Bridge conditions in San Sebastián Municipio, Puerto Rico
32 inventoried bridges · 0 closed · 10 posted · 3 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 32 bridges.
3 of the 32 bridges the federal inventory lists in San Sebastián Municipio are rated poor; the rest split 4 good and 25 fair.
- 3 of the 32 bridges in San Sebastián Municipio, Puerto Rico, are rated in poor condition (9.4%) in the 2025 National Bridge Inventory, as of .
- San Sebastián Municipio has no bridges closed to all traffic and 10 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 3 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; 4 bridges had at least one major component rating lowered.
- 1 bridge has a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from March 2023 to March 2025; 10 bridges over water are coded scour critical.
- 4 bridges (12.5%) are rated good and 25 (78.1%) fair.
- The median San Sebastián Municipio bridge was built in 1980.
- The busiest poor-rated bridge is Pr 111 over El Salto Creek (built 1980), carrying about 26,000 vehicles a day.
What this page is: the federal bridge inspection inventory for San Sebastián Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 12.5% · Fair 78.1% · Poor 9.4% of 32 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Local Road 1.5 Km over Guatemala River | good to fair; deck 7 to 5 | Good | Fair | 8,900 |
| Pr 423 2.3 Km over Culebrinas River | good to fair; deck 7 to 6 | Good | Fair | 1,800 |
| Pr 450 Km 2.24 over Unknown Creek | superstructure 7 to 5 | Fair | Fair | 100 |
| Pr-111 over Salto Collazo Creek | substructure 7 to 6; superstructure up 7 to 8 | Fair | Fair | 9,800 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 119 35.2 Km over Culebrinas River | load posting removed; substructure up 4 to 5 | Poor | Poor | 7,200 |
| Pr 119 35.1 Km over Salada Creek | load posting removed | Fair | Fair | 7,200 |
| J Torres St Km 0.1 over Rio Culebrinas | load posting removed | Poor | Poor | 5,900 |
| Off Pr 119 38.4 Km over Unnamed Creek | load posting removed | Fair | Fair | 4,800 |
2 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 111 18.5 Km over Guatemala River | posted for load | 1978 | 19,100 | June 2024 | Good |
| Pr 125 17.85 Km over Guatemala River | posted for load | 1917 | 14,200 | October 2024 | Fair |
| Pr 125 18.0 Km over Guatemala River | posted for load | 1940 | 14,200 | November 2024 | Fair |
| Pr 109 26 Km over Sonador River | posted for load | 1948 | 5,200 | November 2023 | Fair |
| Pr 119 39.4 Km over Sonador River | posted for load | 1921 | 4,800 | April 2024 | Fair |
| Pr 119 44.75 Km over Grande De A%asco River | posted for load | 1980 | 4,800 | June 2024 | Fair |
| Pr 109 over Culebrina River | posted for load | 1944 | 4,700 | March 2023 | Fair |
| Pr 109 over Larga Creek | posted for load | 1944 | 4,700 | March 2023 | Fair |
| Pr 447 over Guatemala River | posted for load | 1957 | 1,900 | October 2023 | Fair |
| Pr 497 2.2 Km over Sonadora Creek | posted for load | 1962 | 300 | October 2024 | Fair |
| Pr 111 over El Salto Creek | open on a temporary structure | 1980 | 26,000 | March 2025 | Poor |
| Pr 119 35.1 Km over Salada Creek | open, posting recommended | 1950 | 7,200 | October 2024 | Fair |
| Pr 119 35.2 Km over Culebrinas River | open, posting recommended | 1919 | 7,200 | November 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 9 on 12 months or less, 23 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in San Sebastián Municipio is dated March 2025; 3 bridges have an inspection dated in 2025.
Scour critical (item 113): 10 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 3 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 125 17.85 Km over Guatemala River | posted for load | 1917 | 14,200 | October 2024 | Fair |
| Pr 125 18.0 Km over Guatemala River | posted for load | 1940 | 14,200 | November 2024 | Fair |
| Off Pr 125 0.30 Km over Culebrinas River | open | 1979 | 12,000 | November 2024 | Fair |
| Pedro Albizu St. over Unknown Waterway | open | 1994 | 11,200 | March 2025 | Fair |
| Pr 119 35.2 Km over Culebrinas River | open, posting recommended | 1919 | 7,200 | November 2024 | Poor |
| J Torres St Km 0.1 over Rio Culebrinas | open | 1901 | 5,900 | September 2024 | Poor |
| Pr 109 over Larga Creek | posted for load | 1944 | 4,700 | March 2023 | Fair |
| Off Pr 125 16.9 Km over Culebrinas River | open | 1994 | 2,200 | June 2024 | Fair |
| Pr 125 12.6 Km over El Salto Creek | open | 1918 | 2,200 | October 2024 | Fair |
| Pr 497 2.2 Km over Sonadora Creek | posted for load | 1962 | 300 | October 2024 | Fair |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 111 over El Salto Creek | open on a temporary structure | 1980 | 26,000 | March 2025 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 111 over El Salto Creek | 1980 | 26,000 | Poor |
| Pr 119 35.2 Km over Culebrinas River | 1919 | 7,200 | Poor |
| J Torres St Km 0.1 over Rio Culebrinas | 1901 | 5,900 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 111 over El Salto Creek | 1980 | 26,000 | Poor |
| Pr 111 over El Salto Creek | 1980 | 26,000 | Good |
| Pr 111 15.1 Km over Aguas Saladas Creek | 1980 | 19,700 | Fair |
| Off Pr 111 15.4 Km over Culebrinas River | 1996 | 19,700 | Fair |
| Pr 111 18.5 Km over Guatemala River | 1978 | 19,100 | Good |
| Pr 111 over Waterway | 1980 | 18,000 | Fair |
| Pr 125 17.85 Km over Guatemala River | 1917 | 14,200 | Fair |
| Pr 125 18.0 Km over Guatemala River | 1940 | 14,200 | Fair |
| Pr 125 19.7 Km over Salada Creek | 1950 | 12,000 | Fair |
| Off Pr 125 0.30 Km over Culebrinas River | 1979 | 12,000 | Fair |
Frequently asked questions
Are any bridges closed in San Sebastián Municipio, Puerto Rico?
No bridges of the 32 in San Sebastián Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 10 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in San Sebastián Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for San Sebastián Municipio: 1 bridge with a component rated 2 (critical) or lower, 3 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in San Sebastián Municipio last inspected?
Inspection dates in the 2025 inventory for San Sebastián Municipio run from March 2023 to March 2025. Intervals: 9 on 12 months or less, 23 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in San Sebastián Municipio → - all 32, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.