BridgeReportCard
Home › Puerto Rico › Utuado Municipio

Bridge conditions in Utuado Municipio, Puerto Rico

59 inventoried bridges · 0 closed · 19 posted · 14 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 59 bridges.

Of the 59 Utuado Municipio bridges in the federal inventory, 14 carry a poor rating. That 23.7% share is roughly 4x the national average.

What this page is: the federal bridge inspection inventory for Utuado Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 16.9% · Fair 59.3% · Poor 23.7% of 59 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

3
dropped into poor
since 2024
0
improved out of poor
since 2024
5
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Off Pr 612 3.7 Km over Caonillas Riverfair to poor; culvert 6 to 2FairPoor500
Pr 123 59.7 Km over Caguanitas Riverfair to poor; deck 6 to 5; substructure 5 to 4FairPoor5,000
Pr 612 3.0 Km over Discharge Channel Aeeload posting removed; fair to poor; superstructure 5 to 4FairPoor200
Pr 140 35.5 Km over Limon Riverdeck 6 to 5FairFair9,800
Pr 10 over PR 603 & WATERWAYfair to good; deck 8 to 7; substructure up 6 to 7FairGood7,600

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 111R 2.1 Km over Matadero Creekload posting removedFairFair28,500
Pr 123 56.3 Km over Cambalache Creekload posting removedPoorPoor7,800
Pr 123 56.2 Km over Salto Abajo Creekload posting removedPoorPoor7,800
Pr 123 59.35 Km over El Muerto Creekload posting removedPoorPoor5,000
Pr 111 over Vivi Riverload posting removedFairFair4,800
Pr 111 over Tanama Riverload posting removedFairFair4,500
Pr 111 66.1 Km over Creekload posting removedFairFair3,900
Off Pr 140 Km 15 over Waterway Caonillas Riverload posting removedFairFair2,100
Pr 140 44.0 Km over Waterwayload posting removedFairFair1,200
Pr 612 0.10 Km over Caonillas Riverload posting removedFairFair200
Pr 603 over Grande De Arecibo RiverreopenedPoorPoor100
Off Pr 603 1.2 Km over Guaonica Riverload posting removed; superstructure up 4 to 5PoorPoor100

3 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 123 62.5 Km over Waterwayposted for load194016,400February 2023Fair
Pr 140 35.5 Km over Limon Riverposted for load19559,800January 2024Fair
Pr 140 43.1 Km over Unnamed Creekposted for load19509,800January 2024Fair
Pr 611 0.01 Km over Vivi Riverposted for load19476,000May 2024Fair
Pr 123 Km 59.3 over Depressionposted for load18925,000September 2024Poor
Pr 111 64.2 Km over Salto Arriba Creekposted for load19254,800December 2023Fair
Off Pr 111 Km 47.1 over Tanama Riverposted for load19484,700April 2024Poor
Off Pr 123 @ Km 52 over Grande De Arecibo Riverposted for load19763,400February 2023Fair
Pr 123 over Arenas Creekposted for load19223,400March 2025Fair
Palma Street over Vivi Riverposted for load19733,000May 2023Fair
Pr 111 over Criminales Riverposted for load19272,400March 2025Fair
Off Pr 146 7.6 Km over Limon Riverposted for load19601,300January 2024Fair
Pr 140 40.3 Km over La Venta Riverposted for load19491,200January 2024Fair
Pr 140 43.35 Km over Waterwayposted for load19501,200February 2024Fair
Pr 140 43.90 Km over Waterwayposted for load19731,200April 2024Fair
Pr 140 44.7 Km over Yunes Riverposted for load19251,200April 2024Fair
Off Pr 140 over Creekposted for load1987600May 2023Fair
Pr 140 over Caonillas Damposted for load1948600March 2023Fair
Pr 605 5.8 Km over Vivi Riverposted for load1925500December 2023Fair
Pr 111 over Vivi Riveropen on a temporary structure19659,000May 2023Poor
Pr 123 56.3 Km over Cambalache Creekopen, posting recommended18927,800November 2024Poor
Pr 123 59.35 Km over El Muerto Creekopen, posting recommended18925,000September 2024Poor
Pr 111 66.1 Km over Creekopen, posting recommended19753,900February 2023Fair
Off Pr 140 Km 15 over Waterway Caonillas Riveropen, posting recommended20152,100August 2024Fair
Pr 140 44.0 Km over Waterwayopen, posting recommended19501,200April 2024Fair
Rural Local Road over Grande De Arecibo Riveropen on a temporary structure1973250May 2023Poor
Pr 612 0.10 Km over Caonillas Riveropen, posting recommended1943200August 2024Fair
Pr 612 3.0 Km over Discharge Channel Aeeopen, posting recommended1962200March 2024Poor
Off Pr 603 1.2 Km over Guaonica Riveropen, posting recommended1972100August 2024Poor
Pr 603 over Grande De Arecibo Riveropen on a temporary structure1947100February 2023Poor

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 15 on 12 months or less, 44 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Utuado Municipio is dated March 2025; 3 bridges have an inspection dated in 2025.

