Bridge conditions in Klickitat County, Washington
91 inventoried bridges · 0 closed · 7 posted · 6 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 91 bridges.
6 of the 91 bridges the federal inventory lists in Klickitat County are rated poor; the rest split 25 good and 60 fair.
- 6 of the 91 bridges in Klickitat County, Washington, are rated in poor condition (6.6%) in the 2025 National Bridge Inventory, as of .
- Klickitat County has no bridges closed to all traffic and 7 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, 1 bridge dropped into poor condition and 2 bridges improved out of it; 3 bridges had at least one major component rating lowered.
- Inspection dates on record run from July 2021 to September 2024; 7 bridges over water are coded scour critical.
- 25 bridges (27.5%) are rated good and 60 (65.9%) fair.
- The median Klickitat County bridge was built in 1977.
- The busiest poor-rated bridge is US 97 over Swale Creek (built 1960), carrying about 6,760 vehicles a day.
What this page is: the federal bridge inspection inventory for Klickitat County: inspector ratings, closures and load postings as reported by the Washington DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 27.5% · Fair 65.9% · Poor 6.6% of 91 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Seventh Street over Burlington Northern RR | fair to poor; superstructure 5 to 4; deck up 6 to 7 | Fair | Poor | 99 |
| SR 141 over White Salmon R | substructure 7 to 5 | Fair | Fair | 3,250 |
| Cedar Valley Road over Bowman Creek | superstructure 7 to 6; deck up 6 to 7; substructure up 5 to 7 | Fair | Fair | 5 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| US 197 over Columbia R Sp & S Ry | poor to fair; deck up 4 to 7; superstructure up 5 to 6 | Poor | Fair | 6,795 |
| BZ Glenwood Hwy over Outlet Creek | poor to fair; superstructure up 5 to 7; substructure up 4 to 6 | Poor | Fair | 217 |
| Husum St over White Salmon River | fair to good; deck up 6 to 7; superstructure up 6 to 7; substructure up 6 to 7 | Fair | Good | 160 |
| Old Creamery Rd over Trout Creek | fair to good; deck up 6 to 7; superstructure up 6 to 7 | Fair | Good | 98 |
1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| E Marina Way over Columbia River | posted for load | 1924 | 14,900 | July 2022 | Fair |
| Pipeline Road over Little Klickitat River | posted for load | 1965 | 1,200 | July 2023 | Fair |
| Woodland Road over Little Klickitat River | posted for load | 1980 | 561 | July 2023 | Fair |
| Northwestern Lk Rd over White Salmon River | posted, other restriction | 1957 | 552 | September 2024 | Fair |
| Glenwood Road over White Salmon River | posted for load | 1957 | 278 | September 2024 | Fair |
| Goldendale Hwy. over Outlet Creek | posted for load | 1970 | 234 | September 2024 | Fair |
| Middle Road over Pine Creek | posted for load | 1959 | 94 | July 2023 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Washington department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 86 on 24 months, 5 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Klickitat County is dated September 2024; 42 bridges have an inspection dated in 2024.
Scour critical (item 113): 7 bridges; 3 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 6 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| US 97 over Swale Creek | open | 1960 | 6,760 | July 2023 | Poor |
| US 97 over Columbia River | open | 1962 | 6,212 | July 2024 | Fair |
| US 97 over Little Klickitat River | open | 1956 | 5,532 | May 2024 | Fair |
| US 97 over Kusshi CR | open | 1945 | 4,013 | April 2024 | Poor |
| SR 141 over Rattlesnake Creek | open | 1947 | 3,793 | March 2023 | Good |
| Centerville Hwy. over Swale Creek | open | 1995 | 244 | July 2023 | Fair |
| Cameron Road over Swale Creek | open | 1995 | 83 | July 2023 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| US 97 over Swale Creek | 1960 | 6,760 | Poor |
| US 97 over Bickleton Rd | 1972 | 5,310 | Poor |
| US 97 over Kusshi CR | 1945 | 4,013 | Poor |
| SR 14 over Alder Creek | 1965 | 936 | Poor |
| Project and Public over the Dalles Dam | 1956 | 100 | Poor |
| Seventh Street over Burlington Northern RR | 1994 | 99 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| E Marina Way over Columbia River | 1924 | 14,900 | Fair |
| US 197 over Columbia R Sp & S Ry | 1954 | 6,795 | Fair |
| US 97 over Swale Creek | 1960 | 6,760 | Poor |
| US 97 over Columbia River | 1962 | 6,212 | Fair |
| US 97 over BNSF RR | 1962 | 6,122 | Good |
| SR 14 over White Salmon River | 1971 | 5,853 | Good |
| US 97 over Little Klickitat River | 1956 | 5,532 | Fair |
| US 97 over Bickleton Rd | 1972 | 5,310 | Poor |
| SR 97 over Butler Creek | 2012 | 4,827 | Good |
| SR 14 over Klickitat River | 1933 | 4,529 | Fair |
Frequently asked questions
Are any bridges closed in Klickitat County, Washington?
No bridges of the 91 in Klickitat County are coded closed to all traffic in the 2025 National Bridge Inventory, and 7 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Washington department of transportation.
Have any bridges failed in Klickitat County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Klickitat County: no bridges with a component rated 2 (critical) or lower, 6 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.
When were bridges in Klickitat County last inspected?
Inspection dates in the 2025 inventory for Klickitat County run from July 2021 to September 2024. Intervals: 86 on 24 months, 5 on 48 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Klickitat County → - all 91, busiest first, each with its own condition record.
All of Washington: Washington bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.