Bridge conditions in Utuado Municipio, Puerto Rico
59 inventoried bridges · 0 closed · 19 posted · 14 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 59 bridges.
Of the 59 Utuado Municipio bridges in the federal inventory, 14 carry a poor rating. That 23.7% share is roughly 4x the national average.
- 14 of the 59 bridges in Utuado Municipio, Puerto Rico, are rated in poor condition (23.7%) in the 2025 National Bridge Inventory, as of .
- Utuado Municipio has no bridges closed to all traffic and 19 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 11 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 3 bridges dropped into poor condition and no bridges improved out of it; 5 bridges had at least one major component rating lowered.
- 4 bridges have a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from February 2023 to March 2025; 24 bridges over water are coded scour critical.
- 10 bridges (16.9%) are rated good and 35 (59.3%) fair.
- The median Utuado Municipio bridge was built in 1962.
- The busiest poor-rated bridge is Pr 111 over Vivi River (built 1965), carrying about 9,000 vehicles a day.
What this page is: the federal bridge inspection inventory for Utuado Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 16.9% · Fair 59.3% · Poor 23.7% of 59 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Off Pr 612 3.7 Km over Caonillas River | fair to poor; culvert 6 to 2 | Fair | Poor | 500 |
| Pr 123 59.7 Km over Caguanitas River | fair to poor; deck 6 to 5; substructure 5 to 4 | Fair | Poor | 5,000 |
| Pr 612 3.0 Km over Discharge Channel Aee | load posting removed; fair to poor; superstructure 5 to 4 | Fair | Poor | 200 |
| Pr 140 35.5 Km over Limon River | deck 6 to 5 | Fair | Fair | 9,800 |
| Pr 10 over PR 603 & WATERWAY | fair to good; deck 8 to 7; substructure up 6 to 7 | Fair | Good | 7,600 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 111R 2.1 Km over Matadero Creek | load posting removed | Fair | Fair | 28,500 |
| Pr 123 56.3 Km over Cambalache Creek | load posting removed | Poor | Poor | 7,800 |
| Pr 123 56.2 Km over Salto Abajo Creek | load posting removed | Poor | Poor | 7,800 |
| Pr 123 59.35 Km over El Muerto Creek | load posting removed | Poor | Poor | 5,000 |
| Pr 111 over Vivi River | load posting removed | Fair | Fair | 4,800 |
| Pr 111 over Tanama River | load posting removed | Fair | Fair | 4,500 |
| Pr 111 66.1 Km over Creek | load posting removed | Fair | Fair | 3,900 |
| Off Pr 140 Km 15 over Waterway Caonillas River | load posting removed | Fair | Fair | 2,100 |
| Pr 140 44.0 Km over Waterway | load posting removed | Fair | Fair | 1,200 |
| Pr 612 0.10 Km over Caonillas River | load posting removed | Fair | Fair | 200 |
| Pr 603 over Grande De Arecibo River | reopened | Poor | Poor | 100 |
| Off Pr 603 1.2 Km over Guaonica River | load posting removed; superstructure up 4 to 5 | Poor | Poor | 100 |
3 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 123 62.5 Km over Waterway | posted for load | 1940 | 16,400 | February 2023 | Fair |
| Pr 140 35.5 Km over Limon River | posted for load | 1955 | 9,800 | January 2024 | Fair |
| Pr 140 43.1 Km over Unnamed Creek | posted for load | 1950 | 9,800 | January 2024 | Fair |
| Pr 611 0.01 Km over Vivi River | posted for load | 1947 | 6,000 | May 2024 | Fair |
| Pr 123 Km 59.3 over Depression | posted for load | 1892 | 5,000 | September 2024 | Poor |
| Pr 111 64.2 Km over Salto Arriba Creek | posted for load | 1925 | 4,800 | December 2023 | Fair |
| Off Pr 111 Km 47.1 over Tanama River | posted for load | 1948 | 4,700 | April 2024 | Poor |
| Off Pr 123 @ Km 52 over Grande De Arecibo River | posted for load | 1976 | 3,400 | February 2023 | Fair |
