Pr 181 6.05 Km over Coqui No 2 Creek
Patillas Municipio, Puerto Rico · rated Poor in the 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor Faded: the 10 nearest inventoried bridges in Patillas Municipio.
- Pr 181 6.05 Km over Coqui No 2 Creek in Patillas Municipio, Puerto Rico, is rated in poor condition in the 2025 National Bridge Inventory (as of ).
- Its lowest-rated component is the superstructure, rated 4 (poor condition) on the 0-9 scale.
- It was built in 1940, making it 85 years old at the 2025 inventory.
- It carries about 600 vehicles a day (traffic count year 2017).
- Its listed owner is the state highway agency.
- It is one of 6 of the 32 inventoried bridges in Patillas Municipio rated poor (18.8%); 6 (18.8%) are rated poor.
- Its traffic status in the 2025 inventory is open, no restriction (NBI item 41).
- It was rated fair in the 2024 inventory and is now poor (superstructure 5 to 4).
- Its most recent inspection on record is dated December 2024, on a 12-month routine inspection cycle.
- It is coded scour critical (NBI item 113 = 3): scour critical: foundations unstable for the assessed or calculated scour.
- A poor rating means at least one major component - deck, superstructure, or substructure - is rated 4 or lower on FHWA's 0-9 scale. It does not by itself mean the bridge is unsafe; bridges judged unsafe are closed or load-restricted by their owners.
Open this bridge in Google Maps → (18.03895, -65.99627)
Component ratings
| Component | Rating (2024) | Rating (2025) | FHWA scale meaning |
|---|---|---|---|
| Deck | 5 | 5 | Fair condition |
| Superstructure | 5 | 4 | Poor condition |
| Substructure | 6 | 6 | Satisfactory condition |
Bridge details
| Structure | Steel stringer or multi-beam girder |
| Length | about 34 ft |
| Location | 4 Km North of Patillas |
| NBI structure number | 004071 |
| Condition class | Poor |
| Traffic status (item 41) | Open, no restriction |
| Last inspection (item 90) | December 2024 |
| Inspection interval (item 91) | 12 months |
| Scour (item 113) | 3: scour critical: foundations unstable for the assessed or calculated scour |
Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.
Busiest bridges in Patillas Municipio
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 3R 0.5 Km over Irrigation Channel | 1986 | 48,600 | Fair |
| Pr 3 over Grande De Patillas River | 2003 | 13,900 | Good |
| Pr-3 over Irrigation Channel | 2009 | 13,900 | Good |
| Pr 181 34.1 Km over Irrigation Channel | 2009 | 11,900 | Good |
| Pr 3 117.9 Km over Jacaboa River | 1941 | 9,100 | Poor |
| Pr 3 123.8 Km over Chico River | 1951 | 8,300 | Fair |
All bridges nearby: Patillas Municipio, PR bridge conditions · every bridge in Patillas Municipio · Puerto Rico bridges.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.