Bridge conditions in Pacific County, Washington
120 inventoried bridges · 1 closed · 15 posted · 9 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 120 bridges.
The federal inventory lists 120 bridges in Pacific County: 68 rated good, 43 fair, and 9 poor.
- 9 of the 120 bridges in Pacific County, Washington, are rated in poor condition (7.5%) in the 2025 National Bridge Inventory, as of .
- Pacific County has 1 bridge closed to all traffic and 15 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 1 more bridge is open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 2 bridges dropped into poor condition and no bridges improved out of it; 13 bridges had at least one major component rating lowered, 1 was newly closed.
- Inspection dates on record run from October 2019 to September 2024; 11 bridges over water are coded scour critical.
- 68 bridges (56.7%) are rated good and 43 (35.8%) fair.
- The median Pacific County bridge was built in 1980.
- The busiest poor-rated bridge is US 101 over Columbia R (built 1966), carrying about 23,300 vehicles a day.
What this page is: the federal bridge inspection inventory for Pacific County: inspector ratings, closures and load postings as reported by the Washington DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 56.7% · Fair 35.8% · Poor 7.5% of 120 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Community Drive over Surfside Est. Lagoon | newly closed; substructure 6 to 4; deck up 4 to 6; superstructure up 6 to 7 | Poor | Poor | 87 |
| US 101 over Teal Slough | fair to poor; deck 6 to 4 | Fair | Poor | 1,911 |
| US 101 over Columbia R | fair to poor; substructure 5 to 4 | Fair | Poor | 23,300 |
| Knappton Road over Davis Creek | superstructure 4 to 3 | Poor | Poor | 79 |
| SR 401 over Naselle River Overflow | superstructure 6 to 4 | Poor | Poor | 2,839 |
| US 101 over Columbia R | superstructure 6 to 5; deck up 5 to 6 | Fair | Fair | 22,526 |
| Trask Road over So Fork Palix River | superstructure 6 to 5; substructure 6 to 5 | Fair | Fair | 159 |
| US 101 over Half Bridge | superstructure 7 to 6 | Fair | Fair | 6,961 |
| US 101 over Jorgenson Slough | deck 7 to 6 | Fair | Fair | 2,815 |
| US 101 over Middle Nemah River | superstructure 8 to 7 | Good | Good | 2,815 |
| SR 105 over Smith Creek | superstructure 8 to 7 | Good | Good | 1,099 |
| Wilson Creek Road over Whitcomb Creek | substructure 8 to 7 | Good | Good | 98 |
| Hanen Road over Willapa River | superstructure 8 to 7 | Good | Good | 17 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Parpala Road over Ellsworth Slough | load posting removed | Good | Good | 562 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Community Drive over Surfside Est. Lagoon | closed | 1967 | 87 | June 2024 | Poor |
| So Valley Road over So Fork Naselle River | posted for load | 1965 | 506 | June 2024 | Fair |
| 2ND Street over Slough | posted for load | 1981 | 457 | June 2024 | Fair |
| Camp One Road over North Fork Willapa River | posted for load | 1984 | 375 | June 2024 | Fair |
| North River Road over North River | posted for load | 1959 | 204 | June 2024 | Fair |
| North Valley Road over Naselle River | posted for load | 1963 | 152 | June 2024 | Fair |
| Menlo-so.fork Road over Rue Creek | posted for load | 1960 | 138 | June 2024 | Good |
| North River Valley over Fall River | posted for load | 1953 | 128 | June 2024 | Fair |
| Falls Creek Road over Willapa River | posted for load | 1949 | 87 | June 2024 | Fair |
| Knappton Road over Davis Creek | posted for load | 1963 | 79 | June 2024 | Poor |
| Tienhaara Road over Salmon Creek | posted for load | 1980 | 74 | June 2024 | Fair |
| Elk Prairie Road over Willapa River North Fork | posted for load | 1964 | 65 | June 2024 | Good |
| Larkin Road over Drainage Ditch | posted for load | 1986 | 58 | June 2024 | Good |
| Lagergren-sunshine over South Nemah River | posted for load | 1959 | 50 | June 2024 | Fair |
| Elk Prairie Road over North Fork Willapa River | posted for load | 1964 | 44 | June 2024 | Good |
| So Bend-palix Road over Niawiakum River | posted for load | 1965 | 39 | June 2024 | Poor |
| Parpala Road over Ellsworth Slough | open, posting recommended | 1969 | 562 | June 2024 | Good |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Washington department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 2 on 12 months or less, 112 on 24 months, 6 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Pacific County is dated September 2024; 58 bridges have an inspection dated in 2024.
