BridgeReportCard
Home › Puerto Rico › Patillas Municipio › Pr 181 4.4 Km over Marin Creek

Pr 181 4.4 Km over Marin Creek

Patillas Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.03521, -66.00776)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck55Fair condition
Superstructure55Fair condition
Substructure66Satisfactory condition

Bridge details

StructureConcrete slab
Lengthabout 62 ft
Location3 Km North of Patillas
NBI structure number004051
Condition classFair
Traffic status (item 41)Posted for load
Last inspection (item 90)February 2024
Inspection interval (item 91)24 months
Scour (item 113)3: scour critical: foundations unstable for the assessed or calculated scour

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Patillas Municipio

BridgeBuiltVehicles/dayCondition
Pr 3R 0.5 Km over Irrigation Channel198648,600Fair
Pr 3 over Grande De Patillas River200313,900Good
Pr-3 over Irrigation Channel200913,900Good
Pr 181 34.1 Km over Irrigation Channel200911,900Good
Pr 3 117.9 Km over Jacaboa River19419,100Poor
Pr 3 123.8 Km over Chico River19518,300Fair

All bridges nearby: Patillas Municipio, PR bridge conditions · every bridge in Patillas Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.