BridgeReportCard
Home › Puerto Rico › Maricao Municipio › Pr 128 33.6 Km over Prieto River

Pr 128 33.6 Km over Prieto River

Maricao Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.16666, -66.86351)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck55Fair condition
Superstructure66Satisfactory condition
Substructure55Fair condition

Bridge details

StructureSteel stringer or multi-beam girder
Lengthabout 106 ft
Location12 Km East of Maricao
NBI structure number002611
Condition classFair
Traffic status (item 41)Posted for load
Last inspection (item 90)April 2024
Inspection interval (item 91)12 months
Scour (item 113)3: scour critical: foundations unstable for the assessed or calculated scour

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Maricao Municipio

BridgeBuiltVehicles/dayCondition
Pr 120 to 357km.01 over Maricao River19834,200Fair
Pr 357 0.7 Km over Maricao River19801,600Good
Pr 105 15.9 Km over Maricao River19211,000Fair
Pr 105 24.84 Km over Maricao River19201,000Fair
Pr 105 27.3 Km over Depression19221,000Fair
Pr 128 29.1 Km over Indiera River1921500Poor

All bridges nearby: Maricao Municipio, PR bridge conditions · every bridge in Maricao Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.