| Pr 123 over Arenas Creek | posted for load | 1922 | 3,400 | March 2025 | Fair |
| Palma Street over Vivi River | posted for load | 1973 | 3,000 | May 2023 | Fair |
| Pr 111 over Criminales River | posted for load | 1927 | 2,400 | March 2025 | Fair |
| Off Pr 146 7.6 Km over Limon River | posted for load | 1960 | 1,300 | January 2024 | Fair |
| Pr 140 40.3 Km over La Venta River | posted for load | 1949 | 1,200 | January 2024 | Fair |
| Pr 140 43.35 Km over Waterway | posted for load | 1950 | 1,200 | February 2024 | Fair |
| Pr 140 43.90 Km over Waterway | posted for load | 1973 | 1,200 | April 2024 | Fair |
| Pr 140 44.7 Km over Yunes River | posted for load | 1925 | 1,200 | April 2024 | Fair |
| Off Pr 140 over Creek | posted for load | 1987 | 600 | May 2023 | Fair |
| Pr 140 over Caonillas Dam | posted for load | 1948 | 600 | March 2023 | Fair |
| Pr 605 5.8 Km over Vivi River | posted for load | 1925 | 500 | December 2023 | Fair |
| Pr 111 over Vivi River | open on a temporary structure | 1965 | 9,000 | May 2023 | Poor |
| Pr 123 56.3 Km over Cambalache Creek | open, posting recommended | 1892 | 7,800 | November 2024 | Poor |
| Pr 123 59.35 Km over El Muerto Creek | open, posting recommended | 1892 | 5,000 | September 2024 | Poor |
| Pr 111 66.1 Km over Creek | open, posting recommended | 1975 | 3,900 | February 2023 | Fair |
| Off Pr 140 Km 15 over Waterway Caonillas River | open, posting recommended | 2015 | 2,100 | August 2024 | Fair |
| Pr 140 44.0 Km over Waterway | open, posting recommended | 1950 | 1,200 | April 2024 | Fair |
| Rural Local Road over Grande De Arecibo River | open on a temporary structure | 1973 | 250 | May 2023 | Poor |
| Pr 612 0.10 Km over Caonillas River | open, posting recommended | 1943 | 200 | August 2024 | Fair |
| Pr 612 3.0 Km over Discharge Channel Aee | open, posting recommended | 1962 | 200 | March 2024 | Poor |
| Off Pr 603 1.2 Km over Guaonica River | open, posting recommended | 1972 | 100 | August 2024 | Poor |
| Pr 603 over Grande De Arecibo River | open on a temporary structure | 1947 | 100 | February 2023 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 15 on 12 months or less, 44 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Utuado Municipio is dated March 2025; 3 bridges have an inspection dated in 2025.
Scour critical (item 113): 24 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 12 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 123 55.6 Km over Grande De Arecibo River | open | 1980 | 30,800 | February 2023 | Good |
| Pr 111R 2.1 Km over Matadero Creek | open | 1925 | 28,500 | August 2023 | Fair |
| Pr 140 43.1 Km over Unnamed Creek | posted for load | 1950 | 9,800 | January 2024 | Fair |
| Pr 111 62.2 Km over Utuado Creek | open | 1965 | 9,000 | March 2025 | Poor |
| Pr 111 over Vivi River | open on a temporary structure | 1965 | 9,000 | May 2023 | Poor |
| Pr 111 over Vivi River | open | 1965 | 9,000 | May 2023 | Good |
| Pr 123 56.2 Km over Salto Abajo Creek | open | 1892 | 7,800 | November 2024 | Poor |
| Pr 611 0.01 Km over Vivi River | posted for load | 1947 | 6,000 | May 2024 | Fair |
| Pr 111 64.2 Km over Salto Arriba Creek | posted for load | 1925 | 4,800 | December 2023 | Fair |
| Pr 111 over Vivi River | open | 1925 | 4,800 | October 2024 | Fair |
| Off Pr 111 Km 47.1 over Tanama River | posted for load | 1948 | 4,700 | April 2024 | Poor |
| Off Pr 123 @ Km 52 over Grande De Arecibo River | posted for load | 1976 | 3,400 | February 2023 | Fair |
| Pr 123 over Arenas Creek | posted for load | 1922 | 3,400 | March 2025 | Fair |
| Palma Street over Vivi River | posted for load | 1973 | 3,000 | May 2023 | Fair |
