Bridge conditions in Río Grande Municipio, Puerto Rico
48 inventoried bridges · 1 closed · 10 posted · 7 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 48 bridges.
Río Grande Municipio has 7 bridges rated poor out of 48 inventoried, a 14.6% share that puts it well above the national rate of about 7%.
- 7 of the 48 bridges in Río Grande Municipio, Puerto Rico, are rated in poor condition (14.6%) in the 2025 National Bridge Inventory, as of .
- Río Grande Municipio has 1 bridge closed to all traffic and 10 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 4 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; 5 bridges had at least one major component rating lowered, 1 newly load-posted.
- Inspection dates on record run from February 2023 to March 2025; 7 bridges over water are coded scour critical.
- 13 bridges (27.1%) are rated good and 28 (58.3%) fair.
- The median Río Grande Municipio bridge was built in 1978.
- The busiest poor-rated bridge is Pr 187 Km 29.9 over La Vega Creek (built 1940), carrying about 10,300 vehicles a day.
What this page is: the federal bridge inspection inventory for Río Grande Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 27.1% · Fair 58.3% · Poor 14.6% of 48 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Local Road over Depression | newly posted for load | Fair | Fair | 150 |
| Pr 66 19.1 Km over Pr 956 0.5 Km | good to fair; substructure 8 to 6 | Good | Fair | 21,100 |
| Pr-66 over Angola Creek | load posting removed; good to fair; deck 7 to 6 | Good | Fair | 10,500 |
| Pr-959 over Pr-66 | good to fair; deck 7 to 6 | Good | Fair | 4,200 |
| Pr 186 Km 19.9 over Sonadora Creek | reopened; superstructure 5 to 4 | Poor | Poor | 100 |
| Pr 955 6.2 Km over Mameyes Creek | deck 6 to 5; substructure 6 to 5 | Fair | Fair | 1,000 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 187 26.2 Km over Herrera River | load posting removed | Fair | Fair | 5,200 |
| Off Pr 186 26.7 Km over Grande Creek | load posting removed | Fair | Fair | 4,500 |
| Pr 955 over Juan Gonzalez Creek | load posting removed | Poor | Poor | 1,000 |
| Pr 191 Km 8.3 over El Salto Creek | load posting removed | Fair | Fair | 1,000 |
| Pr 958 4.0 Km over Herrera River | load posting removed | Fair | Fair | 600 |
1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 186 over Grande Creek | closed | 1940 | 200 | March 2025 | Poor |
| Pr-66 over Las Lajas River | posted for load | 2012 | 22,863 | August 2023 | Good |
| Pr 187 28.3 Km over CASTAÑON Channel | posted for load | 1927 | 5,200 | November 2024 | Poor |
| Pr 187 over San Luis Channel | posted for load | 2010 | 5,200 | August 2023 | Fair |
| Pr 191 6.3 Km over Depression | posted for load | 1939 | 1,000 | April 2024 | Poor |
| Off Pr 958 over Herreras River | posted for load | 1950 | 900 | November 2024 | Fair |
| Pr 186 over Grande River | posted for load | 1941 | 200 | March 2023 | Fair |
| Local Road over Depression | posted for load | 1956 | 150 | May 2023 | Fair |
| Off Pr 3 over Unnamed Creek | posted for load | 1995 | 100 | February 2023 | Fair |
| Pr 186 Km 19.9 over Sonadora Creek | posted for load | 1939 | 100 | February 2024 | Poor |
| Rural Local Road over Culebra Creek | posted for load | 2005 | 100 | February 2023 | Good |
| Pr 187 Km 29.9 over La Vega Creek | open on a temporary structure | 1940 | 10,300 | December 2024 | Poor |
| Off Pr 186 26.7 Km over Grande Creek | open, posting recommended | 1978 | 4,500 | March 2023 | Fair |
| Pr 191 Km 8.3 over El Salto Creek | open, posting recommended | 1939 | 1,000 | February 2024 | Fair |
| Pr 955 over Juan Gonzalez Creek | open, posting recommended | 1900 | 1,000 | March 2025 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 9 on 12 months or less, 39 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Río Grande Municipio is dated March 2025; 3 bridges have an inspection dated in 2025.
Scour critical (item 113): 7 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 3 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 3 over Juan Gonzalez Creek | open | 1976 | 48,100 | February 2023 | Fair |
| Pr 187 Km 29.9 over La Vega Creek | open on a temporary structure | 1940 | 10,300 | December 2024 | Poor |
| Pr 187 Km 29.9 over La Vega Creek | open | 1940 | 10,300 | March 2025 | Poor |
| Pr 187 28.3 Km over CASTAÑON Channel | posted for load | 1927 | 5,200 | November 2024 | Poor |
| Pr 191 over Creek | open | 1976 | 3,600 | October 2024 | Fair |
| Pr 191 Km 8.3 over El Salto Creek | open, posting recommended | 1939 | 1,000 | February 2024 | Fair |
| Off Pr 958 over Herreras River | posted for load | 1950 | 900 | November 2024 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 187 Km 29.9 over La Vega Creek | 1940 | 10,300 | Poor |
| Pr 187 Km 29.9 over La Vega Creek | 1940 | 10,300 | Poor |
| Pr 187 28.3 Km over CASTAÑON Channel | 1927 | 5,200 | Poor |
| Pr 955 over Juan Gonzalez Creek | 1900 | 1,000 | Poor |
| Pr 191 6.3 Km over Depression | 1939 | 1,000 | Poor |
| Pr 186 over Grande Creek | 1940 | 200 | Poor |
| Pr 186 Km 19.9 over Sonadora Creek | 1939 | 100 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 3 over Espiritu Santo River | 1976 | 48,100 | Fair |
| Pr 3 over Juan Gonzalez Creek | 1976 | 48,100 | Fair |
| Pr 3 25.5 Km over Grande River | 1976 | 47,900 | Fair |
| Pr 3 over Dirt Road | 1978 | 37,000 | Fair |
| Pr 3 30.7 Km over Cattle Pass | 1978 | 37,000 | Fair |
| Pr 3 21.45 Km over Angela Creek | 1956 | 36,700 | Fair |
| Pr 3 21.7 Km over Herrera River | 1956 | 36,700 | Fair |
| Pr 3 over Las Lajas Creek | 1998 | 36,700 | Good |
| Pr-66 over Herreras River & Creek | 2013 | 25,000 | Good |
| Pr-66 over Herreras River & Creek | 2013 | 25,000 | Good |
Frequently asked questions
Are any bridges closed in Río Grande Municipio, Puerto Rico?
1 bridge of the 48 in Río Grande Municipio is coded closed to all traffic in the 2025 National Bridge Inventory, and 10 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Río Grande Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Río Grande Municipio: no bridges with a component rated 2 (critical) or lower, 7 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Río Grande Municipio last inspected?
Inspection dates in the 2025 inventory for Río Grande Municipio run from February 2023 to March 2025. Intervals: 9 on 12 months or less, 39 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Río Grande Municipio → - all 48, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.