BridgeReportCard
Home › Washington › Klickitat County

Bridge conditions in Klickitat County, Washington

91 inventoried bridges · 0 closed · 7 posted · 6 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 91 bridges.

6 of the 91 bridges the federal inventory lists in Klickitat County are rated poor; the rest split 25 good and 60 fair.

What this page is: the federal bridge inspection inventory for Klickitat County: inspector ratings, closures and load postings as reported by the Washington DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 27.5% · Fair 65.9% · Poor 6.6% of 91 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

1
dropped into poor
since 2024
2
improved out of poor
since 2024
3
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Seventh Street over Burlington Northern RRfair to poor; superstructure 5 to 4; deck up 6 to 7FairPoor99
SR 141 over White Salmon Rsubstructure 7 to 5FairFair3,250
Cedar Valley Road over Bowman Creeksuperstructure 7 to 6; deck up 6 to 7; substructure up 5 to 7FairFair5

Bridges that improved

BridgeWhat changed20242025Vehicles/day
US 197 over Columbia R Sp & S Rypoor to fair; deck up 4 to 7; superstructure up 5 to 6PoorFair6,795
BZ Glenwood Hwy over Outlet Creekpoor to fair; superstructure up 5 to 7; substructure up 4 to 6PoorFair217
Husum St over White Salmon Riverfair to good; deck up 6 to 7; superstructure up 6 to 7; substructure up 6 to 7FairGood160
Old Creamery Rd over Trout Creekfair to good; deck up 6 to 7; superstructure up 6 to 7FairGood98

1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
E Marina Way over Columbia Riverposted for load192414,900July 2022Fair
Pipeline Road over Little Klickitat Riverposted for load19651,200July 2023Fair
Woodland Road over Little Klickitat Riverposted for load1980561July 2023Fair
Northwestern Lk Rd over White Salmon Riverposted, other restriction1957552September 2024Fair
Glenwood Road over White Salmon Riverposted for load1957278September 2024Fair
Goldendale Hwy. over Outlet Creekposted for load1970234September 2024Fair
Middle Road over Pine Creekposted for load195994July 2023Fair

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Washington department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 86 on 24 months, 5 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Klickitat County is dated September 2024; 42 bridges have an inspection dated in 2024.

Scour critical (item 113): 7 bridges; 3 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 6 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
US 97 over Swale Creekopen19606,760July 2023Poor
US 97 over Columbia Riveropen19626,212July 2024Fair
US 97 over Little Klickitat Riveropen19565,532May 2024Fair
US 97 over Kusshi CRopen19454,013April 2024Poor
SR 141 over Rattlesnake Creekopen19473,793March 2023Good
Centerville Hwy. over Swale Creekopen1995244July 2023Fair
Cameron Road over Swale Creekopen199583July 2023Fair

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
US 97 over Swale Creek19606,760Poor
US 97 over Bickleton Rd19725,310Poor
US 97 over Kusshi CR19454,013Poor
SR 14 over Alder Creek1965936Poor
Project and Public over the Dalles Dam1956100Poor
Seventh Street over Burlington Northern RR199499Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
E Marina Way over Columbia River192414,900Fair
US 197 over Columbia R Sp & S Ry19546,795Fair
US 97 over Swale Creek19606,760Poor
US 97 over Columbia River19626,212Fair
US 97 over BNSF RR19626,122Good
SR 14 over White Salmon River19715,853Good
US 97 over Little Klickitat River19565,532Fair
US 97 over Bickleton Rd19725,310Poor
SR 97 over Butler Creek20124,827Good
SR 14 over Klickitat River19334,529Fair

Frequently asked questions

Are any bridges closed in Klickitat County, Washington?

No bridges of the 91 in Klickitat County are coded closed to all traffic in the 2025 National Bridge Inventory, and 7 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Washington department of transportation.

Have any bridges failed in Klickitat County?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Klickitat County: no bridges with a component rated 2 (critical) or lower, 6 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.

When were bridges in Klickitat County last inspected?

Inspection dates in the 2025 inventory for Klickitat County run from July 2021 to September 2024. Intervals: 86 on 24 months, 5 on 48 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Klickitat County → - all 91, busiest first, each with its own condition record.

All of Washington: Washington bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.