BridgeReportCard
Home › Puerto Rico › Dorado Municipio › Pr 693 5.7 Km over Cocal River

Pr 693 5.7 Km over Cocal River

Dorado Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.45557, -66.25995)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck55Fair condition
Superstructure55Fair condition
Substructure55Fair condition

Bridge details

StructureSteel stringer or multi-beam girder
Lengthabout 38 ft
Location0.5 Km South of Dorado
NBI structure number005181
Condition classFair
Traffic status (item 41)Posted for load
Last inspection (item 90)December 2024
Inspection interval (item 91)12 months
Scour (item 113)3: scour critical: foundations unstable for the assessed or calculated scour

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Dorado Municipio

BridgeBuiltVehicles/dayCondition
Pr 22 Westbound over Pr 694199153,100Fair
Pr 22 Eastbound over Pr 694199126,550Fair
Pr 22 Westbound over Pr 659199126,550Fair
Pr 22 Eastbound over Pr 659199126,550Fair
Pr-693 over Drainage Channel198825,800Good
Pr 142 over Pr 2 25.9 Km200022,100Fair

All bridges nearby: Dorado Municipio, PR bridge conditions · every bridge in Dorado Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.