Bridge conditions in Spokane County, Washington
309 inventoried bridges · 0 closed · 22 posted · 21 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 309 bridges.
Spokane County tracks close to typical: 21 of its 309 inventoried bridges (6.8%) are rated poor, against a national rate of about 7%.
- 21 of the 309 bridges in Spokane County, Washington, are rated in poor condition (6.8%) in the 2025 National Bridge Inventory, as of .
- Spokane County has no bridges closed to all traffic and 22 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, 5 bridges dropped into poor condition and 5 bridges improved out of it; 22 bridges had at least one major component rating lowered.
- Inspection dates on record run from May 2021 to December 2024; 8 bridges over water are coded scour critical.
- 156 bridges (50.5%) are rated good and 132 (42.7%) fair.
- The median Spokane County bridge was built in 1973.
- The busiest poor-rated bridge is Sullivan Rd over SR 290 (trent Ave) (built 1960), carrying about 21,500 vehicles a day.
What this page is: the federal bridge inspection inventory for Spokane County: inspector ratings, closures and load postings as reported by the Washington DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 50.5% · Fair 42.7% · Poor 6.8% of 309 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Greene Street over Spokane River Local Rds | good to poor; deck 7 to 4; superstructure 7 to 6 | Good | Poor | 17,869 |
| Sprague Avenue over Sprague Way SB | fair to poor; deck 5 to 4; superstructure 6 to 4 | Fair | Poor | 8,658 |
| 1ST Avenue over Maple Street | fair to poor; deck 6 to 4; superstructure 6 to 4 | Fair | Poor | 6,261 |
| Riverside Avenue over Maple Street | fair to poor; deck 6 to 4; superstructure 6 to 4 | Fair | Poor | 6,261 |
| Thor St over I-90 | fair to poor; deck 5 to 4 | Fair | Poor | 19,798 |
| Monroe Street over Spokane River | good to fair; deck 8 to 6; superstructure 8 to 6; substructure 8 to 7 | Good | Fair | 18,453 |
| I-90 over Np Ry | good to fair; deck 8 to 6 | Good | Fair | 11,409 |
| Havana Street over BNSF Railway | good to fair; deck 8 to 6; superstructure 8 to 7; substructure 8 to 7 | Good | Fair | 6,335 |
| Dartford Drive over Little Spokane River | good to fair; deck 8 to 6 | Good | Fair | 1,908 |
| US 2 over W-w Ramp | good to fair; deck 7 to 6 | Good | Fair | 15,318 |
| Stevens Street over S. Channel Spokane River | good to fair; deck 7 to 6 | Good | Fair | 8,287 |
| Sunset Highway over Geiger Boulevard | good to fair; superstructure 7 to 6 | Good | Fair | 2,964 |
| Hatch Road over Latah Creek | superstructure 8 to 6; substructure up 6 to 8 | Fair | Fair | 9,669 |
| Freya Way over Sirr (UPRR) | deck 7 to 6 | Fair | Fair | 28,557 |
| US 2 over Deep Creek | deck 7 to 6 | Fair | Fair | 7,571 |
| Broadway Avenue over Maple Street | substructure 7 to 6 | Fair | Fair | 4,177 |
| US 195 over Np Ry | poor to fair; deck 7 to 6; superstructure up 4 to 5 | Poor | Fair | 3,616 |
| Freya Street over BNSF Railway | deck 8 to 7; superstructure 8 to 7; substructure 8 to 7 | Good | Good | 30,397 |
| Northwest Blvd over Cso Tank #6 Shadle Bluff | culvert 8 to 7 | Good | Good | 11,844 |
| Spokane Falls Blvd over Spokane River | deck 8 to 7 | Good | Good | 9,582 |
| Mission Ave over Evergreen Rd | deck 8 to 7 | Good | Good | 6,500 |
| Forker Road over Drainage | superstructure 8 to 7 | Good | Good | 885 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Maple Street over Spokane River | poor to fair; deck up 4 to 7 | Poor | Fair | 39,775 |
| Sullivan Road (NB) over Union Pacific RR | fair to good; deck up 6 to 7; superstructure up 6 to 7; substructure up 6 to 7 | Fair | Good | 28,100 |
| Dishman-mica Rd over Chester Creek | fair to good; substructure up 6 to 7 | Fair | Good | 5,800 |
| Post Street over Spokane River | reopened; poor to good; deck up 3 to 8; superstructure up 2 to 8; substructure up 3 to 8 | Poor | Good | 2,423 |
| Cheney-spokane Rd over Up&bn RR & Marshall CR | load posting removed; superstructure up 5 to 6 | Poor | Poor | 2,238 |
| Deer Park-milan Rd over Little Spokane River | poor to fair; superstructure up 4 to 5 | Poor | Fair | 2,046 |
| Chattaroy Road over Little Spokane River | poor to fair; deck up 5 to 6; superstructure up 4 to 5 | Poor | Fair | 1,387 |
4 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 2 structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Maple Street over Spokane River | posted for load | 1958 | 39,775 | May 2024 | Fair |
| Argonne Rd over I-90 | posted for load | 1954 | 17,996 | May 2023 | Fair |
| Sunset Boulevard over Latah Creek | posted for load | 1913 | 14,995 | September 2023 | Poor |
| SR 904 over I-90 | posted for load | 1966 | 8,606 | October 2023 | Fair |
| US 195 over I-90 | posted for load | 1963 | 5,749 | October 2023 | Fair |
| US 195 over I-90 | posted for load | 1963 | 5,749 | October 2023 | Fair |
| SR 278 over Rock Creek | posted for load | 1950 | 2,518 | September 2023 | Fair |
| Colbert Road over Little Spokane River | posted for load | 1953 | 2,306 | September 2024 | Poor |
| Deer Park-milan Rd over Little Spokane River | posted for load | 1954 | 2,046 | July 2024 | Fair |
| SR 206 over Deadman CR No 1 | posted for load | 1954 | 1,502 | August 2024 | Fair |
| Chattaroy Road over Little Spokane River | posted for load | 1953 | 1,387 | September 2024 | Fair |
| Little Spokane Dr. over Little Spokane River | posted for load | 1951 | 1,109 | September 2023 | Poor |
| Old State ROUTE195 over N Pine Creek Wir RR | posted for load | 1929 | 888 | June 2024 | Poor |
| Old SR-195 over Spring Valley Creek | posted for load | 1930 | 506 | June 2023 | Fair |
| Wells Road over Sanders Creek | posted for load | 1953 | 282 | August 2023 | Fair |
| Coulee-hite Road over Coulee Creek | posted for load | 1923 | 266 | May 2023 | Fair |
| Anderson Road over UPRR Tracks | posted for load | 1971 | 221 | August 2024 | Fair |
| Jay Avenue over Drainage | posted for load | 1963 | 159 | May 2023 | Fair |
| Gordon Road over Deep Creek | posted for load | 1981 | 155 | June 2023 | Fair |
| West Branch Road over WB Little Spokane River | posted for load | 1915 | 98 | August 2023 | Fair |
| Chatcolet Road over Rose Creek | posted for load | 1988 | 48 | July 2023 | Good |
| Roberts Road over Latah Creek | posted for load | 1992 | 41 | July 2023 | Good |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Washington department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 5 on 12 months or less, 289 on 24 months, 15 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Spokane County is dated December 2024; 137 bridges have an inspection dated in 2024.