| Pr 111 over Criminales River | posted for load | 1927 | 2,400 | March 2025 | Fair |
| Pr 140 40.3 Km over La Venta River | posted for load | 1949 | 1,200 | January 2024 | Fair |
| Off Pr 140 over Creek | posted for load | 1987 | 600 | May 2023 | Fair |
| Rural Local Road over Grande De Arecibo River | open on a temporary structure | 1973 | 250 | May 2023 | Poor |
| Rural Local Road over Grande De Arecibo River | open | 1973 | 250 | May 2023 | Good |
| Pr 612 3.0 Km over Discharge Channel Aee | open, posting recommended | 1962 | 200 | March 2024 | Poor |
| Off Pr 603 1.2 Km over Guaonica River | open, posting recommended | 1972 | 100 | August 2024 | Poor |
| Pr 603 1.6 Km over Guanico River | open | 1954 | 100 | December 2023 | Fair |
| Pr 603 over Grande De Arecibo River | open on a temporary structure | 1947 | 100 | February 2023 | Poor |
| Pr 603 over Grande De Arecibo River | open | 1947 | 100 | February 2024 | Fair |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 111 over Vivi River | open on a temporary structure | 1965 | 9,000 | May 2023 | Poor |
| Off Pr 612 3.7 Km over Caonillas River | open | 2012 | 500 | February 2024 | Poor |
| Rural Local Road over Grande De Arecibo River | open on a temporary structure | 1973 | 250 | May 2023 | Poor |
| Pr 603 over Grande De Arecibo River | open on a temporary structure | 1947 | 100 | February 2023 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 111 over Vivi River | 1965 | 9,000 | Poor |
| Pr 111 62.2 Km over Utuado Creek | 1965 | 9,000 | Poor |
| Pr 123 56.3 Km over Cambalache Creek | 1892 | 7,800 | Poor |
| Pr 123 56.2 Km over Salto Abajo Creek | 1892 | 7,800 | Poor |
| Pr 123 59.35 Km over El Muerto Creek | 1892 | 5,000 | Poor |
| Pr 123 Km 59.3 over Depression | 1892 | 5,000 | Poor |
| Pr 123 59.7 Km over Caguanitas River | 1976 | 5,000 | Poor |
| Off Pr 111 Km 47.1 over Tanama River | 1948 | 4,700 | Poor |
| Off Pr 123 48.1 Km over Adjuntas River | 1975 | 3,400 | Poor |
| Off Pr 612 3.7 Km over Caonillas River | 2012 | 500 | Poor |
| Rural Local Road over Grande De Arecibo River | 1973 | 250 | Poor |
| Pr 612 3.0 Km over Discharge Channel Aee | 1962 | 200 | Poor |
| Pr 603 over Grande De Arecibo River | 1947 | 100 | Poor |
| Off Pr 603 1.2 Km over Guaonica River | 1972 | 100 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 123 55.6 Km over Grande De Arecibo River | 1980 | 30,800 | Good |
| Pr 111R 2.1 Km over Matadero Creek | 1925 | 28,500 | Fair |
| Off Pr 111R 2.2 Km over Matadero Creek | 2011 | 28,500 | Fair |
| Pr 123 62.5 Km over Waterway | 1940 | 16,400 | Fair |
| Pr 111 60.8 Km over Grande De Arecibo River | 1965 | 14,500 | Fair |
| Pr 10 52 Km over PR 621 3.5 KM & JOBS | 1990 | 11,300 | Fair |
| Pr 10 47.1 Km over Caguanas River | 1992 | 11,300 | Good |
| Pr 140 35.5 Km over Limon River | 1955 | 9,800 | Fair |
| Pr 140 43.1 Km over Unnamed Creek | 1950 | 9,800 | Fair |
| Pr 111 over Vivi River | 1965 | 9,000 | Poor |
Frequently asked questions
Are any bridges closed in Utuado Municipio, Puerto Rico?
No bridges of the 59 in Utuado Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 19 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Utuado Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Utuado Municipio: 4 bridges with a component rated 2 (critical) or lower, 14 bridges rated poor overall, and 3 bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Utuado Municipio last inspected?
Inspection dates in the 2025 inventory for Utuado Municipio run from February 2023 to March 2025. Intervals: 15 on 12 months or less, 44 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Utuado Municipio → - all 59, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.