1975 | 90 | November 2024 | Fair |
| Clarke Road over Dry Creek | posted for load | 1960 | 58 | September 2023 | Fair |
| Potts Road over Reecer Creek | posted for load | 1991 | 37 | March 2023 | Good |
| Smithson Rd over Hiline Canal | posted for load | 1931 | 24 | October 2024 | Fair |
| Ross Road over Turbine Canal | posted for load | 1991 | 22 | October 2023 | Poor |
| I-90 EB Temp Align over W Sparks Rd | open on a temporary structure | 2020 | 17,108 | May 2024 | Good |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Washington department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 4 on 12 months or less, 285 on 24 months, 24 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Kittitas County is dated December 2024; 144 bridges have an inspection dated in 2024.
Scour critical (item 113): 14 bridges; 4 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 7 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| I-90 over Yakima River | open | 1917 | 17,681 | September 2023 | Fair |
| I-90 over Yakima River | open | 1962 | 17,681 | September 2023 | Fair |
| I-90 over Kachess River | open | 1958 | 17,108 | February 2024 | Poor |
| I-90 over Cle Elum River | open | 1949 | 17,089 | September 2024 | Fair |
| I-90 over Cle Elum River | open | 1962 | 17,089 | September 2024 | Fair |
| I-90 over Yakima River | open | 1959 | 16,667 | September 2023 | Poor |
| I-90 over Yakima River | open | 1959 | 16,667 | September 2023 | Poor |
| I-90 over Dry Creek | open | 1967 | 15,974 | June 2024 | Poor |
| I-90 over Columbia River Vantage | open | 1962 | 9,077 | June 2024 | Fair |
| Umptanum Road over Yakima River | open | 1971 | 6,083 | November 2023 | Fair |
| SR 970 over Teanaway R | open | 1977 | 5,741 | August 2023 | Fair |
| SR 821 over Lower Wilson Creek | open | 1932 | 1,474 | September 2023 | Fair |
| SR 10 over Teanaway River | open | 1930 | 1,338 | September 2024 | Poor |
| SR 821 over Wilson CR | posted for load | 1947 | 1,181 | August 2024 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| I-90 over Coal Creek | 1928 | 18,069 | Fair |
| I-90 over Coal Creek | 1956 | 18,069 | Poor |
| I-90 over Animal Crossing | 2010 | 18,069 | Good |
| I-90 over Animal Crossing | 2012 | 18,069 | Good |
| I-90 over Gold Creek | 2011 | 18,069 | Fair |
| I-90 over Gold Creek | 2012 | 18,069 | Good |
| I-90 over Rocky Run Creek | 2011 | 18,069 | Good |
| I-90 over Rocky Run Creek | 2012 | 18,069 | Good |
| I-90 over Wolfe Creek | 2011 | 18,069 | Good |
| I-90 over Wolfe Creek | 2012 | 18,069 | Good |
Frequently asked questions
Are any bridges closed in Kittitas County, Washington?
No bridges of the 313 in Kittitas County are coded closed to all traffic in the 2025 National Bridge Inventory, and 24 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Washington department of transportation.
Have any bridges failed in Kittitas County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Kittitas County: no bridges with a component rated 2 (critical) or lower, 35 bridges rated poor overall, and 5 bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Kittitas County last inspected?
Inspection dates in the 2025 inventory for Kittitas County run from July 2021 to December 2024. Intervals: 4 on 12 months or less, 285 on 24 months, 24 on 48 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Kittitas County → - all 313, busiest first, each with its own condition record.
All of Washington: Washington bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.