BridgeReportCard
Home › Puerto Rico › Dorado Municipio

Bridge conditions in Dorado Municipio, Puerto Rico

20 inventoried bridges · 0 closed · 5 posted · 0 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFair All 20 bridges.

None of the 20 inventoried bridges in Dorado Municipio are rated in poor condition in the current federal inventory. 5 are rated good and 15 fair.

What this page is: the federal bridge inspection inventory for Dorado Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 25.0% · Fair 75.0% · Poor 0.0% of 20 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

0
dropped into poor
since 2024
0
improved out of poor
since 2024
3
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Pr 699 0.1 Km over Creekgood to fair; deck 7 to 6GoodFair2,300
Pr 165R over La Plata Riversubstructure 7 to 5FairFair5,550
Pr 142 over Pr 2 25.9 Kmdeck 6 to 5FairFair22,100

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 165 19.85 Km over Unnamed Creekload posting removedGoodGood13,300

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 693 5.7 Km over Cocal Riverposted for load194519,900December 2024Fair
Pr 165 Km 18.15 over Cocal Riverposted for load195815,800December 2023Fair
Pr 165 over Unnamed Channelposted for load196115,800December 2023Fair
Pr 693 0.1 Km over Nuevo Riverposted for load192513,400February 2024Fair
Pr 165R 0.08 Km over Waterway Pluvial Controlposted for load19958,200January 2024Good
Pr 165 19.85 Km over Unnamed Creekopen, posting recommended196113,300December 2023Good

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 1 on 12 months or less, 19 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Dorado Municipio is dated December 2024; 11 bridges have an inspection dated in 2024.

Scour critical (item 113): 2 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 693 5.7 Km over Cocal Riverposted for load194519,900December 2024Fair
Pr 165R over La Plata Riveropen19975,550April 2023Fair

Bridges rated poor

No bridges in this county carry a poor rating in the current inventory.

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 22 Westbound over Pr 694199153,100Fair
Pr 22 Eastbound over Pr 694199126,550Fair
Pr 22 Westbound over Pr 659199126,550Fair
Pr 22 Eastbound over Pr 659199126,550Fair
Pr-693 over Drainage Channel198825,800Good
Pr 142 over Pr 2 25.9 Km200022,100Fair
Pr 142 2.80 Km over Creek200020,900Fair
Pr 693 5.7 Km over Cocal River194519,900Fair
Pr 6693 1.2 Km over Creek199619,900Good
Pr 165 Km 18.15 over Cocal River195815,800Fair

Frequently asked questions

Are any bridges closed in Dorado Municipio, Puerto Rico?

No bridges of the 20 in Dorado Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 5 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Dorado Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Dorado Municipio: no bridges with a component rated 2 (critical) or lower, no bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Dorado Municipio last inspected?

Inspection dates in the 2025 inventory for Dorado Municipio run from February 2023 to December 2024. Intervals: 1 on 12 months or less, 19 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Dorado Municipio → - all 20, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.