Pr 119 35.2 Km over Culebrinas River
San Sebastián Municipio, Puerto Rico · rated Poor in the 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
- Pr 119 35.2 Km over Culebrinas River in San Sebastián Municipio, Puerto Rico, is rated in poor condition in the 2025 National Bridge Inventory (as of ).
- Its lowest-rated component is the superstructure, rated 4 (poor condition) on the 0-9 scale.
- It was built in 1919 and reconstructed in 1964, making it 106 years old at the 2025 inventory.
- It carries about 7,200 vehicles a day (traffic count year 2017).
- Its listed owner is the state highway agency.
- It is one of 3 of the 32 inventoried bridges in San Sebastián Municipio rated poor (9.4%); 3 (9.4%) are rated poor.
- Its traffic status in the 2025 inventory is open, posting recommended but not legally implemented (NBI item 41).
- Its class is unchanged from 2024 (poor), but component ratings moved: substructure 4 to 5.
- Status change: its 2024 load posting has been removed.
- Its most recent inspection on record is dated November 2024, on a 12-month routine inspection cycle.
- It is coded scour critical (NBI item 113 = 3): scour critical: foundations unstable for the assessed or calculated scour.
- A poor rating means at least one major component - deck, superstructure, or substructure - is rated 4 or lower on FHWA's 0-9 scale. It does not by itself mean the bridge is unsafe; bridges judged unsafe are closed or load-restricted by their owners.
View this bridge on a map → (18.32947, -66.98561)
Component ratings
| Component | Rating (2024) | Rating (2025) | FHWA scale meaning |
|---|---|---|---|
| Deck | 5 | 5 | Fair condition |
| Superstructure | 4 | 4 | Poor condition |
| Substructure | 4 | 5 | Fair condition |
Bridge details
| Structure | Concrete tee beam |
| Length | about 45 ft |
| Location | 0.5 Km S E San Sebastian |
| NBI structure number | 002561 |
| Condition class | Poor |
| Traffic status (item 41) | Open, posting recommended but not legally implemented |
| Last inspection (item 90) | November 2024 |
| Inspection interval (item 91) | 12 months |
| Scour (item 113) | 3: scour critical: foundations unstable for the assessed or calculated scour |
Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.
Busiest bridges in San Sebastián Municipio
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 111 over El Salto Creek | 1980 | 26,000 | Poor |
| Pr 111 over El Salto Creek | 1980 | 26,000 | Good |
| Pr 111 15.1 Km over Aguas Saladas Creek | 1980 | 19,700 | Fair |
| Off Pr 111 15.4 Km over Culebrinas River | 1996 | 19,700 | Fair |
| Pr 111 18.5 Km over Guatemala River | 1978 | 19,100 | Good |
| Pr 111 over Waterway | 1980 | 18,000 | Fair |
All bridges nearby: San Sebastián Municipio, PR bridge conditions · every bridge in San Sebastián Municipio · Puerto Rico bridges.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.