Scour critical (item 113): 8 bridges; 11 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 1 bridge. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Sullivan Road (NB) over Spokane River | open | 1973 | 28,100 | October 2023 | Fair |
| Wandermere Road over Little Spokane River | open | 1953 | 5,394 | September 2023 | Fair |
| Seven Mile Road over Deep Creek | open | 1958 | 2,901 | September 2023 | Fair |
| Little Spokane Dr. over Little Spokane River | open | 1961 | 2,456 | September 2023 | Fair |
| Colbert Road over Little Spokane River | posted for load | 1953 | 2,306 | September 2024 | Poor |
| Coulee-hite Road over Coulee Creek | posted for load | 1923 | 266 | May 2023 | Fair |
| Crescent Road over Dragoon Creek | open | 1986 | 92 | September 2023 | Fair |
| Garfield Road over Deep Creek | open | 1987 | 77 | June 2023 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Sullivan Rd over SR 290 (trent Ave) | 1960 | 21,500 | Poor |
| Thor St over I-90 | 1957 | 19,798 | Poor |
| Greene Street over Spokane River Local Rds | 1955 | 17,869 | Poor |
| Sunset Boulevard over Latah Creek | 1913 | 14,995 | Poor |
| I-90 over Medical Lake Rd | 1966 | 11,409 | Poor |
| Sprague Avenue over Sprague Way SB | 1954 | 8,658 | Poor |
| SR 290 over 2ND Ave | 1974 | 7,681 | Poor |
| I-90 E-e Ramp over 3RD Ave & I-90 | 1970 | 7,572 | Poor |
| 1ST Avenue over Maple Street | 1958 | 6,261 | Poor |
| Riverside Avenue over Maple Street | 1958 | 6,261 | Poor |
| Arthur St over I-90 | 1970 | 6,150 | Poor |
| SR 902 over I-90 | 1965 | 6,040 | Poor |
| SR 27 over Rock Creek | 1957 | 5,713 | Poor |
| Colbert Road over Little Spokane River | 1953 | 2,306 | Poor |
| Cheney-spokane Rd over Up&bn RR & Marshall CR | 1949 | 2,238 | Poor |
| SR 902 over I-90 | 1966 | 1,759 | Poor |
| Lindeke St over I-90 | 1962 | 1,550 | Poor |
| Little Spokane Dr. over Little Spokane River | 1951 | 1,109 | Poor |
| SR 904 over I-90 | 1966 | 958 | Poor |
| Old State ROUTE195 over N Pine Creek Wir RR | 1929 | 888 | Poor |
| Starr Road over South Fork Rock Creek | 1959 | 16 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| I-90 over S Havana St | 1957 | 62,117 | Fair |
| I-90 over S Altamont St | 1957 | 58,628 | Good |
| I-90 over Sprague Ave | 2000 | 51,385 | Fair |
| I-90 over UPRR | 2000 | 51,385 | Good |
| I-90 over Sprague Ave | 2001 | 51,385 | Good |
| I-90 over UPRR | 2001 | 51,385 | Good |
| I-90 over City Streets | 1967 | 51,197 | Fair |
| I-90 over Viaduct Sta 1396 US 2 | 1967 | 51,197 | Fair |
| I-90 over 3RD Av & W-e Ramp | 1970 | 51,158 | Fair |
| US 2 over Spokane River | 1992 | 47,781 | Good |
Frequently asked questions
Are any bridges closed in Spokane County, Washington?
No bridges of the 309 in Spokane County are coded closed to all traffic in the 2025 National Bridge Inventory, and 22 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Washington department of transportation.
Have any bridges failed in Spokane County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Spokane County: no bridges with a component rated 2 (critical) or lower, 21 bridges rated poor overall, and 5 bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Spokane County last inspected?
Inspection dates in the 2025 inventory for Spokane County run from May 2021 to December 2024. Intervals: 5 on 12 months or less, 289 on 24 months, 15 on 48 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Spokane County → - all 309, busiest first, each with its own condition record.
All of Washington: Washington bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.