BridgeReportCard
Home › Puerto Rico › Mayagüez Municipio › Pr 2R over Yaguez River

Pr 2R over Yaguez River

Mayagüez Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.206, -67.14)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck66Satisfactory condition
Superstructure77Good condition
Substructure77Good condition

Bridge details

StructurePrestressed concrete stringer or multi-beam girder
Lengthabout 81 ft
Locationat Front of Caam Entrance
NBI structure number012891
Condition classFair
Traffic status (item 41)Open, no restriction
Last inspection (item 90)May 2023
Inspection interval (item 91)24 months
Scour (item 113)8: foundations stable, scour above the top of the footing

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Mayagüez Municipio

BridgeBuiltVehicles/dayCondition
Pr 2 158.30 Km over Sabalos Channel199764,800Fair
Pr 2 159.4 Km over Hondo River196160,900Good
Pr 2 156.4 Km over Majagual Channel195857,700Fair
Pr 2 Ramal 4.9 Km over Waterway Channel199757,200Fair
Pr 2 over Sabalo Creek195856,100Fair
Pr 2 Ramal 2.3 Km over La Salud Creek194951,500Fair

All bridges nearby: Mayagüez Municipio, PR bridge conditions · every bridge in Mayagüez Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.