Scour critical (item 113): 11 bridges; 4 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 3 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| US 101 over Elkhorn CR | open | 1929 | 4,478 | May 2023 | Fair |
| US 101 over Smith Creek | open | 1929 | 4,478 | May 2023 | Fair |
| SR 401 over Naselle R | open | 1953 | 2,839 | August 2023 | Good |
| SR 6 over Fern Creek | open | 1962 | 1,600 | April 2024 | Good |
| Raymd/southbend Rd over Skidmore Slough | open | 2010 | 218 | June 2024 | Fair |
| Mill Creek Road over Mill Creek | open | 1995 | 143 | June 2023 | Good |
| North River Valley over Fall River | posted for load | 1953 | 128 | June 2024 | Fair |
| Tienhaara Road over Salmon Creek | posted for load | 1980 | 74 | June 2024 | Fair |
| Nyberg Road over So Fork Naselle River | open | 1996 | 56 | June 2023 | Good |
| Hanen Road over Willapa River | open | 1989 | 17 | June 2024 | Good |
| Dixon Road over Clearwater Creek | open | 1992 | 16 | June 2023 | Good |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| US 101 over Columbia R | 1966 | 23,300 | Poor |
| US 101 over S Fk Willapa River | 1966 | 10,253 | Poor |
| SR 6 over Creek | 1947 | 2,879 | Poor |
| SR 401 over Naselle River Overflow | 1964 | 2,839 | Poor |
| US 101 over Greenhead Slough | 1934 | 1,911 | Poor |
| US 101 over Teal Slough | 1934 | 1,911 | Poor |
| Community Drive over Surfside Est. Lagoon | 1967 | 87 | Poor |
| Knappton Road over Davis Creek | 1963 | 79 | Poor |
| So Bend-palix Road over Niawiakum River | 1965 | 39 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| US 101 over Columbia R | 1966 | 23,300 | Poor |
| US 101 over Columbia R | 1966 | 22,526 | Fair |
| US 101 over S Fk Willapa River | 1966 | 10,253 | Poor |
| US 101 over N Fk Willapa | 1992 | 8,151 | Fair |
| US 101 over Skidmore Slough | 1980 | 8,012 | Good |
| US 101 over Chinook R | 1927 | 7,256 | Fair |
| US 101 over Wallicut River | 1979 | 7,256 | Good |
| US 101 over Half Bridge | 1963 | 6,961 | Fair |
| US 101 over Columbia R Megler | 1965 | 6,800 | Good |
| US 101 over Columbia R Megler | 1966 | 6,800 | Fair |
Frequently asked questions
Are any bridges closed in Pacific County, Washington?
1 bridge of the 120 in Pacific County is coded closed to all traffic in the 2025 National Bridge Inventory, and 15 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Washington department of transportation.
Have any bridges failed in Pacific County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Pacific County: no bridges with a component rated 2 (critical) or lower, 9 bridges rated poor overall, and 2 bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Pacific County last inspected?
Inspection dates in the 2025 inventory for Pacific County run from October 2019 to September 2024. Intervals: 2 on 12 months or less, 112 on 24 months, 6 on 48 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Pacific County → - all 120, busiest first, each with its own condition record.
All of Washington: Washington bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.