Bridge conditions in Maricao Municipio, Puerto Rico

14 inventoried bridges · 0 closed · 5 posted · 3 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 14 bridges.

Maricao Municipio has 3 bridges rated poor out of 14 inventoried, a 21.4% share that puts it well above the national rate of about 7%.

What this page is: the federal bridge inspection inventory for Maricao Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 7.1% · Fair 71.4% · Poor 21.4% of 14 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

0
dropped into poor
since 2024
0
improved out of poor
since 2024
3
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Off Pr 128 Km 31.3 over Unnamed Creeksubstructure 7 to 5FairFair500
Off Pr 128 Km 31.7 over Unnamed Creekdeck 7 to 5; substructure up 5 to 7FairFair500
Pr 120 to 357km.01 over Maricao Riverdeck 6 to 5FairFair4,200

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Local Road over San Antonio Riverload posting removedFairFair400

1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 105 15.9 Km over Maricao Riverposted for load19211,000November 2023Fair
Pr 105 27.3 Km over Depressionposted for load19221,000December 2024Fair
Pr 128 29.1 Km over Indiera Riverposted for load1921500September 2024Poor
Pr 128 33.6 Km over Prieto Riverposted for load1924300April 2024Fair
Off Pr 428 2.08 Km over Prieto Riverposted for load1968200September 2024Fair
Off Pr 428 2.08 Km over Prieto Riveropen on a temporary structure1968200September 2024Poor

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 5 on 12 months or less, 9 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Maricao Municipio is dated December 2024; 8 bridges have an inspection dated in 2024.

Scour critical (item 113): 6 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 2 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 120 to 357km.01 over Maricao Riveropen19834,200December 2023Fair
Pr 105 15.9 Km over Maricao Riverposted for load19211,000November 2023Fair
Pr 105 27.3 Km over Depressionposted for load19221,000December 2024Fair
Pr 128 29.1 Km over Indiera Riverposted for load1921500September 2024Poor
Local Road over San Antonio Riveropen1960400July 2023Fair
Pr 128 33.6 Km over Prieto Riverposted for load1924300April 2024Fair

Bridges with a component rated 2 or lower

2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Off Pr 428 2.08 Km over Prieto Riveropen on a temporary structure1968200September 2024Poor

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Pr 128 29.1 Km over Indiera River1921500Poor
Pr 105 28.9 Km over Lajas River1922300Poor
Off Pr 428 2.08 Km over Prieto River1968200Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 120 to 357km.01 over Maricao River19834,200Fair
Pr 357 0.7 Km over Maricao River19801,600Good
Pr 105 15.9 Km over Maricao River19211,000Fair
Pr 105 24.84 Km over Maricao River19201,000Fair
Pr 105 27.3 Km over Depression19221,000Fair
Pr 128 29.1 Km over Indiera River1921500Poor
Off Pr 128 Km 31.3 over Unnamed Creek2013500Fair
Off Pr 128 Km 31.7 over Unnamed Creek2013500Fair
Local Road over San Antonio River1960400Fair
Pr 105 28.9 Km over Lajas River1922300Poor

Frequently asked questions

Are any bridges closed in Maricao Municipio, Puerto Rico?

No bridges of the 14 in Maricao Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 5 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Maricao Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Maricao Municipio: 1 bridge with a component rated 2 (critical) or lower, 3 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Maricao Municipio last inspected?

Inspection dates in the 2025 inventory for Maricao Municipio run from July 2023 to December 2024. Intervals: 5 on 12 months or less, 9 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Maricao Municipio → - all 14, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.