Scour critical (item 113): 24 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 12 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 123 55.6 Km over Grande De Arecibo Riveropen198030,800February 2023Good
Pr 111R 2.1 Km over Matadero Creekopen192528,500August 2023Fair
Pr 140 43.1 Km over Unnamed Creekposted for load19509,800January 2024Fair
Pr 111 62.2 Km over Utuado Creekopen19659,000March 2025Poor
Pr 111 over Vivi Riveropen on a temporary structure19659,000May 2023Poor
Pr 111 over Vivi Riveropen19659,000May 2023Good
Pr 123 56.2 Km over Salto Abajo Creekopen18927,800November 2024Poor
Pr 611 0.01 Km over Vivi Riverposted for load19476,000May 2024Fair
Pr 111 64.2 Km over Salto Arriba Creekposted for load19254,800December 2023Fair
Pr 111 over Vivi Riveropen19254,800October 2024Fair
Off Pr 111 Km 47.1 over Tanama Riverposted for load19484,700April 2024Poor
Off Pr 123 @ Km 52 over Grande De Arecibo Riverposted for load19763,400February 2023Fair
Pr 123 over Arenas Creekposted for load19223,400March 2025Fair
Palma Street over Vivi Riverposted for load19733,000May 2023Fair
Pr 111 over Criminales Riverposted for load19272,400March 2025Fair
Pr 140 40.3 Km over La Venta Riverposted for load19491,200January 2024Fair
Off Pr 140 over Creekposted for load1987600May 2023Fair
Rural Local Road over Grande De Arecibo Riveropen on a temporary structure1973250May 2023Poor
Rural Local Road over Grande De Arecibo Riveropen1973250May 2023Good
Pr 612 3.0 Km over Discharge Channel Aeeopen, posting recommended1962200March 2024Poor
Off Pr 603 1.2 Km over Guaonica Riveropen, posting recommended1972100August 2024Poor
Pr 603 1.6 Km over Guanico Riveropen1954100December 2023Fair
Pr 603 over Grande De Arecibo Riveropen on a temporary structure1947100February 2023Poor
Pr 603 over Grande De Arecibo Riveropen1947100February 2024Fair

Bridges with a component rated 2 or lower

2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 111 over Vivi Riveropen on a temporary structure19659,000May 2023Poor
Off Pr 612 3.7 Km over Caonillas Riveropen2012500February 2024Poor
Rural Local Road over Grande De Arecibo Riveropen on a temporary structure1973250May 2023Poor
Pr 603 over Grande De Arecibo Riveropen on a temporary structure1947100February 2023Poor

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Pr 111 over Vivi River19659,000Poor
Pr 111 62.2 Km over Utuado Creek19659,000Poor
Pr 123 56.3 Km over Cambalache Creek18927,800Poor
Pr 123 56.2 Km over Salto Abajo Creek18927,800Poor
Pr 123 59.35 Km over El Muerto Creek18925,000Poor
Pr 123 Km 59.3 over Depression18925,000Poor
Pr 123 59.7 Km over Caguanitas River19765,000Poor
Off Pr 111 Km 47.1 over Tanama River19484,700Poor
Off Pr 123 48.1 Km over Adjuntas River19753,400Poor
Off Pr 612 3.7 Km over Caonillas River2012500Poor
Rural Local Road over Grande De Arecibo River1973250Poor
Pr 612 3.0 Km over Discharge Channel Aee1962200Poor
Pr 603 over Grande De Arecibo River1947100Poor
Off Pr 603 1.2 Km over Guaonica River1972100Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 123 55.6 Km over Grande De Arecibo River198030,800Good
Pr 111R 2.1 Km over Matadero Creek192528,500Fair
Off Pr 111R 2.2 Km over Matadero Creek201128,500Fair
Pr 123 62.5 Km over Waterway194016,400Fair
Pr 111 60.8 Km over Grande De Arecibo River196514,500Fair
Pr 10 52 Km over PR 621 3.5 KM & JOBS199011,300Fair
Pr 10 47.1 Km over Caguanas River199211,300Good
Pr 140 35.5 Km over Limon River19559,800Fair
Pr 140 43.1 Km over Unnamed Creek19509,800Fair
Pr 111 over Vivi River19659,000Poor

Frequently asked questions

Are any bridges closed in Utuado Municipio, Puerto Rico?

No bridges of the 59 in Utuado Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 19 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Utuado Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Utuado Municipio: 4 bridges with a component rated 2 (critical) or lower, 14 bridges rated poor overall, and 3 bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Utuado Municipio last inspected?

Inspection dates in the 2025 inventory for Utuado Municipio run from February 2023 to March 2025. Intervals: 15 on 12 months or less, 44 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Utuado Municipio → - all 59, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.