BridgeReportCard
Home › Puerto Rico › Utuado Municipio › Pr 123 62.5 Km over Waterway

Pr 123 62.5 Km over Waterway

Utuado Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.30849, -66.68919)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck66Satisfactory condition
Superstructure66Satisfactory condition
Substructure66Satisfactory condition

Bridge details

StructureConcrete slab
Lengthabout 20 ft
Location15 Km S E of Arecibo
NBI structure number012151
Condition classFair
Traffic status (item 41)Posted for load
Last inspection (item 90)February 2023
Inspection interval (item 91)24 months
Scour (item 113)8: foundations stable, scour above the top of the footing

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Utuado Municipio

BridgeBuiltVehicles/dayCondition
Pr 123 55.6 Km over Grande De Arecibo River198030,800Good
Pr 111R 2.1 Km over Matadero Creek192528,500Fair
Off Pr 111R 2.2 Km over Matadero Creek201128,500Fair
Pr 111 60.8 Km over Grande De Arecibo River196514,500Fair
Pr 10 52 Km over PR 621 3.5 KM & JOBS199011,300Fair
Pr 10 47.1 Km over Caguanas River199211,300Good

All bridges nearby: Utuado Municipio, PR bridge conditions · every bridge in Utuado Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.