BridgeReportCard
Home › Puerto Rico › San Sebastián Municipio › Pr 455 over Guajataca River

Pr 455 over Guajataca River

San Sebastián Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.35949, -66.91306)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck66Satisfactory condition
Superstructure77Good condition
Substructure66Satisfactory condition

Bridge details

StructurePrestressed concrete stringer or multi-beam girder
Lengthabout 240 ft
Location9.4 Km N E San Sebastian
NBI structure number014041
Condition classFair
Traffic status (item 41)Open, no restriction
Last inspection (item 90)April 2023
Inspection interval (item 91)24 months
Scour (item 113)8: foundations stable, scour above the top of the footing

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in San Sebastián Municipio

BridgeBuiltVehicles/dayCondition
Pr 111 over El Salto Creek198026,000Poor
Pr 111 over El Salto Creek198026,000Good
Pr 111 15.1 Km over Aguas Saladas Creek198019,700Fair
Off Pr 111 15.4 Km over Culebrinas River199619,700Fair
Pr 111 18.5 Km over Guatemala River197819,100Good
Pr 111 over Waterway198018,000Fair

All bridges nearby: San Sebastián Municipio, PR bridge conditions · every bridge in San Sebastián Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.