BridgeReportCard
Home › Puerto Rico › Río Grande Municipio › Pr 3 25.5 Km over Grande River

Pr 3 25.5 Km over Grande River

Río Grande Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.37541, -65.82428)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck55Fair condition
Superstructure77Good condition
Substructure77Good condition

Bridge details

StructurePrestressed concrete stringer or multi-beam girder
Lengthabout 166 ft
Location1 Km East of Rio Grande
NBI structure number011641
Condition classFair
Traffic status (item 41)Open, no restriction
Last inspection (item 90)May 2024
Inspection interval (item 91)24 months
Scour (item 113)8: foundations stable, scour above the top of the footing

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Río Grande Municipio

BridgeBuiltVehicles/dayCondition
Pr 3 over Espiritu Santo River197648,100Fair
Pr 3 over Juan Gonzalez Creek197648,100Fair
Pr 3 over Dirt Road197837,000Fair
Pr 3 30.7 Km over Cattle Pass197837,000Fair
Pr 3 21.45 Km over Angela Creek195636,700Fair
Pr 3 21.7 Km over Herrera River195636,700Fair

All bridges nearby: Río Grande Municipio, PR bridge conditions · every bridge in Río Grande Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.